312 1/2 E 76TH ST 90003

Certificate Information: 312 1/2 E 76TH ST 90003

Application / Permit
23014-20000-01340
Plan Check / Job No.
B23VN04390
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
6'-3" X 19'-0" ADDITION TO AND CONVERT EXISTING DETACHED 20'-0" X 19'-0" GARAGE INTO ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d) - PER ENGINEER **NFPA-13D FIRE-SPRINIKLERS REQUIRED
Permit Issued
Issued on 8/21/2023
Issuing Office
Current Status
Issued on 8/21/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/7/2023 APPLICANT
Assigned to Plan Check Engineer 4/14/2023 DANIEL ABRAMYAN
Corrections Issued 4/17/2023 DANIEL ABRAMYAN
Plan Check Approved 8/4/2023 OMAR GARNICA
Plan Check Approved 8/18/2023 OMAR GARNICA
Issued 8/21/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 5/24/2023 HUGO LOPEZ
Eng Process Fee Ord 176,300 Cleared 5/24/2023 HUGO LOPEZ
Roof/Waste drainage to street Cleared 5/24/2023 HUGO LOPEZ
Sewer availability Cleared 5/24/2023 HUGO LOPEZ
Construction within easement Cleared 8/2/2023 RIDWAN HARDY

Contact Information

Contractor Benzaquen Slocovich Katherine; Lic. No.: 1079161-B       ,
Contractor K&K Construction; Lic. No.: 1079161-B       ,
Engineer Gonzalez,, Fernando Francisco; Lic. No.: NA53256       ,

Inspector Information

JOHN QUINTANILLA, (213) 792-6055 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 9/25/2023 Approved MICHAEL LEWIS
Footing/Foundation/Slab 9/25/2023 Approved MICHAEL LEWIS
Underground Mechanical 9/25/2023 Approved MICHAEL LEWIS
ELECTRICAL-Rough 11/15/2023 Approved MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 11/15/2023 Partial Approval MICHAEL LEWIS
HVAC-Rough 11/15/2023 Corrections Issued MICHAEL LEWIS
PLUMBING-Rough 11/15/2023 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 11/29/2023 Corrections Issued MICHAEL LEWIS
Green Building Rough 11/29/2023 Approved MICHAEL LEWIS
Insulation 11/29/2023 Partial Approval MICHAEL LEWIS
Interior/Exterior Lathing 11/29/2023 Approved MICHAEL LEWIS
Wood Frame 11/29/2023 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 12/22/2023 Approved MICHAEL LEWIS
Green Building Rough 12/22/2023 Approved MICHAEL LEWIS
Insulation 12/22/2023 Conditional Approval MICHAEL LEWIS
Verify Sprinkler Sign Off 12/22/2023 Approved MICHAEL LEWIS
Drywall Nailing 12/29/2023 Approved MICHAEL LEWIS
SGSOV-Seismic Gas S/O Valve 2/14/2024 SGSOV Not Ready MICHAEL LEWIS
SGSOV-Seismic Gas S/O Valve 2/28/2024 SGSOV Not Ready RONNIE MINDANAO