3647 N WILLOW CREST AVE 91604

Certificate Information: 3647 N WILLOW CREST AVE 91604

Application / Permit
23014-10000-03460
Plan Check / Job No.
B23LA16064
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED ADDITION TO THE REAR OF EXISTING SINGLE FAMILY DWELLING WITH VAULTED CEILINGS. SCOPE TO ALSO INCLDE REMODEL. ***BLDG REQUIRED TO BE FIRE SPRINKLERED PER NFPA 13D***
Permit Issued
Issued on 2/20/2024
Issuing Office
Valley
Current Status
CofO Issued on 12/1/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/28/2023 APPLICANT
Assigned to Plan Check Engineer 8/31/2023 MICHAEL LOPEZ
Corrections Issued 9/12/2023 MICHAEL LOPEZ
Quality Review Completed 9/15/2023 KEN GILL
Building Plans Picked Up 9/22/2023 APPLICANT
Applicant returned to address corrections 1/26/2024 MICHAEL LOPEZ
Plan Check Approved 2/15/2024 MICHAEL LOPEZ
Issued 2/20/2024 APPLICANT
CofO in Progress 11/27/2024 BRENDAN MORELLI
Permit Finaled 12/1/2024 DEROLD HAUFF
CofO Issued 12/1/2024 DEROLD HAUFF
Permit Finaled 12/1/2024 DEROLD HAUFF

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 9/29/2023 COLIN LOREDO
BHO/Hillside ordinance Cleared 9/29/2023 COLIN LOREDO
BHO/Hillside ordinance Cleared 9/29/2023 COLIN LOREDO
BHO/Hillside ordinance Cleared 9/29/2023 COLIN LOREDO
BHO/Hillside ordinance Cleared 9/29/2023 COLIN LOREDO
Eng Process Fee Ord 176,300 Cleared 10/2/2023 COLIN LOREDO
Sewer availability Cleared 10/11/2023 COLIN LOREDO
Specific Plan Cleared 1/4/2024 TIFFANY CORRALES
Low Impact Development (LID) Cleared 1/12/2024 ROGELIO CORTES
Roof/Waste drainage to street Cleared 1/17/2024 COLIN LOREDO
GPI Written Notices Cleared 1/26/2024 MICHAEL LOPEZ
Grading Pre-Inspection Cleared 1/26/2024 GERMAN RODRIGUEZ MENDOZA

Contact Information

Contractor Owner-Builder       ,
Engineer Ramirez, Cid, Jose Carlos; Lic. No.: C91046 5164 N RATON CIR      LONG BEACH, CA 90807

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/8/2024 Partial Approval BRIAN SULLIVAN
Piling/Pier/Caisson 5/8/2024 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 5/9/2024 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 5/10/2024 Partial Approval BRIAN SULLIVAN
Piling/Pier/Caisson 5/10/2024 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/3/2024 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 6/3/2024 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 6/6/2024 Partial Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 6/13/2024 Partial Approval BRIAN SULLIVAN
Green Building Rough 6/13/2024 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 6/13/2024 Not Ready for Inspection BRIAN SULLIVAN
Deputy Reinf. Concrete 6/18/2024 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/18/2024 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 6/18/2024 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 6/21/2024 Approved ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 6/25/2024 Partial Approval BRIAN SULLIVAN
Green Building Rough 6/25/2024 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 6/25/2024 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 7/8/2024 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 7/12/2024 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Rough 7/12/2024 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 7/12/2024 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Rough 7/12/2024 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 7/12/2024 Conditional Approval BRIAN SULLIVAN
ELECTRICAL-Rough 7/15/2024 Approved BRIAN SULLIVAN
HVAC-Rough 7/15/2024 Conditional Approval BRIAN SULLIVAN
PLUMBING-Rough 7/15/2024 Approved BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 7/17/2024 Approved ROY SPAULDING
Shower Pan 7/17/2024 Approved ROY SPAULDING
BUILDING-Rough-Frame 7/19/2024 Approved ROY SPAULDING
Green Building Rough 7/19/2024 Approved ROY SPAULDING
Interior/Exterior Lathing 7/19/2024 Not Ready for Inspection ROY SPAULDING
Verify Sprinkler Sign Off 7/19/2024 Approved ROY SPAULDING
Interior/Exterior Lathing 7/22/2024 Approved ROY SPAULDING
Insulation 7/26/2024 Approved ROY SPAULDING
Drywall Nailing 8/2/2024 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 10/18/2024 SGSOV Not Ready BRIAN SULLIVAN
ELECTRICAL-Rough 10/21/2024 Approved BRIAN SULLIVAN
Final 10/21/2024 Corrections Issued BRIAN SULLIVAN
HVAC-Rough 10/21/2024 Approved BRIAN SULLIVAN
PLUMBING-Rough 10/21/2024 Approved BRIAN SULLIVAN
ELECTRICAL-Final 11/20/2024 Approved BRIAN SULLIVAN
Final 11/20/2024 Not Ready for Inspection BRIAN SULLIVAN
Green Building Final 11/20/2024 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Final 11/20/2024 Approved BRIAN SULLIVAN
PLUMBING-Final 11/20/2024 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 11/20/2024 SGSOV Approved BRIAN SULLIVAN
Service/Power Release 11/20/2024 Approved BRIAN SULLIVAN
Smoke Detectors 11/20/2024 Approved BRIAN SULLIVAN
Final 11/27/2024 OK to Issue CofO BRENDAN MORELLI
Green Building Final 11/27/2024 Approved BRENDAN MORELLI