12246 W HARTSOOK ST 91607

Certificate Information: 12246 W HARTSOOK ST 91607

Application / Permit
23014-20000-01901
Plan Check / Job No.
B23VN06333
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ENCLOSE AND CONVERT 10'-10" X 13'-8" COVERED PATIO TO BEDROOM. INTERIOR REMODEL TO (E) BATHROOM AND (E) BEDROOM.
Permit Issued
Issued on 7/5/2023
Issuing Office
Valley
Current Status
Permit Finaled on 6/12/2024

Permit Application Status History

Submitted 5/15/2023 APPLICANT
Assigned to Plan Check Engineer 5/18/2023 JEROME MAGAT PALMA
Corrections Issued 5/20/2023 JEROME MAGAT PALMA
Building Plans Picked Up 5/23/2023 APPLICANT
Plan Check Approved 6/28/2023 ROSENDO MEDINA
Issued 7/5/2023 APPLICANT
Permit Finaled 6/11/2024 OGANES TARAKHCHYAN

Permit Application Clearance Information

Specific Plan Cleared 6/5/2023 JOANNA MARROQUIN
Eng Process Fee Ord 176,300 Cleared 6/8/2023 FERNANDO GIL
Sewer availability Cleared 6/8/2023 FERNANDO GIL

Contact Information

Contractor Owner-Builder       ,
Engineer Basma,, Ali J; Lic. No.: C53080 21757 DEVONSHIRE ST.   SUITE 3    CANOGA PARK, CA 91311

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/18/2024 Approved JOSE AVILA
Footing/Foundation/Slab 3/18/2024 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 3/20/2024 Approved JOSE AVILA
Footing/Foundation/Slab 3/20/2024 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 3/26/2024 Partial Approval ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 4/10/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Rough 4/10/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 4/10/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 4/26/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Rough 4/26/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 4/26/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 4/26/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 5/1/2024 Corrections Issued MISAEL ESPARZA
ELECTRICAL-Rough 5/1/2024 Approved MISAEL ESPARZA
Green Building Rough 5/1/2024 Approved MISAEL ESPARZA
Wood Frame 5/1/2024 Not Ready for Inspection MISAEL ESPARZA
BUILDING-Rough-Frame 5/3/2024 Approved MISAEL ESPARZA
Insulation 5/3/2024 Approved MISAEL ESPARZA
Drywall Nailing 5/8/2024 Approved JOHN COLEMAN
Final 6/11/2024 Permit Finaled OGANES TARAKHCHYAN
Green Building Final 6/11/2024 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 6/11/2024 SGSOV Approved OGANES TARAKHCHYAN
Smoke Detectors 6/11/2024 Approved OGANES TARAKHCHYAN