10064 N LEV AVE 91331

Certificate Information: 10064 N LEV AVE 91331

Application / Permit
23014-20000-02277
Plan Check / Job No.
B23VN07564
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN. PROPOSED TWO STORY ADU ADDITION (1197 SF) TO AN EXISTING DETACHED GARAGE PER LAMC 12.22 A.33 (c)-(d ).
Permit Issued
Issued on 12/15/2023
Issuing Office
Current Status
CofO Issued on 11/14/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/8/2023 APPLICANT
Assigned to Plan Check Engineer 6/8/2023 RAHEL BEYENE
Corrections Issued 6/10/2023 RAHEL BEYENE
Quality Review Completed 7/7/2023 MICHAEL PEREZ
Applicant returned to address corrections 10/20/2023 RAHEL BEYENE
Applicant returned to address corrections 12/11/2023 RAHEL BEYENE
Plan Check Approved 12/14/2023 RAHEL BEYENE
Issued 12/15/2023 APPLICANT
CofO in Progress 11/6/2024 MICHEL ABAJAN
Permit Finaled 11/14/2024 DANIEL ORRANTE
CofO Issued 11/14/2024 DANIEL ORRANTE
Permit Finaled 11/14/2024 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 6/23/2023 MEGAN GODINEZ
Eng Process Fee Ord 176,300 Cleared 7/3/2023 MEGAN GODINEZ
Sewer availability Cleared 7/3/2023 MEGAN GODINEZ
Construction near power lines Cleared 8/17/2023 RIDWAN HARDY
Low Impact Development (LID) Cleared 9/13/2023 LUIS LUVANO
Roof/Waste drainage to street Cleared 9/15/2023 MEGAN GODINEZ

Contact Information

Contractor R L Remodeling Inc; Lic. No.: 885032-B       ,
Engineer Sivushenka,, Mikita; Lic. No.: NA87698       ,
Geologist Kaligi,, Adam Azad; Lic. No.: GEO9287 19197 GOLDEN VALLEY RD #709      SANTA CLARITA, CA 91387

Inspector Information

MICHEL ABAJAN, (818) 374-9932 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 12/27/2023 Corrections Issued MICHEL ABAJAN
Footing/Foundation/Slab 12/27/2023 Not Ready for Inspection MICHEL ABAJAN
METHANE-Barrier 12/27/2023 Not Ready for Inspection MICHEL ABAJAN
METHANE-Subgrade 12/27/2023 Not Ready for Inspection MICHEL ABAJAN
Pre-Inspection 12/27/2023 Partial Inspection MICHEL ABAJAN
Underground Mechanical 12/27/2023 Not Ready for Inspection MICHEL ABAJAN
Deputy Drilled-In Anchors 12/28/2023 Conditional Approval ROBERT GOLD
METHANE-Rough 1/3/2024 Partial Inspection KEVIN BERBERYAN
Underground Mechanical 1/3/2024 Partial Approval KEVIN BERBERYAN
Excavation/Setback/Form/Re-Bar 1/8/2024 Approved MICHEL ABAJAN
Footing/Foundation/Slab 1/8/2024 Approved MICHEL ABAJAN
METHANE-Barrier 1/8/2024 Approved MICHEL ABAJAN
METHANE-Subgrade 1/8/2024 Approved MICHEL ABAJAN
Excavation/Setback/Form/Re-Bar 1/9/2024 Partial Inspection MICHEL ABAJAN
METHANE-Rough 1/9/2024 Partial Inspection MICHEL ABAJAN
Floor/Roof Diaphrgm/Shear Wall 1/26/2024 Partial Approval MISAEL ESPARZA
ELECTRICAL-Rough 3/4/2024 Approved MICHEL ABAJAN
Floor/Roof Diaphrgm/Shear Wall 3/4/2024 Partial Approval MICHEL ABAJAN
Deputy Wood Construction 3/5/2024 Conditional Approval ROBERT GOLD
BUILDING-Rough-Frame 3/26/2024 Corrections Issued MICHEL ABAJAN
HVAC-Rough 3/26/2024 Approved MICHEL ABAJAN
MERV13>=Rough 3/26/2024 Approved MICHEL ABAJAN
METHANE-Rough 3/26/2024 Approved MICHEL ABAJAN
PLUMBING-Rough 3/26/2024 Approved MICHEL ABAJAN
Insulation 4/3/2024 Approved MICHEL ABAJAN
Interior/Exterior Lathing 4/3/2024 Approved MICHEL ABAJAN
Shower Pan 4/3/2024 Approved MICHEL ABAJAN
Drywall Nailing 4/11/2024 Partial Approval LEONARD ROSS II
BUILDING-Rough-Frame 4/12/2024 Corrections Issued ROBERT GOLD
BUILDING-Rough-Frame 11/5/2024 Approved MICHEL ABAJAN
Drywall Nailing 11/5/2024 Approved MICHEL ABAJAN
ELECTRICAL-Final 11/5/2024 Approved MICHEL ABAJAN
Final 11/5/2024 OK to Issue CofO MICHEL ABAJAN
HVAC-Final 11/5/2024 Approved MICHEL ABAJAN
MERV13>=Final 11/5/2024 Approved MICHEL ABAJAN
PLUMBING-Final 11/5/2024 Approved MICHEL ABAJAN
SGSOV-Seismic Gas S/O Valve 11/5/2024 SGSOV Approved MICHEL ABAJAN
Smoke Detectors 11/5/2024 Approved MICHEL ABAJAN