632-634 S MORENO AVE 90049

Certificate Information: 632-634 S MORENO AVE 90049

Application / Permit
23010-30000-03562
Plan Check / Job No.
B23WL02246
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New 2-story SFD with 1-level basement, w./ att. 3-car garage and attached ADU (460 sf) at rear side per LAMC 12.22 A.33(c) AND (e)
Permit Issued
Issued on 11/9/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 12/18/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/6/2023 APPLICANT
Assigned to Plan Check Engineer 9/6/2023 REZA HAGHIGHAT
Corrections Issued 9/12/2023 REZA HAGHIGHAT
Quality Review Completed 9/19/2023 KAVIAN REFAHI
Building Plans Picked Up 9/20/2023 APPLICANT
Plan Check Approved 11/6/2023 REZA HAGHIGHAT
Issued 11/9/2023 APPLICANT
Permit Finaled 12/18/2025 RICHARD STEINBACH
CofO Issued 12/18/2025 RICHARD STEINBACH
Permit Finaled 12/18/2025 RICHARD STEINBACH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/14/2023 DARIN LAM
Permit Cleared 9/14/2023 DARIN LAM
Sewer availability Cleared 9/14/2023 DARIN LAM
Address approval Cleared 9/19/2023 DARIN LAM
ZA Case Cleared 9/19/2023 DANIEL CORONADO
Hydrant and Access approval Cleared 10/8/2023 JOHN CONNEALLY
Low Impact Development (LID) Cleared 10/19/2023 VICTOR MENDOZA
Roof/Waste drainage to street Cleared 10/22/2023 AHMED AMARRAGY
Trees in Parkway Cleared 10/23/2023 ADALBERTO VERA
Specific Plan Cleared 11/1/2023 JOSHUA JONES
Excavation more than 5-ft deep Cleared 11/6/2023 CALOSHA APPROVED

Contact Information

Architect Walters,, Jonathan A; Lic. No.: C33220 4634 LAURELGROVE AVENUE      STUDIO CITY, CA 91604
Contractor Vip Construction 1 Inc; Lic. No.: 1097925-B 11038 BENWELL DRIVE APT D      LYNWOOD, CA 90262
Engineer Le,, Thang Huu; Lic. No.: C63174 507 MAGELLAN RD      ARCADIA, CA 91007
Engineer Le,, Thang Huu; Lic. No.: S4978 507 MAGELLAN RD      ARCADIA, CA 91007

Inspector Information

ANTHONY EGSON, (310) 914-3893 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/15/2023 Approved BEN MOLSTAD
Excavation/Setback/Form/Re-Bar 2/16/2024 Partial Approval EVAN COOPER
Footing/Foundation/Slab 2/16/2024 Partial Approval EVAN COOPER
Underground Mechanical 2/16/2024 Partial Approval EVAN COOPER
Footing/Foundation/Slab 3/13/2024 Partial Approval TEMISTOCLES CAAL
PLUMBING-Rough 3/13/2024 Not Ready for Inspection TEMISTOCLES CAAL
PLUMBING-Rough 3/15/2024 Partial Approval OGANES TARAKHCHYAN
Footing/Foundation/Slab 4/1/2024 Corrections Issued ASHLEY THOMPSON
Excavation/Setback/Form/Re-Bar 4/3/2024 Not Ready for Inspection ASHLEY THOMPSON
PLUMBING-Rough 4/3/2024 Partial Approval ASHLEY THOMPSON
Footing/Foundation/Slab 4/8/2024 Partial Approval ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 4/26/2024 Corrections Issued ASHLEY THOMPSON
Deputy Wood Construction 4/29/2024 Conditional Approval MICHAEL PELHAM
Deputy Drilled-In Anchors 5/10/2024 Conditional Approval MICHAEL PELHAM
PLUMBING-Rough 5/13/2024 Partial Approval ASHLEY THOMPSON
Special/Order Compliance 5/13/2024 Partial Approval KIRK SANDERS
Excavation/Setback/Form/Re-Bar 5/16/2024 Approved MICHAEL PELHAM
Footing/Foundation/Slab 5/16/2024 Approved MICHAEL PELHAM
Deputy Wood Construction 6/5/2024 Approved KIRK SANDERS
Floor/Roof Diaphrgm/Shear Wall 6/5/2024 Partial Approval KIRK SANDERS
BUILDING-Rough-Frame 9/18/2024 Corrections Issued KIRK SANDERS
Floor/Roof Diaphrgm/Shear Wall 9/18/2024 Conditional Approval KIRK SANDERS
PLUMBING-Rough 9/24/2024 Corrections Issued KIRK SANDERS
ELECTRICAL-Rough 10/18/2024 Corrections Issued KIRK SANDERS
Floor/Roof Diaphrgm/Shear Wall 11/12/2024 Partial Approval KIRK SANDERS
HVAC-Rough 11/12/2024 Corrections Issued KIRK SANDERS
PLUMBING-Rough 11/12/2024 Partial Approval KIRK SANDERS
ELECTRICAL-Rough 11/26/2024 Approved ARAM AVEDISIAN
HVAC-Rough 11/26/2024 Approved ARAM AVEDISIAN
PLUMBING-Rough 11/26/2024 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 12/24/2024 Conditional Approval EVAN COOPER
Verify Sprinkler Sign Off 12/24/2024 Approved EVAN COOPER
Deputy Drilled-In Anchors 1/16/2025 Conditional Approval KIRK SANDERS
Interior/Exterior Lathing 1/30/2025 Not Ready for Inspection KIRK SANDERS
BUILDING-Rough-Frame 2/3/2025 Approved KIRK SANDERS
Green Building Rough 2/3/2025 Approved KIRK SANDERS
Interior/Exterior Lathing 2/3/2025 Partial Approval KIRK SANDERS
Shower Pan 2/3/2025 Not Ready for Inspection KIRK SANDERS
Insulation 2/6/2025 Not Ready for Inspection KIRK SANDERS
Shower Pan 2/6/2025 Approved KIRK SANDERS
Insulation 2/10/2025 Approved MICHAEL ALLEN
Interior/Exterior Lathing 3/3/2025 Partial Approval KIRK SANDERS
Drywall Nailing 3/4/2025 Approved KIRK SANDERS
Interior/Exterior Lathing 3/27/2025 Partial Approval KIRK SANDERS
Deputy Wood Construction 5/1/2025 Conditional Approval MICHAEL PELHAM
PLUMBING-Final 8/5/2025 Corrections Issued TEMISTOCLES CAAL
ELECTRICAL-Final 8/6/2025 Approved STEPHANIE SWANSON
Service/Power Release 8/6/2025 Approved STEPHANIE SWANSON
HVAC-Final 8/7/2025 Corrections Issued STEPHANIE SWANSON
HVAC-Final 8/21/2025 Not Ready for Inspection ARAM AVEDISIAN
PLUMBING-Final 8/21/2025 Corrections Issued ARAM AVEDISIAN
HVAC-Final 8/29/2025 Approved TEMISTOCLES CAAL
PLUMBING-Final 8/29/2025 Not Ready for Inspection TEMISTOCLES CAAL
PLUMBING-Final 9/11/2025 Not Ready for Inspection ARAM AVEDISIAN
PLUMBING-Final 9/19/2025 Approved ARAM AVEDISIAN
Final 12/8/2025 Conditional Approval MICHAEL ALLEN
Green Building Final 12/8/2025 Approved MICHAEL ALLEN
Reinforced Concrete Frame 12/8/2025 Approved MICHAEL ALLEN
SGSOV-Seismic Gas S/O Valve 12/8/2025 SGSOV No Gas MICHAEL ALLEN
Smoke Detectors 12/8/2025 Approved MICHAEL ALLEN