5759 W 1ST ST 90036

Certificate Information: 5759 W 1ST ST 90036

Application / Permit
23014-10000-00307
Plan Check / Job No.
B23LA01095
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: 18'-5" X 19'-9" ADDITION AND CONVERT 19'-9" X27' 1" PORTION OF EXISTING GARAGE INTO ACCESSORY DWELLING UNIT PER PER LAMC 12.22 A.33(c) AND (d) WITH EXISTING 8' 3" X 19' 9" PORTION OF GARAGE TO REMAIN. ALL WORK DONE PER ENGINEERING.
Permit Issued
Issued on 5/22/2023
Issuing Office
Current Status
Issued on 5/22/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/24/2023 APPLICANT
Assigned to Plan Check Engineer 2/1/2023 DANIEL ABRAMYAN
Corrections Issued 2/2/2023 DANIEL ABRAMYAN
Plan Check Approved 5/18/2023 GURUNATH NESARAJAH
Issued 5/22/2023 APPLICANT

Permit Application Clearance Information

SB8 RUD Cleared 2/2/2023 JESSICA WANG
Address approval Cleared 2/10/2023 CINDY QI
HPOZ Cleared 2/10/2023 DAMIAN GATTO
HPOZ Cleared 2/10/2023 DAMIAN GATTO
Roof/Waste drainage to street Cleared 2/10/2023 CINDY QI
Eng Process Fee Ord 176,300 Cleared 2/13/2023 CINDY QI
Sewer availability Cleared 2/13/2023 CINDY QI
Construction near power lines Cleared 5/7/2023 RIDWAN HARDY
Construction within easement Cleared 5/7/2023 RIDWAN HARDY

Contact Information

Contractor Numa Brothers Construction Inc; Lic. No.: 859857-B       ,
Engineer Sivushenka,, Mikita; Lic. No.: NA87698       ,

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/20/2023 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 12/19/2023 Corrections Issued LILIANA PORTILLO
METHANE-Barrier 12/19/2023 Approved LILIANA PORTILLO
METHANE-Subgrade 12/19/2023 Approved LILIANA PORTILLO
Footing/Foundation/Slab 1/10/2024 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 1/16/2024 Partial Approval LILIANA PORTILLO
Deputy Drilled-In Anchors 1/30/2024 Approved AMIR NAZARIAN
Footing/Foundation/Slab 2/9/2024 Conditional Approval LILIANA PORTILLO
PLUMBING-Rough 3/12/2024 Conditional Approval AMIR NAZARIAN
BUILDING-Rough-Frame 4/5/2024 No Access for Inspection AMIR NAZARIAN
ELECTRICAL-Rough 4/5/2024 No Access for Inspection AMIR NAZARIAN
Floor/Roof Diaphrgm/Shear Wall 4/5/2024 No Access for Inspection AMIR NAZARIAN
Green Building Rough 4/5/2024 No Access for Inspection AMIR NAZARIAN
METHANE-Rough 4/5/2024 No Access for Inspection AMIR NAZARIAN
Green Building Rough 4/22/2024 Approved JEFFREY MEAD
HVAC-Rough 4/22/2024 Approved JEFFREY MEAD
ELECTRICAL-Rough 5/9/2024 Approved AMIR NAZARIAN
Interior/Exterior Lathing 5/9/2024 Corrections Issued AMIR NAZARIAN
Interior/Exterior Lathing 5/14/2024 Corrections Issued AMIR NAZARIAN
Sewer 5/14/2024 Not Ready for Inspection AMIR NAZARIAN
Shower Pan 5/14/2024 Corrections Issued AMIR NAZARIAN
Interior/Exterior Lathing 5/16/2024 Corrections Issued AMIR NAZARIAN
Sewer 5/16/2024 Corrections Issued AMIR NAZARIAN
Shower Pan 5/16/2024 Not Ready for Inspection AMIR NAZARIAN
Insulation 5/20/2024 Not Ready for Inspection AMIR NAZARIAN
Interior/Exterior Lathing 5/20/2024 Approved AMIR NAZARIAN
Shower Pan 5/20/2024 Approved AMIR NAZARIAN
Drywall Nailing 5/23/2024 Not Ready for Inspection AMIR NAZARIAN
Insulation 5/23/2024 Not Ready for Inspection AMIR NAZARIAN
Insulation 5/24/2024 Approved AMIR NAZARIAN
Drywall Nailing 5/28/2024 Approved AMIR NAZARIAN