5409 E MARTIN ST 90032

Certificate Information: 5409 E MARTIN ST 90032

Application / Permit
23014-10000-00517
Plan Check / Job No.
B23LA02118
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED BEDROOM ADDITION AT REAR OF (E) SFD. INCLUDES REMODEL OF ADJOINING AREAS.
Permit Issued
Issued on 2/21/2024
Issuing Office
Metro
Current Status
CofO Issued on 12/6/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/8/2023 APPLICANT
Assigned to Plan Check Engineer 2/16/2023 LAWRENCE QUIRANTE
Corrections Issued 2/18/2023 LAWRENCE QUIRANTE
Building Plans Picked Up 3/9/2023 APPLICANT
Plan Check Approved 2/7/2024 ADAM HEGAZI
Issued 2/21/2024 APPLICANT
CofO in Progress 12/4/2025 LILIANA PORTILLO
Permit Finaled 12/6/2025 DEROLD HAUFF
CofO Issued 12/6/2025 DEROLD HAUFF
Permit Finaled 12/6/2025 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 8/25/2023 ROBERT HUGHES
Roof/Waste drainage to street Cleared 8/28/2023 AMBER CAMPBELL
Sewer availability Cleared 8/28/2023 AMBER CAMPBELL
Eng Process Fee Ord 176,300 Cleared 8/31/2023 AMBER CAMPBELL
Construction near power lines Cleared 12/29/2023 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Soto,, Miguel Angel; Lic. No.: C87493 653 W 5TH ST      SAN PEDRO, CA 90731

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/19/2024 Corrections Issued LILIANA PORTILLO
Deputy Drilled-In Anchors 8/21/2024 Conditional Approval LILIANA PORTILLO
Footing/Foundation/Slab 8/23/2024 Approved ALIZAH MAYAGOITIA
Wood Frame 10/11/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 10/16/2024 Partial Approval LILIANA PORTILLO
Insulation 10/16/2024 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 10/30/2024 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 4/3/2025 Approved LILIANA PORTILLO
Wood Frame 4/7/2025 No Access for Inspection WILLIAM SIERRA
Pre-Inspection 4/16/2025 Partial Inspection LILIANA PORTILLO
HVAC-Rough 4/24/2025 Not Ready for Inspection LILIANA PORTILLO
Pre-Inspection 4/24/2025 Partial Inspection LILIANA PORTILLO
BUILDING-Rough-Frame 5/20/2025 Conditional Approval LILIANA PORTILLO
ELECTRICAL-Rough 5/20/2025 Approved LILIANA PORTILLO
HVAC-Rough 5/20/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 6/11/2025 Approved LILIANA PORTILLO
Green Building Rough 6/11/2025 Approved LILIANA PORTILLO
Insulation 6/11/2025 Approved LILIANA PORTILLO
Interior/Exterior Lathing 6/11/2025 Approved LILIANA PORTILLO
Drywall Nailing 7/1/2025 Approved REGINA MENDEZ
ELECTRICAL-Final 11/12/2025 Not Ready for Inspection LILIANA PORTILLO
Final 11/12/2025 Corrections Issued LILIANA PORTILLO
Green Building Final 11/12/2025 Not Ready for Inspection LILIANA PORTILLO
HVAC-Final 11/12/2025 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 11/12/2025 SGSOV Approved LILIANA PORTILLO
Smoke Detectors 11/12/2025 Approved LILIANA PORTILLO
ELECTRICAL-Final 12/3/2025 Approved LILIANA PORTILLO
Final 12/3/2025 OK to Issue CofO LILIANA PORTILLO
Green Building Final 12/3/2025 Approved LILIANA PORTILLO
HVAC-Final 12/3/2025 Approved LILIANA PORTILLO
PLUMBING-Final 12/3/2025 Approved LILIANA PORTILLO