6325 S 5TH AVE 90043

Certificate Information: 6325 S 5TH AVE 90043

Application / Permit
23014-10000-04902
Plan Check / Job No.
B23LA22685
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ePlan: CONVERT EXISTING DETACHED GARAGE WITH NEW IRREGULAR SHAPED 19'-2" X 20'-8" ADDITION TO NEW DETACHED ACCESSORY DWELLING UNIT (700.8 SF TOTAL ADU AREA) PER LAMC 12.22 A.33(c) AND (d).
Permit Issued
Issued on 4/12/2024
Issuing Office
Current Status
Issued on 4/12/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/6/2023 APPLICANT
Assigned to Plan Check Engineer 12/8/2023 ALEC MOUSAKHANIAN
Corrections Issued 12/10/2023 ALEC MOUSAKHANIAN
Applicant returned to address corrections 2/21/2024 HANS SANTIAGO
Plan Check Approved 3/5/2024 ANDREW SANTIAGO
Issued 4/12/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 12/18/2023 JUSTIN BICOL
Roof/Waste drainage to street Cleared 12/18/2023 JUSTIN BICOL
Eng Process Fee Ord 176,300 Cleared 1/2/2024 JUSTIN BICOL
Sewer availability Cleared 1/2/2024 JUSTIN BICOL

Contact Information

Contractor Gapzac Construction Inc; Lic. No.: 1091976-B       ,
Engineer Shahbaz,, Shant Pierre; Lic. No.: C93079 15445 VENTURA BLVD #63      SHERMAN OAKS, CA 91403

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 4/16/2024 Not Ready for Inspection JOSE MACIAS
Underground Mechanical 4/16/2024 Approved JOSE MACIAS
Excavation/Setback/Form/Re-Bar 4/22/2024 Approved MICHAEL LEWIS
Footing/Foundation/Slab 4/22/2024 Approved MICHAEL LEWIS
Deputy Wood Construction 5/2/2024 Conditional Approval DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 5/3/2024 Corrections Issued JOSE MACIAS
Interior/Exterior Lathing 5/7/2024 No Access for Inspection JOSE MACIAS
ELECTRICAL-Rough 5/20/2024 Corrections Issued JOSE MACIAS
Floor/Roof Diaphrgm/Shear Wall 5/20/2024 Approved JOSE MACIAS
Interior/Exterior Lathing 6/4/2024 Approved JOSE MACIAS
PLUMBING-Rough 6/4/2024 Corrections Issued JOSE MACIAS
PLUMBING-Rough 7/15/2024 No Access for Inspection JOSE MACIAS
PLUMBING-Rough 8/12/2024 Approved JOSE MACIAS
PLUMBING-Rough 8/20/2024 Approved JOSE MACIAS
HVAC-Rough 8/28/2024 Approved JOSE MACIAS
BUILDING-Rough-Frame 9/23/2024 Corrections Issued AMIR NAZARIAN
ELECTRICAL-Rough 9/23/2024 Corrections Issued AMIR NAZARIAN
Green Building Rough 9/23/2024 Not Ready for Inspection AMIR NAZARIAN
Insulation 9/23/2024 Corrections Issued AMIR NAZARIAN
Drywall Nailing 10/3/2024 Corrections Issued CRAIG DAVIS
Drywall Nailing 10/23/2024 Conditional Approval AMIR NAZARIAN
ELECTRICAL-Rough 10/23/2024 Conditional Approval AMIR NAZARIAN
Insulation 10/23/2024 Conditional Approval AMIR NAZARIAN
Wood Frame 10/23/2024 Conditional Approval AMIR NAZARIAN
Interior/Exterior Lathing 10/31/2024 Corrections Issued AMIR NAZARIAN
Interior/Exterior Lathing 11/4/2024 Approved ALEX COLIN
BUILDING-Rough-Frame 4/4/2025 Not Ready for Inspection WAYNE REGESTER
ELECTRICAL-Final 4/4/2025 Not Ready for Inspection WAYNE REGESTER
Final 4/4/2025 Not Ready for Inspection WAYNE REGESTER
Green Building Final 4/4/2025 Not Ready for Inspection WAYNE REGESTER
Green Building Rough 4/4/2025 Not Ready for Inspection WAYNE REGESTER
HVAC-Final 4/4/2025 Not Ready for Inspection WAYNE REGESTER
PLUMBING-Final 4/4/2025 Not Ready for Inspection WAYNE REGESTER
SGSOV-Seismic Gas S/O Valve 4/4/2025 SGSOV Not Ready WAYNE REGESTER
Smoke Detectors 4/4/2025 Partial Inspection WAYNE REGESTER
BUILDING-Rough-Frame 4/10/2025 Not Ready for Inspection WAYNE REGESTER
ELECTRICAL-Final 4/10/2025 Not Ready for Inspection WAYNE REGESTER
Final 4/10/2025 Not Ready for Inspection WAYNE REGESTER
Green Building Final 4/10/2025 Approved WAYNE REGESTER
Green Building Rough 4/10/2025 Not Ready for Inspection WAYNE REGESTER
HVAC-Final 4/10/2025 Not Ready for Inspection WAYNE REGESTER
PLUMBING-Final 4/10/2025 Not Ready for Inspection WAYNE REGESTER
SGSOV-Seismic Gas S/O Valve 4/10/2025 SGSOV Not Ready WAYNE REGESTER
Smoke Detectors 4/10/2025 Not Ready for Inspection WAYNE REGESTER
BUILDING-Rough-Frame 6/17/2025 Conditional Approval WAYNE REGESTER
ELECTRICAL-Final 6/17/2025 Corrections Issued WAYNE REGESTER
Final 6/17/2025 Corrections Issued WAYNE REGESTER
Green Building Rough 6/17/2025 Corrections Issued WAYNE REGESTER
SGSOV-Seismic Gas S/O Valve 6/17/2025 SGSOV Not Ready WAYNE REGESTER
Smoke Detectors 6/17/2025 Corrections Issued WAYNE REGESTER
SGSOV-Seismic Gas S/O Valve 1/6/2026 SGSOV Not Ready SALVADOR MARTINEZ
BUILDING-Rough-Frame 1/26/2026 No Access for Inspection SALVADOR MARTINEZ
ELECTRICAL-Final 1/26/2026 No Access for Inspection SALVADOR MARTINEZ
Final 1/26/2026 No Access for Inspection SALVADOR MARTINEZ
Green Building Rough 1/26/2026 No Access for Inspection SALVADOR MARTINEZ
HVAC-Final 1/26/2026 No Access for Inspection SALVADOR MARTINEZ
PLUMBING-Final 1/26/2026 No Access for Inspection SALVADOR MARTINEZ
SGSOV-Seismic Gas S/O Valve 1/26/2026 SGSOV Not Ready SALVADOR MARTINEZ
Smoke Detectors 1/26/2026 No Access for Inspection SALVADOR MARTINEZ