4444 3/4 N COLLIS AVE 90032

Certificate Information: 4444 3/4 N COLLIS AVE 90032

Application / Permit
23014-10000-02528
Plan Check / Job No.
B23LA11717
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
eplan Proposed new ADU addition (26'0" x 18'1", 470 sqft) above detached garage PER LAMC12.22A 33.
Permit Issued
Issued on 11/20/2023
Issuing Office
Current Status
CofO Issued on 9/19/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/24/2023 APPLICANT
Assigned to Plan Check Engineer 7/13/2023 NGHI SU
Corrections Issued 7/18/2023 NGHI SU
Quality Review Completed 8/3/2023 FARUK SEZER
Applicant returned to address corrections 9/27/2023 NGHI SU
Plan Check Approved 11/20/2023 NGHI SU
Issued 11/20/2023 APPLICANT
CofO in Progress 9/17/2024 ALIZAH MAYAGOITIA
CofO Issued 9/19/2024 DEROLD HAUFF
Permit Finaled 9/19/2024 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 8/15/2023 CHRISTINA BRACO
Address approval Cleared 8/25/2023 CHRISTINA BRACO
BHO/Hillside ordinance Cleared 8/25/2023 CHRISTINA BRACO
Highway dedication Cleared 8/25/2023 CHRISTINA BRACO
Roof/Waste drainage to street Cleared 8/25/2023 CHRISTINA BRACO
Miscellaneous Cleared 8/30/2023 SPENCER WEJROWSKI
Grading Pre-Inspection Cleared 8/31/2023 ROBERT HUGHES
Sewer availability Cleared 8/31/2023 CHRISTINA BRACO
Hydrant and Access approval Cleared 9/8/2023 LAVEON RIDER
"D" conditions Cleared 9/15/2023 MAXFIELD VERMY
"Q" conditions Cleared 9/15/2023 MAXFIELD VERMY
ZI Cleared 9/15/2023 MAXFIELD VERMY
GPI Written Notices Cleared 9/27/2023 NGHI SU

Contact Information

Contractor Owner-Builder       ,
Engineer Almalla,, Dean; Lic. No.: C58024 15053 VENTURA BLVD STE 205      SHERMAN OAKS, CA 91403

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 1/25/2024 Not Ready for Inspection AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 1/25/2024 Corrections Issued AMY COLIN
Green Building Rough 1/25/2024 Not Ready for Inspection AMY COLIN
Verify Sprinkler Sign Off 1/25/2024 Not Ready for Inspection AMY COLIN
Deputy Wood Construction 1/30/2024 Conditional Approval ALIZAH MAYAGOITIA
Deputy Wood Construction 1/31/2024 Conditional Approval BRENDAN MORELLI
ELECTRICAL-Rough 3/5/2024 Conditional Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 3/5/2024 Conditional Approval LILIANA PORTILLO
Footing/Foundation/Slab 3/5/2024 Approved LILIANA PORTILLO
HVAC-Rough 3/5/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 3/5/2024 Approved LILIANA PORTILLO
Verify Sprinkler Sign Off 3/5/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 3/20/2024 Corrections Issued LILIANA PORTILLO
HVAC-Rough 3/20/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 4/2/2024 Approved JOSEPH MCGARRY
Green Building Rough 4/2/2024 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 4/2/2024 Partial Approval JOSEPH MCGARRY
Insulation 5/9/2024 Corrections Issued LILIANA PORTILLO
Drywall Nailing 5/31/2024 Approved LILIANA PORTILLO
Insulation 5/31/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 7/10/2024 Approved LILIANA PORTILLO
Shower Pan 7/10/2024 Approved LILIANA PORTILLO
Final 9/13/2024 Partial Approval ALIZAH MAYAGOITIA
Green Building Final 9/13/2024 Approved ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 9/13/2024 SGSOV Approved ALIZAH MAYAGOITIA
Smoke Detectors 9/13/2024 Approved ALIZAH MAYAGOITIA
Final 9/17/2024 OK to Issue CofO ALIZAH MAYAGOITIA