7917 S GLIDER AVE 90045

Certificate Information: 7917 S GLIDER AVE 90045

Application / Permit
23014-10000-01133
Plan Check / Job No.
B23LA05314
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior remodel to existing 1-story single family dwelling as well as re-roof entire structure with Class A roof covering material over existing solid sheathing. All work per engineer. No additional square footage and overall height.
Permit Issued
Issued on 6/13/2023
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 9/22/2023

Permit Application Status History

Submitted 3/23/2023 APPLICANT
Assigned to Plan Check Engineer 3/30/2023 MICHAEL LANZONE
Corrections Issued 3/31/2023 MICHAEL LANZONE
Building Plans Picked Up 4/3/2023 APPLICANT
Applicant returned to address corrections 6/1/2023 MICHAEL LANZONE
Plan Check Approved 6/8/2023 VICTOR CHEN
Issued 6/13/2023 APPLICANT
Permit Finaled-Status Void 9/21/2023 BOBBY KEY
Permit Finaled 9/21/2023 BOBBY KEY
Re-Activate Permit 9/22/2023 BOBBY KEY

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Meza Construction; Lic. No.: 904293-B 955 HOLLY STREET      INGLEWOOD, CA 90301
Engineer Christiansen,, Scott; Lic. No.: C37989 1003 WILSHIRE BLVD 202      SANTA MONICA, CA 90401

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 6/16/2023 Conditional Approval BOBBY KEY
BUILDING-Rough-Frame 6/30/2023 Corrections Issued BOBBY KEY
Rough-Elec/Plmb/HVAC 6/30/2023 Not Ready for Inspection BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 7/11/2023 Corrections Issued BOBBY KEY
Footing/Foundation/Slab 7/11/2023 Approved BOBBY KEY
Rough-Elec/Plmb/HVAC 7/11/2023 Partial Approval BOBBY KEY
Deputy Wood Construction 7/13/2023 Approved HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 7/17/2023 Approved BOBBY KEY
Rough-Elec/Plmb/HVAC 7/17/2023 Corrections Issued BOBBY KEY
BUILDING-Rough-Frame 7/21/2023 Approved BOBBY KEY
Green Building Rough 7/21/2023 Approved BOBBY KEY
HVAC-Rough 7/21/2023 Corrections Issued BOBBY KEY
Interior/Exterior Lathing 7/21/2023 Partial Approval BOBBY KEY
HVAC-Rough 7/25/2023 Approved BOBBY KEY
Insulation 7/25/2023 Corrections Issued BOBBY KEY
Insulation 7/28/2023 Approved BOBBY KEY
Drywall Nailing 8/2/2023 Approved BOBBY KEY
Interior/Exterior Lathing 8/2/2023 Approved BOBBY KEY
Final 9/19/2023 Corrections Issued BOBBY KEY
SGSOV-Seismic Gas S/O Valve 9/19/2023 SGSOV Not Ready BOBBY KEY
Smoke Detectors 9/19/2023 Approved BOBBY KEY
Final 9/21/2023 Permit Finaled BOBBY KEY
SGSOV-Seismic Gas S/O Valve 9/21/2023 SGSOV Approved BOBBY KEY
Service/Power Release 9/21/2023 Approved BOBBY KEY