12414 W LANDALE ST 91604

Certificate Information: 12414 W LANDALE ST 91604

Application / Permit
23014-10000-05265
Plan Check / Job No.
B23LA24137
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN MAJOR REMODEL, (N) 24'-8" X 19'-11" , (N)5'-4" X 7'-1" FIRST FLOOR ADDITION, NEW FIRST FLOOR 25'-2" X 8'-9" PATIO COVER ADDITION, AND NEW 41'10" X 36'-6"SECOND STORY ADDITION TO (E) SINGLE FAMILY DWELLING ALL WORK PER ENGINEERING NFPA 13D REQUIRED THROUGHOUT
Permit Issued
Issued on 9/27/2024
Issuing Office
Current Status
Issued on 9/27/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/28/2023 APPLICANT
Assigned to Plan Check Engineer 1/19/2024 SEWADA ZADOORIAN MILAGARDI
Corrections Issued 1/22/2024 SEWADA ZADOORIAN MILAGARDI
Quality Review Completed 1/24/2024 STEVEN KIM
Applicant returned to address corrections 7/18/2024 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 7/30/2024 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 8/27/2024 SEWADA ZADOORAN MILAGARDI
Plan Check Approved 9/11/2024 INTERNET PERMIT
Issued 9/27/2024 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/8/2024 LEE GUILBEAUX
Sewer availability Cleared 2/8/2024 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 2/8/2024 LEE GUILBEAUX
ZI Cleared 4/2/2024 ASHLEY RODARTE
Low Impact Development (LID) Cleared 6/17/2024 LUIS LUVANO
Roof/Waste drainage to street Cleared 7/16/2024 LEE GUILBEAUX

Contact Information

Architect Tomalevski,, Bogdan Vladimirov; Lic. No.: C34688       ,
Contractor Bahman Keyvani; Lic. No.: 923783-B       ,
Contractor Keyvani Bahman; Lic. No.: 923783-B       ,
Engineer Barr,, Joseph Daniel; Lic. No.: C70708 1185 HERITAGE FARM RD      HICKORY, NC 28601
Engineer Garcia,, Ricardo Ray; Lic. No.: C66957 27702 QUINCY ST      CASTAIC, CA 91384
Geologist Miller,, Jonathan Steven; Lic. No.: EG2391 24736 CALVERT STREET      WOODLAND HILLS, CA 91367

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/31/2024 Approved CHRISTOPHE COCHRAN
Pre-Inspection 12/26/2024 Approved CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 1/10/2025 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 1/13/2025 Corrections Issued CHRISTOPHER ROJAS
Footing/Foundation/Slab 1/15/2025 Partial Approval CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 1/24/2025 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 1/24/2025 Partial Approval CHRISTOPHE COCHRAN
Footing/Foundation/Slab 1/31/2025 Partial Approval CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 2/20/2025 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 2/21/2025 Partial Approval CHRISTOPHE COCHRAN
Footing/Foundation/Slab 3/6/2025 Approved CHRISTOPHE COCHRAN
Deputy Wood Construction 6/3/2025 Conditional Approval JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 6/6/2025 Corrections Issued CHRISTOPHE COCHRAN
Wood Frame 6/6/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 8/20/2025 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 8/20/2025 Approved CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 9/17/2025 Partial Approval CHRISTOPHE COCHRAN
ELECTRICAL-Rough 9/17/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
HVAC-Rough 9/17/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
PLUMBING-Rough 9/17/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
Interior/Exterior Lathing 11/25/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
ELECTRICAL-Rough 11/26/2025 Approved CHRISTOPHE COCHRAN
HVAC-Rough 12/2/2025 Approved CHRISTOPHE COCHRAN
PLUMBING-Rough 12/2/2025 Approved CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 12/15/2025 Conditional Approval CHRISTOPHE COCHRAN
Interior/Exterior Lathing 12/15/2025 Partial Approval CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 12/22/2025 Corrections Issued CHRISTOPHE COCHRAN
Insulation 12/22/2025 No Access for Inspection CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 2/17/2026 Approved NICHOLAS TROWBRIDGE
Insulation 2/17/2026 Approved NICHOLAS TROWBRIDGE
Drywall Nailing 2/24/2026 Approved JAVIER RAMOS JR
Shower Pan 3/13/2026 Partial Approval CHRISTOPHE COCHRAN
Interior/Exterior Lathing 3/16/2026 Approved CHRISTOPHE COCHRAN
Shower Pan 3/20/2026 Approved RAUL OLAGI