1227 S WILTON PL 90019

Certificate Information: 1227 S WILTON PL 90019

Application / Permit
23014-10000-00386
Plan Check / Job No.
B23LA01468
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Convert existing detached garage to ADU with addition to converted ADU per LAMC 12.22 A.33 (c)-(d). All work per engineer **ePLAN**
Permit Issued
Issued on 6/29/2023
Issuing Office
Current Status
CofO Issued on 1/9/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/1/2023 APPLICANT
Assigned to Plan Check Engineer 2/10/2023 VICTOR CHEN
Corrections Issued 2/13/2023 VICTOR CHEN
Applicant returned to address corrections 3/15/2023 WEIJIAN HUANG
Applicant returned to address corrections 5/17/2023 WEIJIAN HUANG
Plan Check Approved 6/1/2023 VICTOR CHEN
No Progress 6/7/2023 VICTOR CHEN
Plan Check Approved 6/7/2023 VICTOR CHEN
Issued 6/29/2023 APPLICANT
CofO in Progress 5/10/2024 WILLIAM ROSE
No Progress 6/22/2024 SCOTT FINNILA
CofO in Progress 6/22/2024 SCOTT FINNILA
CofO in Progress 1/6/2026 BRENDAN MORELLI
Permit Finaled 1/9/2026 DEROLD HAUFF
CofO Issued 1/9/2026 DEROLD HAUFF
Permit Finaled 1/9/2026 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 2/22/2023 WALLIE JONG
Roof/Waste drainage to street Cleared 2/22/2023 ABEL CASILLAS
Sewer availability Cleared 2/22/2023 ABEL CASILLAS
Eng Process Fee Ord 176,300 Cleared 2/23/2023 ABEL CASILLAS
HPOZ Cleared 3/7/2023 AMANDA KAINER
Miscellaneous Cleared 3/7/2023 AMANDA KAINER
Miscellaneous Cleared 3/7/2023 AMANDA KAINER
Miscellaneous Cleared 3/7/2023 AMANDA KAINER
Construction near power lines Cleared 5/12/2023 WALTER RAMIREZ
HPOZ Cleared 5/30/2023 AMANDA KAINER

Contact Information

Architect Pak,, Christopher C; Lic. No.: C25621 3530 WILSHIRE BLVD SUITE 615      LOS ANGELES, CA 90010
Contractor Ubcon Inc; Lic. No.: 1058343-B       ,
Engineer Kim,, Taewon; Lic. No.: C80632 2320 SANTA CRUZ CT      TORRANCE, CA 90501

Inspector Information

WILLIAM SIERRA, (213) 202-3122 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 7/25/2023 Partial Approval KATHRYN BUTTERWORTH
Underground Mechanical 7/25/2023 Partial Approval KATHRYN BUTTERWORTH
Excavation/Setback/Form/Re-Bar 7/26/2023 Approved KATHRYN BUTTERWORTH
Footing/Foundation/Slab 7/26/2023 Partial Approval KATHRYN BUTTERWORTH
Footing/Foundation/Slab 8/14/2023 Approved KATHRYN BUTTERWORTH
METHANE-Barrier 8/14/2023 Approved KATHRYN BUTTERWORTH
METHANE-Subgrade 8/14/2023 Approved KATHRYN BUTTERWORTH
ELECTRICAL-Rough 9/11/2023 Corrections Issued KATHRYN BUTTERWORTH
HVAC-Rough 9/11/2023 Corrections Issued KATHRYN BUTTERWORTH
PLUMBING-Rough 9/11/2023 Not Ready for Inspection KATHRYN BUTTERWORTH
BUILDING-Rough-Frame 9/12/2023 Not Ready for Inspection KATHRYN BUTTERWORTH
Floor/Roof Diaphrgm/Shear Wall 9/12/2023 Not Ready for Inspection KATHRYN BUTTERWORTH
METHANE-Rough 9/12/2023 Not Ready for Inspection KATHRYN BUTTERWORTH
ELECTRICAL-Rough 10/4/2023 Partial Approval JOSEPH MCGARRY
HVAC-Rough 10/4/2023 Approved JOSEPH MCGARRY
PLUMBING-Rough 10/4/2023 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 10/5/2023 Partial Approval KATHRYN BUTTERWORTH
METHANE-Rough 10/5/2023 Approved KATHRYN BUTTERWORTH
Insulation 10/10/2023 Approved KATHRYN BUTTERWORTH
Interior/Exterior Lathing 10/10/2023 Partial Approval KATHRYN BUTTERWORTH
Drywall Nailing 10/12/2023 Approved JOSH MEISTER
Interior/Exterior Lathing 10/24/2023 Approved JOSH MEISTER
Shower Pan 10/24/2023 Approved JOSH MEISTER
ELECTRICAL-Final 11/2/2023 Not Ready for Inspection KATHRYN BUTTERWORTH
ELECTRICAL-Final 11/27/2023 Not Ready for Inspection KATHRYN BUTTERWORTH
ELECTRICAL-Final 2/7/2024 No Access for Inspection ARTHUR NEGRETE
HVAC-Final 2/7/2024 No Access for Inspection ARTHUR NEGRETE
ELECTRICAL-Final 2/9/2024 No Access for Inspection ARTHUR NEGRETE
HVAC-Final 2/9/2024 No Access for Inspection ARTHUR NEGRETE
ELECTRICAL-Final 2/13/2024 Approved ARTHUR NEGRETE
HVAC-Final 2/13/2024 Approved ARTHUR NEGRETE
PLUMBING-Final 2/13/2024 Approved ARTHUR NEGRETE
BUILDING-Rough-Frame 5/9/2024 Approved ARTHUR NEGRETE
Final 5/9/2024 OK to Issue CofO ARTHUR NEGRETE
SGSOV-Seismic Gas S/O Valve 5/9/2024 SGSOV Approved ARTHUR NEGRETE
Smoke Detectors 5/9/2024 Approved ARTHUR NEGRETE