10300 S HARVARD BLVD 90047
Certificate Information: 10300 S HARVARD BLVD 90047
- Application / Permit
- 23014-10000-00127
- Plan Check / Job No.
- B23LA00318
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- PROPOSED IRREGULAR SHAPED 2 STORY ADDITION (969.46 SF) AT THE REAR OF THE EXISTING DWELLING. FIRST FLOOR (547.82 SF), SECOND FLOOR (391.64 SF). NFPA 13D FIRE SPRINKLER SYSTEM IS REQUIRED.
- Permit Issued
- Issued on 11/7/2023
- Issuing Office
- South Los Angeles
- Current Status
- CofO Issued on 6/8/2025
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 1/9/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 2/16/2023 | NGHI SU |
| Corrections Issued | 2/18/2023 | NGHI SU |
| Quality Review Completed | 3/1/2023 | KEN GILL |
| Building Plans Picked Up | 3/9/2023 | APPLICANT |
| Applicant returned to address corrections | 10/5/2023 | NGHI SU |
| Plan Check Approved | 10/25/2023 | NGHI SU |
| Issued | 11/7/2023 | APPLICANT |
| CofO in Progress | 6/3/2025 | JOSE MACIAS |
| Permit Finaled | 6/8/2025 | DEROLD HAUFF |
| CofO Issued | 6/8/2025 | DEROLD HAUFF |
| Permit Finaled | 6/8/2025 | DEROLD HAUFF |
Permit Application Clearance Information
| Stormwater Pollution Mitigatn | Cleared | 9/12/2023 | SAMUEL LINN |
| Eng Process Fee Ord 176,300 | Cleared | 10/6/2023 | ADRIAN SANCHEZ |
| Roof/Waste drainage to street | Cleared | 10/6/2023 | ADRIAN SANCHEZ |
| Sewer availability | Cleared | 10/6/2023 | ADRIAN SANCHEZ |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Lu,, Yi; Lic. No.: S5678 | P O BOX 2754 PALOS VERDES PENINSULA, CA 90274 |
Inspector Information
| SALVADOR MARTINEZ, (213) 202-3479 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 12/26/2023 | Corrections Issued | DAVID FEILER |
| METHANE-Barrier | 12/26/2023 | Partial Inspection | DAVID FEILER |
| METHANE-Subgrade | 12/26/2023 | Partial Inspection | DAVID FEILER |
| Footing/Foundation/Slab | 12/29/2023 | Approved | ENRIQUE MIRELES |
| METHANE-Barrier | 12/29/2023 | Approved | ENRIQUE MIRELES |
| METHANE-Subgrade | 12/29/2023 | Approved | ENRIQUE MIRELES |
| BUILDING-Rough-Frame | 1/11/2024 | Corrections Issued | ENRIQUE MIRELES |
| METHANE-Rough | 1/11/2024 | Approved | ENRIQUE MIRELES |
| Wood Frame | 1/17/2024 | Partial Approval | MICHAEL LEWIS |
| Floor/Roof Diaphrgm/Shear Wall | 1/18/2024 | Partial Approval | MICHAEL LEWIS |
| Insulation | 1/18/2024 | Partial Approval | MICHAEL LEWIS |
| Floor/Roof Diaphrgm/Shear Wall | 1/24/2024 | Partial Approval | ALIZAH MAYAGOITIA |
| Green Building Rough | 1/24/2024 | Not Ready for Inspection | ALIZAH MAYAGOITIA |
| Floor/Roof Diaphrgm/Shear Wall | 5/9/2024 | Corrections Issued | JOSE MACIAS |
| Interior/Exterior Lathing | 6/5/2024 | Approved | JOSE MACIAS |
| BUILDING-Rough-Frame | 10/16/2024 | Corrections Issued | JOSE MACIAS |
| Insulation | 10/16/2024 | Corrections Issued | JOSE MACIAS |
| Rough-Elec/Plmb/HVAC | 10/16/2024 | Approved | JOSE MACIAS |
| Insulation | 11/14/2024 | Corrections Issued | JOHN QUINTANILLA |
| BUILDING-Rough-Frame | 11/19/2024 | Approved | JOSE MACIAS |
| Green Building Rough | 11/19/2024 | Approved | JOSE MACIAS |
| Insulation | 11/19/2024 | Approved | JOSE MACIAS |
| Drywall Nailing | 12/31/2024 | Partial Approval | AMIR NAZARIAN |
| ELECTRICAL-Rough | 3/24/2025 | No Access for Inspection | JOSE MACIAS |
| Drywall Nailing | 3/28/2025 | No Access for Inspection | JOSE MACIAS |
| Final | 3/28/2025 | Not Ready for Inspection | JOSE MACIAS |
| Green Building Final | 3/28/2025 | No Access for Inspection | JOSE MACIAS |
| SGSOV-Seismic Gas S/O Valve | 3/28/2025 | SGSOV Not Ready | JOSE MACIAS |
| Smoke Detectors | 3/28/2025 | No Access for Inspection | JOSE MACIAS |
| Pre-Inspection | 4/2/2025 | Not Ready for Inspection | WAYNE REGESTER |
| Drywall Nailing | 4/30/2025 | Approved | JOSE MACIAS |
| Final | 4/30/2025 | Corrections Issued | JOSE MACIAS |
| Green Building Final | 4/30/2025 | Approved | JOSE MACIAS |
| SGSOV-Seismic Gas S/O Valve | 4/30/2025 | SGSOV Approved | JOSE MACIAS |
| Smoke Detectors | 4/30/2025 | Approved | JOSE MACIAS |
| Final | 5/15/2025 | Partial Approval | WAYNE REGESTER |
| Final | 5/21/2025 | Corrections Issued | JOSE MACIAS |
| Final | 6/2/2025 | OK to Issue CofO | JOSE MACIAS |