3816-3818 W EVANS ST 90027

Certificate Information: 3816-3818 W EVANS ST 90027

Application / Permit
23014-10000-03630
Plan Check / Job No.
B23LA16821
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
98 SQFT 2 STORY ADDITION TO A DUPLEX
Permit Issued
Issued on 10/16/2023
Issuing Office
Metro
Current Status
CofO Issued on 7/22/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/8/2023 APPLICANT
Assigned to Plan Check Engineer 9/14/2023 NGHI SU
Corrections Issued 9/16/2023 NGHI SU
Quality Review Completed 9/20/2023 KEN GILL
Building Plans Picked Up 9/26/2023 APPLICANT
Plan Check Approved 10/11/2023 NGHI SU
Issued 10/16/2023 APPLICANT
CofO in Progress 7/18/2024 ENRIQUE MIRELES
CofO Issued 7/22/2024 DEROLD HAUFF
Permit Finaled 7/22/2024 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/29/2023 DAVID VO
Roof/Waste drainage to street Cleared 9/29/2023 DAVID VO
Tenant Habitability Plan Cleared 10/4/2023 RICARDO BOHORQUEZ
Hydrant and Access approval Cleared 10/7/2023 KURT CORRAL
Grading Pre-Inspection Cleared 10/11/2023 NGHI SU

Contact Information

Contractor Ross Maza Construction; Lic. No.: 1095665-B 248 E MAIN ST #100      ALHAMBRA, CA 91801
Engineer Phillips,, Craig; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

ENRIQUE MIRELES, (213) 202-3438 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/25/2023 Corrections Issued JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 11/2/2023 Corrections Issued JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 11/6/2023 Conditional Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 11/9/2023 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 11/30/2023 Partial Inspection JOSEPH MCGARRY
Green Building Rough 11/30/2023 Not Ready for Inspection JOSEPH MCGARRY
BUILDING-Rough-Frame 12/6/2023 Partial Approval JOSEPH MCGARRY
ELECTRICAL-Rough 12/6/2023 Not Ready for Inspection JOSEPH MCGARRY
Green Building Rough 12/6/2023 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 12/14/2023 Approved JEFFREY MEAD
ELECTRICAL-Rough 12/14/2023 Approved JEFFREY MEAD
Insulation 12/14/2023 Approved JEFFREY MEAD
Drywall Nailing 12/19/2023 Approved BRENDAN MORELLI
Interior/Exterior Lathing 12/19/2023 Approved BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 5/31/2024 SGSOV Not Ready ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 6/18/2024 SGSOV Not Ready RICHARD DOCKUS
Final 7/17/2024 OK to Issue CofO ENRIQUE MIRELES
Footing/Foundation/Slab 7/17/2024 Approved ENRIQUE MIRELES
Green Building Final 7/17/2024 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 7/17/2024 SGSOV Approved ENRIQUE MIRELES
Smoke Detectors 7/17/2024 Approved ENRIQUE MIRELES