2906-2908 N DELOR DR 90032

Certificate Information: 2906-2908 N DELOR DR 90032

Application / Permit
23014-20000-00634
Plan Check / Job No.
B23VN01989
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT (E) ATTACHED GARAGE (447SQFT) AND PORTION OF (E) SFD (339SQFT) AT LOWER LEVEL TO ACCESSORY DWELLING UNIT (786SQFT) PER GCS 65852.2(e)(1) (P) 199SQFT ADDITION & 372SQFT CARPORT AT FRONT FOR BUILDING (P) OPEN TRELLIS (162SQFT) AT REAR BUILDING
Permit Issued
Issued on 8/31/2023
Issuing Office
Valley
Current Status
CofO Issued on 4/13/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/16/2023 APPLICANT
Assigned to Plan Check Engineer 2/24/2023 ARTIN ZARUKIAN
Corrections Issued 2/25/2023 ARTIN ZARUKIAN
Building Plans Picked Up 2/27/2023 APPLICANT
Applicant returned to address corrections 8/17/2023 DANIEL SANJUAN
Plan Check Approved 8/28/2023 KHUONG TRUONG
Issued 8/31/2023 APPLICANT
CofO in Progress 3/13/2024 LILIANA PORTILLO
Permit Finaled 4/13/2024 DEROLD HAUFF
CofO Issued 4/13/2024 DEROLD HAUFF
Permit Finaled 4/13/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 6/3/2023 KEVIN AVILA
Disturb/Remove Protected Trees Cleared 6/12/2023 ADALBERTO VERA
Eng Process Fee Ord 176,300 Cleared 7/30/2023 ADRIAN SANCHEZ
Roof/Waste drainage to street Cleared 7/30/2023 ADRIAN SANCHEZ
Sewer availability Cleared 7/30/2023 ADRIAN SANCHEZ
"D" conditions Cleared 8/11/2023 DANIEL CORONADO
"Q" conditions Cleared 8/11/2023 DANIEL CORONADO
ZI Cleared 8/11/2023 DANIEL CORONADO
Grading Pre-Inspection Cleared 8/17/2023 ARTIN ZARUKIAN
GPI Written Notices Cleared 8/28/2023 ARTIN ZARUKIAN

Contact Information

Contractor Warren Development Llc; Lic. No.: 1098736-B 12722 NORRIS AVE      SYLMAR, CA 91342
Engineer Medina,, Armando; Lic. No.: C83911 2000 W LINCOLN AVE      MONTEBELLO, CA 90640
Engineer Salehipour,, Sassan A; Lic. No.: GE2579 1290 N LAKE AVENUE #204      PASADENA, CA 91104

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 9/5/2023 Partial Approval AMY COLIN
Footing/Foundation/Slab 9/8/2023 Corrections Issued ALIZAH MAYAGOITIA
Footing/Foundation/Slab 9/13/2023 Approved AMY COLIN
PLUMBING-Rough 9/25/2023 Partial Approval AMY COLIN
HVAC-Rough 9/27/2023 Corrections Issued AMY COLIN
HVAC-Rough 10/3/2023 Approved AMY COLIN
PLUMBING-Rough 10/3/2023 Approved AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 10/10/2023 Partial Approval AMY COLIN
PLUMBING-Rough 10/10/2023 Partial Approval AMY COLIN
ELECTRICAL-Rough 10/11/2023 Approved AMY COLIN
Green Building Rough 10/11/2023 Not Ready for Inspection AMY COLIN
ELECTRICAL-Rough 10/13/2023 Approved AMY COLIN
HVAC-Rough 10/13/2023 Approved AMY COLIN
PLUMBING-Rough 10/13/2023 Approved AMY COLIN
BUILDING-Rough-Frame 10/24/2023 Not Ready for Inspection AMY COLIN
Interior/Exterior Lathing 11/1/2023 Partial Approval AMY COLIN
BUILDING-Rough-Frame 11/2/2023 Corrections Issued AMY COLIN
Drywall Nailing 11/2/2023 Not Ready for Inspection AMY COLIN
Green Building Rough 11/2/2023 Not Ready for Inspection AMY COLIN
Insulation 11/2/2023 Not Ready for Inspection AMY COLIN
Drywall Nailing 11/6/2023 Not Ready for Inspection AMY COLIN
Green Building Rough 11/6/2023 Approved AMY COLIN
Insulation 11/6/2023 Approved AMY COLIN
Interior/Exterior Lathing 11/6/2023 Approved AMY COLIN
Shower Pan 12/8/2023 Approved AMY COLIN
Interior/Exterior Lathing 12/12/2023 Approved AMY COLIN
BUILDING-Rough-Frame 1/5/2024 Approved AMY COLIN
SGSOV-Seismic Gas S/O Valve 1/5/2024 SGSOV Not Ready AMY COLIN
SGSOV-Seismic Gas S/O Valve 1/26/2024 SGSOV Not Ready AMY COLIN
SGSOV-Seismic Gas S/O Valve 2/1/2024 SGSOV Not Ready ALIZAH MAYAGOITIA
ELECTRICAL-Final 2/2/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
HVAC-Final 2/2/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
PLUMBING-Final 2/2/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 2/6/2024 Approved OSVALDO PARAMO
Drywall Nailing 2/6/2024 Approved OSVALDO PARAMO
Final 2/6/2024 Corrections Issued OSVALDO PARAMO
Green Building Final 2/6/2024 Approved OSVALDO PARAMO
Green Building Rough 2/6/2024 Approved OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 2/6/2024 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 2/6/2024 Approved OSVALDO PARAMO
Final 2/26/2024 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Final 3/12/2024 Approved LILIANA PORTILLO
Final 3/12/2024 OK to Issue CofO LILIANA PORTILLO
HVAC-Final 3/12/2024 Approved LILIANA PORTILLO
PLUMBING-Final 3/12/2024 Approved LILIANA PORTILLO