4192 S HARVARD BLVD 90062

Certificate Information: 4192 S HARVARD BLVD 90062

Application / Permit
23014-10000-00083
Plan Check / Job No.
B23LA00162
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: REMOVE ENTIRE (E) GARAGE EXCEPT ONE WALL AND CONVERT GARAGE TO ACCESSORY DWELLING UNIT WITH 25'-0" x 22'-3"ADDITION TO COMPLY WITH LAMC 12.22 A.33(c) AND (d). ALL WORK DONE PER ENGINEERING.
Permit Issued
Issued on 3/20/2023
Issuing Office
Current Status
CofO Issued on 11/26/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/6/2023 APPLICANT
Assigned to Plan Check Engineer 1/13/2023 GURUNATH NESARAJAH
Corrections Issued 1/17/2023 ALFRED RAMIREZ
Plan Check Approved 3/19/2023 GURUNATH NESARAJAH
Issued 3/20/2023 APPLICANT
CofO in Progress 11/7/2023 SABAS ALONSO
Permit Finaled 11/26/2023 DEROLD HAUFF
CofO Issued 11/26/2023 DEROLD HAUFF
Permit Finaled 11/26/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 1/24/2023 ADRIAN SANCHEZ
Low Impact Development Cleared 2/27/2023 ERNEST TSE
Eng Process Fee Ord 176,300 Cleared 3/9/2023 CELINA MORENO
Roof/Waste drainage to street Cleared 3/9/2023 CELINA MORENO
Sewer availability Cleared 3/9/2023 CELINA MORENO

Contact Information

Contractor Greentech Builders Inc; Lic. No.: 999332-B       ,
Engineer Southerland,, Richard Charles; Lic. No.: C88965 16526 BLACKHAWK ST      GRANADA HILLS, CA 91344

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/2/2023 Partial Approval SABAS ALONSO
Footing/Foundation/Slab 5/2/2023 Corrections Issued SABAS ALONSO
Underground Mechanical 5/2/2023 Not Ready for Inspection SABAS ALONSO
Excavation/Setback/Form/Re-Bar 5/8/2023 Approved ALIZAH MAYAGOITIA
PLUMBING-Rough 5/8/2023 Partial Approval ALIZAH MAYAGOITIA
Sewer 5/8/2023 Approved ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 5/24/2023 Approved SABAS ALONSO
HVAC-Rough 6/1/2023 Corrections Issued STUART CHAPMAN
BUILDING-Rough-Frame 6/9/2023 Not Ready for Inspection SABAS ALONSO
ELECTRICAL-Rough 6/9/2023 Corrections Issued SABAS ALONSO
Green Building Rough 6/9/2023 Approved SABAS ALONSO
HVAC-Rough 6/9/2023 Corrections Issued SABAS ALONSO
PLUMBING-Rough 6/9/2023 Corrections Issued SABAS ALONSO
ELECTRICAL-Rough 6/13/2023 Approved SABAS ALONSO
Gas Test 6/13/2023 Not Ready for Inspection SABAS ALONSO
HVAC-Rough 6/13/2023 Not Ready for Inspection SABAS ALONSO
PLUMBING-Rough 6/13/2023 Not Ready for Inspection SABAS ALONSO
BUILDING-Rough-Frame 6/15/2023 Approved SABAS ALONSO
Gas Test 6/15/2023 Not Ready for Inspection SABAS ALONSO
PLUMBING-Rough 6/15/2023 Approved SABAS ALONSO
Insulation 6/26/2023 Approved SABAS ALONSO
Interior/Exterior Lathing 6/26/2023 Not Ready for Inspection SABAS ALONSO
Drywall Nailing 7/3/2023 Conditional Approval JOSEPH MCGARRY
Drywall Nailing 7/14/2023 Approved SABAS ALONSO
Interior/Exterior Lathing 7/19/2023 Partial Approval ALEJANDRO DE ARTOLA
Shower Pan 7/26/2023 Approved MICHAEL LEWIS
Interior/Exterior Lathing 7/31/2023 Approved CHARLES BOGHOSKHAN
Gas Test 8/21/2023 Corrections Issued SABAS ALONSO
Gas Test 8/23/2023 Approved CHARLES BOGHOSKHAN
ELECTRICAL-Final 8/28/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
HVAC-Final 8/28/2023 Approved ALIZAH MAYAGOITIA
PLUMBING-Final 8/28/2023 Corrections Issued ALIZAH MAYAGOITIA
ELECTRICAL-Final 8/30/2023 Corrections Issued SABAS ALONSO
PLUMBING-Final 8/30/2023 Approved SABAS ALONSO
ELECTRICAL-Final 9/5/2023 Corrections Issued BRENDAN MORELLI
ELECTRICAL-Final 9/7/2023 Approved STUART CHAPMAN
Final 9/7/2023 Corrections Issued STUART CHAPMAN
Footing/Foundation/Slab 9/7/2023 Approved STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 9/7/2023 SGSOV Approved STUART CHAPMAN
Smoke Detectors 9/7/2023 Approved STUART CHAPMAN
Pre-Inspection 9/29/2023 Corrections Issued SABAS ALONSO
Final 11/6/2023 OK to Issue CofO SABAS ALONSO