1164 1/2 W 28TH ST 90007

Certificate Information: 1164 1/2 W 28TH ST 90007

Application / Permit
23014-20000-00342
Plan Check / Job No.
B23VN00905
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: 29' X 10" X 24' 8" 2-STORY ACCESSORY DWELLING UNIT ADDITION W/ 6'-0" X 6'-0" PORCH TO (E) DETACHED GARAGE PER LAMC 12.22A.33(C) AND (D). ALL WORK DONE PER ENGINEERING.
Permit Issued
Issued on 12/4/2023
Issuing Office
Current Status
Issued on 12/4/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/26/2023 APPLICANT
Assigned to Plan Check Engineer 2/3/2023 GURUNATH NESARAJAH
Corrections Issued 2/4/2023 GURUNATH NESARAJAH
Applicant returned to address corrections 7/13/2023 ALFRED RAMIREZ
Applicant returned to address corrections 7/18/2023 ALFRED RAMIREZ
Plan Check Approved 7/27/2023 ALFRED RAMIREZ
Issued 12/4/2023 APPLICANT

Permit Application Clearance Information

ZA Case Cleared 2/7/2023 RUBEN VASQUEZ
ZI Cleared 2/7/2023 RUBEN VASQUEZ
ZI Cleared 2/7/2023 RUBEN VASQUEZ
Address approval Cleared 2/15/2023 CINDY QI
Eng Process Fee Ord 176,300 Cleared 2/23/2023 AMAAN MALIK
Sewer availability Cleared 2/23/2023 AMAAN MALIK
Stormwater Pollution Mitigatn Cleared 5/30/2023 TOMMY YIN
Roof/Waste drainage to street Cleared 6/1/2023 TREVOR QUAN
Specific Plan Cleared 6/29/2023 DANIEL MATA

Contact Information

Contractor Owner-Builder       ,
Engineer Yiu,, Siu; Lic. No.: S5801 PO BOX 5143      EL MONTE, CA 91734

Inspector Information

WILLIAM SIERRA, (213) 202-3122 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/18/2024 Approved ARTHUR NEGRETE
METHANE-Barrier 3/18/2024 Approved ARTHUR NEGRETE
METHANE-Subgrade 3/18/2024 Approved ARTHUR NEGRETE
Wood Frame 5/2/2024 Approved ARTHUR NEGRETE
Insulation 5/9/2024 Approved ARTHUR NEGRETE
Wood Frame 5/14/2024 Partial Approval WILLIAM KUEHN
Floor/Roof Diaphrgm/Shear Wall 5/29/2024 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 7/5/2024 Partial Approval JOSEPH MCGARRY
Insulation 2/20/2026 Corrections Issued OSVALDO PARAMO
Interior/Exterior Lathing 2/20/2026 Partial Approval OSVALDO PARAMO
ELECTRICAL-Rough 4/3/2026 Not Ready for Inspection WILLIAM SIERRA
PLUMBING-Rough 4/3/2026 Not Ready for Inspection WILLIAM SIERRA
Wood Frame 4/3/2026 Not Ready for Inspection WILLIAM SIERRA
BUILDING-Rough-Frame 4/7/2026 Not Ready for Inspection WILLIAM SIERRA
ELECTRICAL-Rough 4/7/2026 Not Ready for Inspection WILLIAM SIERRA
HVAC-Rough 4/7/2026 Not Ready for Inspection WILLIAM SIERRA
Insulation 4/7/2026 Not Ready for Inspection WILLIAM SIERRA
METHANE-Rough 4/7/2026 Approved WILLIAM SIERRA
PLUMBING-Rough 4/7/2026 Approved WILLIAM SIERRA
Rough-Elec/Plmb/HVAC 4/7/2026 Corrections Issued WILLIAM SIERRA
BUILDING-Rough-Frame 4/21/2026 Partial Inspection WILLIAM SIERRA
ELECTRICAL-Rough 4/21/2026 Partial Inspection WILLIAM SIERRA
HVAC-Rough 4/21/2026 Partial Inspection WILLIAM SIERRA
Rough-Elec/Plmb/HVAC 4/21/2026 Corrections Issued WILLIAM SIERRA
BUILDING-Rough-Frame 5/13/2026 Approved WILLIAM SIERRA
Rough-Elec/Plmb/HVAC 5/13/2026 Approved WILLIAM SIERRA
Insulation 5/20/2026 Not Ready for Inspection WILLIAM SIERRA
HVAC-Rough 6/8/2026 Approved ALEX COLIN
Insulation 6/8/2026 Approved ALEX COLIN