503 N FORMOSA AVE 90036

Certificate Information: 503 N FORMOSA AVE 90036

Application / Permit
23014-10000-00630
Plan Check / Job No.
B23LA02720
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL OF (E) SINGLE FAMILY DWELLINGTO REMODEL BATHROOMS, LAUNDRY, AND KITCHEN. REMOVE LOAD BEARING WALLS FROM EXISTING DINING ROOM TO CREATE OPEN LIVING SPACE. WORK DONE PER ENGINEERING.
Permit Issued
Issued on 7/28/2023
Issuing Office
Current Status
Permit Finaled on 5/29/2024

Permit Application Status History

Submitted 2/16/2023 APPLICANT
Assigned to Plan Check Engineer 2/24/2023 PINANK PATEL
Corrections Issued 2/25/2023 PINANK PATEL
Applicant returned to address corrections 6/26/2023 PINANK PATEL
Applicant returned to address corrections 7/18/2023 ALFRED RAMIREZ
Plan Check Approved 7/20/2023 MADISON ODELL
Issued 7/28/2023 APPLICANT
Permit Finaled 5/28/2024 AMIR NAZARIAN

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/9/2023 CINDY QI
Sewer availability Cleared 3/9/2023 CINDY QI

Contact Information

Contractor Owner-Builder       ,
Engineer Shahbaz,, Shant Pierre; Lic. No.: C93079 15445 VENTURA BLVD #63      SHERMAN OAKS, CA 91403

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/15/2023 Approved LILIANA PORTILLO
Deputy Drilled-In Anchors 8/17/2023 Approved LILIANA PORTILLO
ELECTRICAL-Rough 9/22/2023 Corrections Issued LILIANA PORTILLO
HVAC-Rough 9/22/2023 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 9/22/2023 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 10/11/2023 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 10/11/2023 Approved LILIANA PORTILLO
HVAC-Rough 10/11/2023 Approved LILIANA PORTILLO
PLUMBING-Rough 10/11/2023 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 10/30/2023 Approved JOSEPH MCGARRY
Insulation 10/30/2023 Approved JOSEPH MCGARRY
Drywall Nailing 11/6/2023 Approved LILIANA PORTILLO
Shower Pan 11/6/2023 Approved LILIANA PORTILLO
Interior/Exterior Lathing 11/14/2023 Approved LILIANA PORTILLO
Final 5/22/2024 Corrections Issued AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 5/22/2024 SGSOV Approved AMIR NAZARIAN
Smoke Detectors 5/22/2024 Approved AMIR NAZARIAN
Final 5/28/2024 Permit Finaled AMIR NAZARIAN