1410 N MILLER DR 90069

Certificate Information: 1410 N MILLER DR 90069

Application / Permit
23014-10000-02777
Plan Check / Job No.
B23LA12906
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
alteration to (E) SFD, ATT. garage and ALQ, propse convert the ALQ to be first floor of SFD and an addition to the second floor SFD
Permit Issued
Issued on 2/7/2024
Issuing Office
Metro
Current Status
Issued on 2/7/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/13/2023 APPLICANT
Assigned to Plan Check Engineer 7/27/2023 KESETE HAREGOT
Corrections Issued 8/10/2023 GEORGE JOLAKIAN
Quality Review Completed 8/17/2023 RODOLFO ARIAS
Building Plans Picked Up 8/21/2023 APPLICANT
Plan Check Approved 1/25/2024 GEORGE JOLAKIAN
Issued 2/7/2024 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 8/24/2023 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 8/25/2023 JEANIE LAM
ZA Case Cleared 9/14/2023 SPENCER WEJROWSKI
ZA Case Cleared 9/14/2023 SPENCER WEJROWSKI
ZA Case Cleared 9/14/2023 SPENCER WEJROWSKI
Hydrant and Access approval Cleared 10/22/2023 JOHN CONNEALLY
Low Impact Development (LID) Cleared 12/26/2023 SHAHIN KHAZEY
Roof/Waste drainage to street Cleared 1/5/2024 JEANIE LAM
Grading Pre-Inspection Cleared 1/25/2024 GEORGE JOLAKIAN

Contact Information

Architect Youssefzadeh,, Atabak; Lic. No.: C22727 1401 WESTWOOD BLVD #320      LOS ANGELES, CA 90024
Contractor X3build Inc; Lic. No.: 1065494-B 3163 DONALD DOUGLAS LOOP   SOUTH    SANTA MONICA, CA 90405
Engineer Mangoli,, Arash; Lic. No.: C84319 1727 BENTLEY AVE APT 211      LOS ANGELES, CA 90025

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/8/2024 Partial Inspection BRIAN SULLIVAN
Footing/Foundation/Slab 5/8/2024 Partial Inspection BRIAN SULLIVAN
Pre-Inspection 5/8/2024 Partial Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/24/2024 Not Ready for Inspection RAUL BARAJAS
Footing/Foundation/Slab 6/24/2024 Corrections Issued RAUL BARAJAS
PLUMBING-Rough 6/24/2024 Partial Inspection RAUL BARAJAS
Underground Mechanical 6/24/2024 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 7/19/2024 Approved RAUL BARAJAS
Footing/Foundation/Slab 7/19/2024 Approved RAUL BARAJAS
PLUMBING-Rough 7/19/2024 Partial Inspection RAUL BARAJAS
Rough-Elec/Plmb/HVAC 7/19/2024 Not Ready for Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 9/6/2024 Corrections Issued RAUL BARAJAS
Structural Steel Frame 9/6/2024 Not Ready for Inspection RAUL BARAJAS
Wood Frame 9/6/2024 Corrections Issued RAUL BARAJAS
ELECTRICAL-Rough 11/22/2024 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Rough 11/22/2024 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 11/22/2024 Corrections Issued BRIAN SULLIVAN
Wood Frame 11/22/2024 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Rough 12/16/2024 Partial Approval ROY SPAULDING
HVAC-Rough 12/16/2024 Partial Approval ROY SPAULDING
PLUMBING-Rough 12/16/2024 Approved ROY SPAULDING
Structural Steel Frame 12/16/2024 Approved ROY SPAULDING
Wood Frame 12/16/2024 Not Ready for Inspection ROY SPAULDING
ELECTRICAL-Rough 12/18/2024 Partial Approval ROY SPAULDING
Special/Order Compliance 8/15/2025 Partial Inspection ROY SPAULDING
ELECTRICAL-Rough 2/23/2026 Approved ROY SPAULDING
HVAC-Rough 2/23/2026 Approved ROY SPAULDING
Wood Frame 2/23/2026 Not Ready for Inspection ROY SPAULDING
BUILDING-Rough-Frame 2/26/2026 Corrections Issued ROY SPAULDING
Green Building Rough 2/26/2026 Approved ROY SPAULDING
Verify Sprinkler Sign Off 2/26/2026 Approved ROY SPAULDING
BUILDING-Rough-Frame 3/19/2026 Approved ROY SPAULDING
Interior/Exterior Lathing 4/9/2026 Partial Approval ROY SPAULDING
Wood Frame 4/21/2026 Corrections Issued ROY SPAULDING
Insulation 5/4/2026 Approved ROY SPAULDING
Shower Pan 5/4/2026 Approved ROY SPAULDING
Drywall Nailing 5/27/2026 Approved ROY SPAULDING