4123 1/2 N GRIFFIN AVE 90031

Certificate Information: 4123 1/2 N GRIFFIN AVE 90031

Application / Permit
23014-10000-02954
Plan Check / Job No.
B23LA13680
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Convert existing detached garage to accessory dwelling. All work per WFPP. See Comments
Permit Issued
Issued on 11/9/2023
Issuing Office
Current Status
CofO Issued on 5/15/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/25/2023 APPLICANT
Assigned to Plan Check Engineer 8/2/2023 MIROOSH KHACHATOORIAN
Corrections Issued 8/3/2023 MIROOSH KHACHATOORIAN
Applicant returned to address corrections 10/27/2023 PINANK PATEL
Applicant returned to address corrections 10/31/2023 MOHAMMAD ESMAILI
Applicant returned to address corrections 11/3/2023 MOHAMMAD ESMAILI
Applicant returned to address corrections 11/7/2023 MOHAMMAD ESMAILI
Plan Check Approved 11/8/2023 VICTOR CHEN
Issued 11/9/2023 APPLICANT
CofO in Progress 5/9/2024 OSVALDO PARAMO
CofO Issued 5/15/2024 DEROLD HAUFF
Permit Finaled 5/15/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 8/4/2023 DAVID VO
Highway dedication Cleared 8/4/2023 DAVID VO
Roof/Waste drainage to street Cleared 8/4/2023 DAVID VO
Public Works-Highway Ded. Cleared 8/4/2023 DAVID VO
Tenant Habitability Plan Cleared 8/8/2023 RICARDO BOHORQUEZ
Eng Process Fee Ord 176,300 Cleared 8/9/2023 CHRISTINA BRACO
Sewer availability Cleared 8/9/2023 CHRISTINA BRACO
HPOZ Cleared 8/15/2023 MICAELA TORRES-GIL
"Q" conditions Cleared 8/21/2023 YINGSHI HUANG
Hydrant and Access approval Cleared 9/16/2023 JOHN CONNEALLY
ZI Cleared 10/3/2023 YINGSHI HUANG
ZI Cleared 10/3/2023 YINGSHI HUANG
Grading Pre-Inspection Cleared 10/27/2023 MIROOSH KHACHATOORIAN

Contact Information

Contractor So Cal Construction Enterprises Inc; Lic. No.: 832488-B P O BOX 96      SAN GABRIEL, CA 91778

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 12/28/2023 Approved AMY COLIN
Footing/Foundation/Slab 12/28/2023 Partial Approval AMY COLIN
PLUMBING-Rough 12/28/2023 Partial Approval AMY COLIN
Pre-Inspection 12/28/2023 Approved AMY COLIN
Footing/Foundation/Slab 1/3/2024 Approved AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 1/9/2024 Partial Approval AMY COLIN
Verify Rec and Parks Fee Memo 1/9/2024 Not Ready for Inspection AMY COLIN
Interior/Exterior Lathing 1/16/2024 Partial Approval AMY COLIN
PLUMBING-Rough 1/16/2024 Approved AMY COLIN
ELECTRICAL-Rough 1/22/2024 Corrections Issued HAMIK HARTOUNIAN
HVAC-Rough 1/22/2024 Not Ready for Inspection HAMIK HARTOUNIAN
Wood Frame 1/22/2024 Not Ready for Inspection HAMIK HARTOUNIAN
BUILDING-Rough-Frame 1/25/2024 Approved AMY COLIN
ELECTRICAL-Rough 1/25/2024 Approved AMY COLIN
Green Building Rough 1/25/2024 Approved AMY COLIN
HVAC-Rough 1/25/2024 Approved AMY COLIN
MERV13>=Rough 1/25/2024 Approved AMY COLIN
Insulation 1/29/2024 Approved AMIR NAZARIAN
Interior/Exterior Lathing 1/29/2024 Partial Approval AMIR NAZARIAN
Pre-Inspection 1/29/2024 Approved AMIR NAZARIAN
Drywall Nailing 1/31/2024 Approved ARTHUR NEGRETE
Final 5/6/2024 OK to Issue CofO OSVALDO PARAMO
Green Building Final 5/6/2024 Approved OSVALDO PARAMO
MERV13>=Final 5/6/2024 Approved OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 5/6/2024 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 5/6/2024 Approved OSVALDO PARAMO