13109 W ROSE AVE 90066

Certificate Information: 13109 W ROSE AVE 90066

Application / Permit
23014-10000-00985
Plan Check / Job No.
B23LA04575
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
715 SQFT ADU ADDITION ON EXISTING DETACHED GARAGE PER LAMC 12.22 A.33 (c)-(d) AND 228 SQFT ROOFTOP DECK ABOVE EXISTING GARAGE.
Permit Issued
Issued on 3/26/2024
Issuing Office
Metro
Current Status
CofO Issued on 3/25/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/14/2023 APPLICANT
Assigned to Plan Check Engineer 3/20/2023 ADAM HEGAZI
Corrections Issued 3/23/2023 ADAM HEGAZI
Building Plans Picked Up 4/4/2023 APPLICANT
Plan Check Approved 3/26/2024 SAMUEL GONZALEZ
Issued 3/26/2024 APPLICANT
CofO in Progress 1/31/2025 JESUS RODRIGUEZ
CofO in Progress 2/5/2025 JESUS RODRIGUEZ
CofO in Progress 3/14/2025 MICHAEL ALLEN
CofO Issued 3/25/2025 RICHARD STEINBACH
Permit Finaled 3/25/2025 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 6/20/2023 JASON NG
Specific Plan Cleared 6/27/2023 FREDDY GARCIA
Eng Process Fee Ord 176,300 Cleared 7/9/2023 AHMED AMARRAGY
Sewer availability Cleared 7/9/2023 AHMED AMARRAGY
Low Impact Development (LID) Cleared 1/5/2024 SAMUEL LINN
Roof/Waste drainage to street Cleared 1/5/2024 DARIN LAM

Contact Information

Contractor Rolenconstruction Llc; Lic. No.: 1105889-B 5250 LANKERSHIM BLVD 500      NORTH HOLLYWOOD, CA 91601
Engineer Standley,, Craig Erick; Lic. No.: C87675 60 VIA CARATAMA      SAN CLEMENTE, CA 92673

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 4/17/2024 Partial Approval JESUS RODRIGUEZ
Sewer 4/17/2024 Approved JESUS RODRIGUEZ
Deputy Drilled-In Anchors 4/22/2024 Conditional Approval JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/23/2024 Corrections Issued JESUS RODRIGUEZ
Deputy Drilled-In Anchors 5/21/2024 Conditional Approval JESUS RODRIGUEZ
Footing/Foundation/Slab 5/21/2024 Approved JESUS RODRIGUEZ
PLUMBING-Rough 6/10/2024 Not Ready for Inspection JESUS RODRIGUEZ
PLUMBING-Rough 6/13/2024 Approved JESUS RODRIGUEZ
Underground Mechanical 6/13/2024 Approved JESUS RODRIGUEZ
ELECTRICAL-Rough 6/20/2024 Approved JESUS RODRIGUEZ
HVAC-Rough 6/20/2024 Not Ready for Inspection JESUS RODRIGUEZ
ELECTRICAL-Rough 6/28/2024 Approved HERBERT GIRON
HVAC-Rough 6/28/2024 Corrections Issued HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 7/9/2024 Approved JESUS RODRIGUEZ
HVAC-Rough 7/9/2024 Approved JESUS RODRIGUEZ
BUILDING-Rough-Frame 7/24/2024 Approved JESUS RODRIGUEZ
Green Building Rough 7/24/2024 Approved JESUS RODRIGUEZ
Insulation 7/24/2024 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 7/24/2024 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 8/7/2024 Partial Approval JESUS PINEDA
Shower Pan 8/7/2024 Approved JESUS PINEDA
Interior/Exterior Lathing 8/8/2024 Approved DANIEL VERA
Drywall Nailing 8/13/2024 Approved HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 8/19/2024 Approved JESUS RODRIGUEZ
Final 9/20/2024 Corrections Issued JESUS PINEDA
Green Building Final 9/20/2024 Corrections Issued JESUS PINEDA
SGSOV-Seismic Gas S/O Valve 9/20/2024 SGSOV Not Ready JESUS PINEDA
Smoke Detectors 9/20/2024 Corrections Issued JESUS PINEDA
Final 10/4/2024 Not Ready for Inspection JESUS PINEDA
Green Building Final 10/4/2024 Not Ready for Inspection JESUS PINEDA
SGSOV-Seismic Gas S/O Valve 10/4/2024 SGSOV Not Ready JESUS PINEDA
Smoke Detectors 10/4/2024 Not Ready for Inspection JESUS PINEDA
ELECTRICAL-Final 10/17/2024 Corrections Issued JESUS PINEDA
PLUMBING-Final 10/17/2024 Corrections Issued JESUS PINEDA
SGSOV-Seismic Gas S/O Valve 10/25/2024 SGSOV Not Ready JESUS PINEDA
ELECTRICAL-Final 10/28/2024 Approved JESUS PINEDA
Green Building Final 10/28/2024 Approved JESUS PINEDA
HVAC-Final 10/28/2024 Approved JESUS PINEDA
PLUMBING-Final 10/28/2024 Approved JESUS PINEDA
Service/Power Release 10/28/2024 Not Ready for Inspection JESUS PINEDA
Smoke Detectors 10/28/2024 Approved JESUS PINEDA
Service/Power Release 11/12/2024 Approved ARAM AVEDISIAN
Final 11/21/2024 Not Ready for Inspection JESUS PINEDA
SGSOV-Seismic Gas S/O Valve 11/21/2024 SGSOV Not Required JESUS PINEDA
Final 1/30/2025 Corrections Issued JESUS RODRIGUEZ
Final 3/13/2025 OK to Issue CofO MICHAEL ALLEN