1375 N WETHERLY DR 90069

Certificate Information: 1375 N WETHERLY DR 90069

Application / Permit
23014-10000-04585
Plan Check / Job No.
B23LA21154
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED (123 S.F) ADDITION TO THE (E) SINGLE FAMILY DWELLING WITH ATTACHED CARPORT. REMOVE AND REPLACE THE (E)ROOF OVER THE NEW CONCRETE RAISED PATIO THAT CONNECTS WITH THE EXISTING CARPORT ROOF AND INTERIOR REMODEL TO ADD CLOSET AT FRONT ENTRY.
Permit Issued
Issued on 1/12/2024
Issuing Office
Current Status
CofO Issued on 5/7/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/9/2023 APPLICANT
Assigned to Plan Check Engineer 11/14/2023 DANIEL ABRAMYAN
Corrections Issued 11/15/2023 DANIEL ABRAMYAN
Plan Check Approved 11/23/2023 SARKIS HARABEDIAN
Issued 1/12/2024 APPLICANT
CofO in Progress 5/6/2025 ROY SPAULDING
CofO Issued 5/7/2025 DEROLD HAUFF
Permit Finaled 5/7/2025 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 11/16/2023 ARNULFO CHAMU
Eng Process Fee Ord 176,300 Cleared 11/17/2023 ARNULFO CHAMU
Grading Pre-Inspection Cleared 11/23/2023 DANIEL ABRAMYAN

Contact Information

Contractor Willow Group Inc The; Lic. No.: 721043-B 23974 CRAFTSMAN ROAD      CALABASAS, CA 91302
Engineer Schaefer,, Jeffrey; Lic. No.: C91734 3325 E 4TH ST      LONG BEACH, CA 90814

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/26/2024 Not Ready for Inspection ROY SPAULDING
Pre-Inspection 2/26/2024 Not Ready for Inspection ROY SPAULDING
Footing/Foundation/Slab 3/11/2024 Corrections Issued RAUL BARAJAS
Footing/Foundation/Slab 4/10/2024 Partial Approval RAUL BARAJAS
Footing/Foundation/Slab 4/23/2024 Partial Approval ROY SPAULDING
PLUMBING-Rough 5/6/2024 Corrections Issued RAUL BARAJAS
PLUMBING-Rough 5/8/2024 Corrections Issued RAUL BARAJAS
PLUMBING-Rough 5/14/2024 Approved RICHARD DOCKUS
Floor/Roof Diaphrgm/Shear Wall 5/30/2024 Approved RAUL BARAJAS
ELECTRICAL-Rough 6/10/2024 Partial Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 6/10/2024 Approved RAUL BARAJAS
BUILDING-Rough-Frame 6/11/2024 Corrections Issued RAUL BARAJAS
ELECTRICAL-Rough 6/11/2024 Approved RAUL BARAJAS
Insulation 6/17/2024 Approved RAUL BARAJAS
Interior/Exterior Lathing 6/17/2024 Approved RAUL BARAJAS
Shower Pan 6/17/2024 Approved RAUL BARAJAS
BUILDING-Rough-Frame 6/20/2024 Approved RAUL BARAJAS
Footing/Foundation/Slab 6/24/2024 Approved RAUL BARAJAS
Interior/Exterior Lathing 8/20/2024 Approved RAUL BARAJAS
Drywall Nailing 9/3/2024 Approved RAUL BARAJAS
Drywall Nailing 9/5/2024 Approved RAUL BARAJAS
Pre-Inspection 11/6/2024 Corrections Issued RAUL BARAJAS
Final 3/6/2025 Conditional Approval ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 3/6/2025 SGSOV Approved ROY SPAULDING
Smoke Detectors 3/6/2025 Approved ROY SPAULDING
Final 5/6/2025 OK to Issue CofO ROY SPAULDING