4400 N HOMER ST 90031

Certificate Information: 4400 N HOMER ST 90031

Application / Permit
23014-10000-04817
Plan Check / Job No.
B23LA22230
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED 18'-9" X 16' IRREG.-SHAPED MASTER BEDROOM, AND BATHROOM ADDITION WITH ATTACHED DECK AT REAR OF FRONT UNIT. CONVERT (E) CLOSET INTO LAUNDRY ROOM
Permit Issued
Issued on 2/27/2025
Issuing Office
Metro
Current Status
CofO Issued on 7/3/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/22/2023 APPLICANT
Assigned to Plan Check Engineer 11/27/2023 LAWRENCE QUIRANTE
Corrections Issued 11/30/2023 LAWRENCE QUIRANTE
Building Plans Picked Up 12/11/2023 APPLICANT
Applicant returned to address corrections 8/28/2024 JOSE VELAZQUEZ
Plan Check Approved 2/25/2025 CRISTINA SALAZAR
Issued 2/27/2025 APPLICANT
CofO in Progress 6/30/2025 LILIANA PORTILLO
Permit Finaled 7/3/2025 DEROLD HAUFF
CofO Issued 7/3/2025 DEROLD HAUFF
Permit Finaled 7/3/2025 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 12/8/2023 JUSTIN BICOL
Eng Process Fee Ord 176,300 Cleared 12/11/2023 JUSTIN BICOL
Grading Pre-Inspection Cleared 8/28/2024 ROBERT HUGHES
HPOZ Cleared 1/7/2025 NATHALY DE LA PAZ
"D" conditions Cleared 2/13/2025 JACQUELINE TORRES
"Q" conditions Cleared 2/13/2025 JACQUELINE TORRES
ZI Cleared 2/13/2025 JACQUELINE TORRES

Contact Information

Contractor K-Top Construction Inc; Lic. No.: 1062428-B 1056 1/2 SOUTH SERRANO AVE      LOS ANGELES, CA 90006
Engineer Rhee,, Kyle; Lic. No.: C78215 2753 WAVERLY DR 403      LOS ANGELES, CA 90039

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/21/2025 Approved LILIANA PORTILLO
Footing/Foundation/Slab 3/21/2025 Approved LILIANA PORTILLO
Sewer 3/21/2025 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Rough 4/8/2025 Partial Approval ANTHONY RAMOS
BUILDING-Rough-Frame 4/10/2025 Partial Approval LILIANA PORTILLO
ELECTRICAL-Rough 4/18/2025 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 4/18/2025 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 4/18/2025 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 4/30/2025 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 4/30/2025 Corrections Issued LILIANA PORTILLO
HVAC-Rough 4/30/2025 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 4/30/2025 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 5/12/2025 Conditional Approval LILIANA PORTILLO
ELECTRICAL-Rough 5/12/2025 Approved LILIANA PORTILLO
HVAC-Rough 5/12/2025 Approved LILIANA PORTILLO
Interior/Exterior Lathing 5/12/2025 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 5/12/2025 Approved LILIANA PORTILLO
Shower Pan 5/12/2025 Corrections Issued LILIANA PORTILLO
Insulation 5/14/2025 Approved ALIZAH MAYAGOITIA
Shower Pan 5/14/2025 Approved ALIZAH MAYAGOITIA
Drywall Nailing 5/16/2025 Approved LILIANA PORTILLO
Insulation 5/16/2025 Approved LILIANA PORTILLO
Interior/Exterior Lathing 5/16/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 6/16/2025 Conditional Approval LILIANA PORTILLO
Final 6/16/2025 Corrections Issued LILIANA PORTILLO
Green Building Final 6/16/2025 Approved LILIANA PORTILLO
Green Building Rough 6/16/2025 Approved LILIANA PORTILLO
MERV13>=Final 6/16/2025 Corrections Issued LILIANA PORTILLO
MERV13>=Rough 6/16/2025 Corrections Issued LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 6/16/2025 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 6/16/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 6/27/2025 Approved LILIANA PORTILLO
ELECTRICAL-Final 6/27/2025 Approved LILIANA PORTILLO
Final 6/27/2025 OK to Issue CofO LILIANA PORTILLO
HVAC-Final 6/27/2025 Approved LILIANA PORTILLO
MERV13>=Final 6/27/2025 Approved LILIANA PORTILLO
MERV13>=Rough 6/27/2025 Approved LILIANA PORTILLO
PLUMBING-Final 6/27/2025 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 6/27/2025 SGSOV Approved LILIANA PORTILLO