3520 S MCLAUGHLIN AVE 90066

Certificate Information: 3520 S MCLAUGHLIN AVE 90066

Application / Permit
23014-20000-02102
Plan Check / Job No.
B23VN06934
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
MAJOR REMODEL/ADDITION TO REMOVE ENTIRE 1-STORY SINGLE FAMILY DWELLING 1460 SQFT EXCEPT FOR PORTION OF WALL AND RAISED FLOOR, AND BUILD NEW (43'-0"x45'-5"), 3182 SQFT SINGLE FAMILY DWELLING W/ATTACHED COVERED PATIO (82 SQFT) AND FRONT COVERED PORCH (48 SQFT) W/NFPA 13D SPRINKLERS THROUGHOUT
Permit Issued
Issued on 10/20/2023
Issuing Office
Current Status
CofO Issued on 9/16/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/26/2023 APPLICANT
Assigned to Plan Check Engineer 6/8/2023 PETER MOSESIAN
Corrections Issued 6/13/2023 PETER MOSESIAN
Quality Review Completed 6/21/2023 OMID HEDAYAT
Building Plans Picked Up 6/26/2023 APPLICANT
Plan Check Approved 10/2/2023 PETER MOSESIAN
Issued 10/20/2023 APPLICANT
CofO in Progress 9/10/2024 HERBERT GIRON
Permit Finaled 9/16/2024 RICHARD STEINBACH
CofO Issued 9/16/2024 RICHARD STEINBACH
Permit Finaled 9/16/2024 RICHARD STEINBACH

Permit Application Clearance Information

Specific Plan Cleared 8/3/2023 JOSHUA JONES
Eng Process Fee Ord 176,300 Cleared 8/21/2023 ANTHONY MAINEZ
Low Impact Development (LID) Cleared 8/21/2023 SAMUEL LINN
Roof/Waste drainage to street Cleared 8/21/2023 ANTHONY MAINEZ
Sewer availability Cleared 8/21/2023 ANTHONY MAINEZ

Contact Information

Architect Landworth,, Lisa; Lic. No.: C19043 5150 WILSHIRE BLVD #503      LOS ANGELES, CA 90036
Contractor Nittay Inc; Lic. No.: 1033506-B 17941 VENTURA BLVD #204      ENCINO, CA 91316
Engineer Yenjai,, Seree; Lic. No.: C73151 3249 SHADYLAWN DRIVE      DUARTE, CA 91010

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 12/7/2023 Corrections Issued KENNETH NAGLE
Excavation/Setback/Form/Re-Bar 12/8/2023 Approved KENNETH NAGLE
PLUMBING-Rough 12/18/2023 Partial Approval JESUS PINEDA
Wood Frame 12/26/2023 Partial Approval BEN MOLSTAD
Floor/Roof Diaphrgm/Shear Wall 1/5/2024 Partial Approval KENNETH NAGLE
Floor/Roof Diaphrgm/Shear Wall 1/16/2024 Corrections Issued JESUS PINEDA
HVAC-Rough 1/23/2024 Approved JESUS PINEDA
PLUMBING-Rough 1/23/2024 Corrections Issued JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 1/31/2024 Partial Approval JESUS PINEDA
Shower Pan 1/31/2024 Corrections Issued JESUS PINEDA
PLUMBING-Rough 2/7/2024 Approved JESUS PINEDA
Shower Pan 2/7/2024 Approved JESUS PINEDA
Deputy Drilled-In Anchors 2/9/2024 Conditional Approval RICHARD STEINBACH
Interior/Exterior Lathing 2/9/2024 Partial Approval RICHARD STEINBACH
Deputy Drilled-In Anchors 2/12/2024 Conditional Approval MICHAEL PELHAM
Deputy Wood Construction 2/12/2024 Conditional Approval JESUS PINEDA
ELECTRICAL-Rough 2/14/2024 Approved TEMISTOCLES CAAL
Floor/Roof Diaphrgm/Shear Wall 2/14/2024 Partial Approval TEMISTOCLES CAAL
Underground Mechanical 2/14/2024 Approved TEMISTOCLES CAAL
Interior/Exterior Lathing 2/20/2024 Corrections Issued JESUS PINEDA
BUILDING-Rough-Frame 2/22/2024 Conditional Approval TEMISTOCLES CAAL
Green Building Rough 2/22/2024 Approved TEMISTOCLES CAAL
Interior/Exterior Lathing 2/22/2024 Approved TEMISTOCLES CAAL
Interior/Exterior Lathing 2/23/2024 Partial Inspection KENNETH NAGLE
BUILDING-Rough-Frame 2/27/2024 Partial Approval JESUS PINEDA
Insulation 2/27/2024 Approved JESUS PINEDA
Verify Sprinkler Sign Off 2/27/2024 Approved JESUS PINEDA
Drywall Nailing 3/4/2024 Approved JESUS PINEDA
BUILDING-Rough-Frame 7/25/2024 Corrections Issued TEMISTOCLES CAAL
Final 7/25/2024 Corrections Issued TEMISTOCLES CAAL
Footing/Foundation/Slab 7/25/2024 Approved TEMISTOCLES CAAL
Green Building Final 7/25/2024 Approved TEMISTOCLES CAAL
SGSOV-Seismic Gas S/O Valve 7/25/2024 SGSOV Approved TEMISTOCLES CAAL
Smoke Detectors 7/25/2024 Approved TEMISTOCLES CAAL
ELECTRICAL-Final 7/26/2024 Approved SEAN HAUPT
Final 7/26/2024 Corrections Issued SEAN HAUPT
HVAC-Final 7/26/2024 Approved SEAN HAUPT
PLUMBING-Final 7/26/2024 Approved SEAN HAUPT
BUILDING-Rough-Frame 8/23/2024 Not Ready for Inspection DANIEL VERA
ELECTRICAL-Final 8/23/2024 Approved DANIEL VERA
Final 8/23/2024 Not Ready for Inspection DANIEL VERA
HVAC-Final 8/23/2024 Not Ready for Inspection DANIEL VERA
PLUMBING-Final 8/23/2024 Not Ready for Inspection DANIEL VERA
BUILDING-Rough-Frame 8/27/2024 Corrections Issued DANIEL VERA
Final 8/27/2024 Corrections Issued DANIEL VERA
BUILDING-Rough-Frame 8/30/2024 Partial Approval DANIEL VERA
Final 8/30/2024 Partial Inspection DANIEL VERA
BUILDING-Rough-Frame 9/9/2024 Approved HERBERT GIRON
Final 9/9/2024 OK to Issue CofO HERBERT GIRON
Service/Power Release 9/9/2024 Approved HERBERT GIRON