10300 S HARVARD BLVD 90047

Certificate Information: 10300 S HARVARD BLVD 90047

Application / Permit
23014-10000-00127
Plan Check / Job No.
B23LA00318
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED IRREGULAR SHAPED 2 STORY ADDITION (969.46 SF) AT THE REAR OF THE EXISTING DWELLING. FIRST FLOOR (547.82 SF), SECOND FLOOR (391.64 SF). NFPA 13D FIRE SPRINKLER SYSTEM IS REQUIRED.
Permit Issued
Issued on 11/7/2023
Issuing Office
South Los Angeles
Current Status
CofO Issued on 6/8/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/9/2023 APPLICANT
Assigned to Plan Check Engineer 2/16/2023 NGHI SU
Corrections Issued 2/18/2023 NGHI SU
Quality Review Completed 3/1/2023 KEN GILL
Building Plans Picked Up 3/9/2023 APPLICANT
Applicant returned to address corrections 10/5/2023 NGHI SU
Plan Check Approved 10/25/2023 NGHI SU
Issued 11/7/2023 APPLICANT
CofO in Progress 6/3/2025 JOSE MACIAS
Permit Finaled 6/8/2025 DEROLD HAUFF
CofO Issued 6/8/2025 DEROLD HAUFF
Permit Finaled 6/8/2025 DEROLD HAUFF

Permit Application Clearance Information

Stormwater Pollution Mitigatn Cleared 9/12/2023 SAMUEL LINN
Eng Process Fee Ord 176,300 Cleared 10/6/2023 ADRIAN SANCHEZ
Roof/Waste drainage to street Cleared 10/6/2023 ADRIAN SANCHEZ
Sewer availability Cleared 10/6/2023 ADRIAN SANCHEZ

Contact Information

Contractor Owner-Builder       ,
Engineer Lu,, Yi; Lic. No.: S5678 P O BOX 2754      PALOS VERDES PENINSULA, CA 90274

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 12/26/2023 Corrections Issued DAVID FEILER
METHANE-Barrier 12/26/2023 Partial Inspection DAVID FEILER
METHANE-Subgrade 12/26/2023 Partial Inspection DAVID FEILER
Footing/Foundation/Slab 12/29/2023 Approved ENRIQUE MIRELES
METHANE-Barrier 12/29/2023 Approved ENRIQUE MIRELES
METHANE-Subgrade 12/29/2023 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 1/11/2024 Corrections Issued ENRIQUE MIRELES
METHANE-Rough 1/11/2024 Approved ENRIQUE MIRELES
Wood Frame 1/17/2024 Partial Approval MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 1/18/2024 Partial Approval MICHAEL LEWIS
Insulation 1/18/2024 Partial Approval MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 1/24/2024 Partial Approval ALIZAH MAYAGOITIA
Green Building Rough 1/24/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 5/9/2024 Corrections Issued JOSE MACIAS
Interior/Exterior Lathing 6/5/2024 Approved JOSE MACIAS
BUILDING-Rough-Frame 10/16/2024 Corrections Issued JOSE MACIAS
Insulation 10/16/2024 Corrections Issued JOSE MACIAS
Rough-Elec/Plmb/HVAC 10/16/2024 Approved JOSE MACIAS
Insulation 11/14/2024 Corrections Issued JOHN QUINTANILLA
BUILDING-Rough-Frame 11/19/2024 Approved JOSE MACIAS
Green Building Rough 11/19/2024 Approved JOSE MACIAS
Insulation 11/19/2024 Approved JOSE MACIAS
Drywall Nailing 12/31/2024 Partial Approval AMIR NAZARIAN
ELECTRICAL-Rough 3/24/2025 No Access for Inspection JOSE MACIAS
Drywall Nailing 3/28/2025 No Access for Inspection JOSE MACIAS
Final 3/28/2025 Not Ready for Inspection JOSE MACIAS
Green Building Final 3/28/2025 No Access for Inspection JOSE MACIAS
SGSOV-Seismic Gas S/O Valve 3/28/2025 SGSOV Not Ready JOSE MACIAS
Smoke Detectors 3/28/2025 No Access for Inspection JOSE MACIAS
Pre-Inspection 4/2/2025 Not Ready for Inspection WAYNE REGESTER
Drywall Nailing 4/30/2025 Approved JOSE MACIAS
Final 4/30/2025 Corrections Issued JOSE MACIAS
Green Building Final 4/30/2025 Approved JOSE MACIAS
SGSOV-Seismic Gas S/O Valve 4/30/2025 SGSOV Approved JOSE MACIAS
Smoke Detectors 4/30/2025 Approved JOSE MACIAS
Final 5/15/2025 Partial Approval WAYNE REGESTER
Final 5/21/2025 Corrections Issued JOSE MACIAS
Final 6/2/2025 OK to Issue CofO JOSE MACIAS