2750 S WESTWOOD BLVD 90064

Certificate Information: 2750 S WESTWOOD BLVD 90064

Application / Permit
23014-10000-00555
Plan Check / Job No.
B23LA02292
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
eplan: 957.51 SQ.FT. ADDITION TO (E) SINGLE FAMILY DWELLING. SFD TO BE FULLY SPRINKLERED PER NFPA 13D
Permit Issued
Issued on 10/10/2023
Issuing Office
Current Status
CofO Issued on 7/7/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/12/2023 APPLICANT
Assigned to Plan Check Engineer 3/1/2023 HANS SANTIAGO
Corrections Issued 3/1/2023 HANS SANTIAGO
Quality Review Completed 3/11/2023 GARO TELMI
Applicant returned to address corrections 5/23/2023 HANS SANTIAGO
Applicant returned to address corrections 9/20/2023 HANS SANTIAGO
Plan Check Approved 10/2/2023 ANDREW SANTIAGO
Issued 10/10/2023 APPLICANT
CofO in Progress 6/27/2025 EVAN COOPER
Permit Finaled 7/7/2025 RICHARD STEINBACH
CofO Issued 7/7/2025 RICHARD STEINBACH
Permit Finaled 7/7/2025 RICHARD STEINBACH

Permit Application Clearance Information

Sewer availability Cleared 4/14/2023 DINAH GARIN
Grading Pre-Inspection Cleared 7/19/2023 JONATHAN HOM
Specific Plan Cleared 7/20/2023 NELSON RODRIGUEZ
Eng Process Fee Ord 176,300 Cleared 7/24/2023 DINAH GARIN
Low Impact Development (LID) Cleared 8/3/2023 SAMUEL LINN
Flood clearance Cleared 8/10/2023 ABDULRAHMAN ALABTAH
Hydrant and Access approval Cleared 9/8/2023 GILBERT URREA
Roof/Waste drainage to street Cleared 9/10/2023 AHMED AMARRAGY
GPI Written Notices Cleared 10/2/2023 ANDREW SANTIAGO

Contact Information

Contractor Owner-Builder       ,
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/6/2023 Corrections Issued OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 11/7/2023 Conditional Approval MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 11/8/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Verify Sprinkler Sign Off 11/8/2023 Corrections Issued OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 11/14/2023 Approved JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 11/17/2023 Partial Approval BEN MOLSTAD
Insulation 11/21/2023 Not Ready for Inspection BEN MOLSTAD
Pre-Inspection 11/21/2023 Not Ready for Inspection BEN MOLSTAD
Underground Mechanical 11/21/2023 Partial Approval BEN MOLSTAD
Floor/Roof Diaphrgm/Shear Wall 11/27/2023 Corrections Issued BEN MOLSTAD
Insulation 11/27/2023 Not Ready for Inspection BEN MOLSTAD
Deputy Wood Construction 11/28/2023 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 12/1/2023 Corrections Issued JESUS PINEDA
Wood Frame 12/5/2023 Not Ready for Inspection JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 12/27/2023 Corrections Issued JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 12/28/2023 Conditional Approval ARAM AVEDISIAN
FLOOD-Elevation Certificate 1/2/2024 Corrections Issued JESUS PINEDA
ELECTRICAL-Rough 1/5/2024 Conditional Approval JESUS PINEDA
BUILDING-Rough-Frame 1/10/2024 Corrections Issued JESUS PINEDA
FLOOD-Proofing Certificate 1/10/2024 Not Ready for Inspection JESUS PINEDA
Gas Test 1/10/2024 Partial Approval JESUS PINEDA
HVAC-Rough 1/10/2024 Corrections Issued JESUS PINEDA
MERV13>=Rough 1/10/2024 Approved JESUS PINEDA
PLUMBING-Rough 1/10/2024 Approved JESUS PINEDA
Sewer 1/10/2024 Not Ready for Inspection JESUS PINEDA
Pre-Inspection 5/6/2024 Partial Inspection JESUS PINEDA
Special/Order Compliance 5/6/2024 Partial Inspection MICHAEL PELHAM
BUILDING-Rough-Frame 9/24/2024 Corrections Issued KIRK SANDERS
ELECTRICAL-Rough 9/24/2024 Corrections Issued KIRK SANDERS
FLOOD-Proofing Certificate 9/24/2024 Approved KIRK SANDERS
HVAC-Rough 9/24/2024 Approved KIRK SANDERS
PLUMBING-Rough 9/24/2024 Approved KIRK SANDERS
Verify Sprinkler Sign Off 9/24/2024 Approved KIRK SANDERS
BUILDING-Rough-Frame 10/2/2024 Not Ready for Inspection ARAM AVEDISIAN
BUILDING-Rough-Frame 10/8/2024 Conditional Approval DANIEL VERA
ELECTRICAL-Rough 10/8/2024 Partial Approval DANIEL VERA
Insulation 10/8/2024 Corrections Issued DANIEL VERA
Enclosure/Fence 10/24/2024 Not Ready for Inspection DANIEL VERA
Interior/Exterior Lathing 10/24/2024 Not Ready for Inspection DANIEL VERA
Underground Mechanical 10/24/2024 Approved DANIEL VERA
ELECTRICAL-Rough 11/5/2024 Approved DANIEL VERA
Insulation 11/5/2024 Approved DANIEL VERA
Interior/Exterior Lathing 11/5/2024 Approved DANIEL VERA
BUILDING-Rough-Frame 11/25/2024 Approved BOBBY KEY
Drywall Nailing 11/25/2024 Approved BOBBY KEY
Pre-Inspection 12/10/2024 Approved DANIEL VERA
Pre-Inspection 1/10/2025 Not Ready for Inspection JESUS RODRIGUEZ
ELECTRICAL-Final 5/16/2025 Corrections Issued TEMISTOCLES CAAL
Service/Power Release 5/16/2025 Approved TEMISTOCLES CAAL
Gas Test 5/27/2025 Not Ready for Inspection KIRK SANDERS
PLUMBING-Final 5/27/2025 Corrections Issued KIRK SANDERS
Gas Test 5/30/2025 Corrections Issued EVAN COOPER
PLUMBING-Rough 5/30/2025 Approved EVAN COOPER
ELECTRICAL-Final 6/4/2025 Approved STEPHANIE SWANSON
Gas Test 6/4/2025 Corrections Issued EVAN COOPER
PLUMBING-Final 6/4/2025 Approved EVAN COOPER
Gas Test 6/9/2025 Approved CARLOS MATAMOROS
FLOOD-Elevation Certificate 6/27/2025 Approved EVAN COOPER
Final 6/27/2025 OK to Issue CofO EVAN COOPER
Footing/Foundation/Slab 6/27/2025 Approved EVAN COOPER
HVAC-Final 6/27/2025 Approved EVAN COOPER
MERV13>=Final 6/27/2025 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 6/27/2025 SGSOV Approved EVAN COOPER
Smoke Detectors 6/27/2025 Approved EVAN COOPER