259 S PARK VIEW ST 90057

Certificate Information: 259 S PARK VIEW ST 90057

Application / Permit
23010-30000-00296
Plan Check / Job No.
B23WL00177
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
New 3-story duplex w/ att. 2-car garage and roof deck above and att. ADU per LAMC 12.22 A.33(c) AND (d) at rear of the lot ;
Permit Issued
Issued on 12/22/2023
Issuing Office
Metro
Current Status
CofO Issued on 11/9/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/24/2023 APPLICANT
Assigned to Plan Check Engineer 2/16/2023 REZA HAGHIGHAT
Corrections Issued 2/21/2023 REZA HAGHIGHAT
Quality Review Completed 3/1/2023 CHIHARU SUZUKI
Building Plans Picked Up 3/1/2023 APPLICANT
Disabled Access Plans Picked Up 3/8/2023 APPLICANT
Plan Check Approved 6/1/2023 REZA HAGHIGHAT
Issued 12/22/2023 APPLICANT
CofO in Progress 10/29/2025 FREDDIE RIVERA
No Progress 10/30/2025 FREDDIE RIVERA
CofO in Progress 10/30/2025 FREDDIE RIVERA
Permit Finaled 11/9/2025 DEROLD HAUFF
CofO Issued 11/9/2025 DEROLD HAUFF
Permit Finaled 11/9/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 3/1/2023 CINDY QI
Roof/Waste drainage to street Cleared 3/1/2023 CINDY QI
Eng Process Fee Ord 176,300 Cleared 3/2/2023 CINDY QI
Sewer availability Cleared 3/2/2023 CINDY QI
SB8 RUD Cleared 3/5/2023 RICHARD TRUONG
Hydrant and Access approval Cleared 3/22/2023 KURT CORRAL
Low Impact Development (LID) Cleared 3/28/2023 ANTHONY VARGAS
Trees in Parkway Cleared 3/28/2023 ADALBERTO VERA
Frnt yard landscape/Water mgmt Cleared 3/29/2023 KENTON TRINH
Construction near power lines Cleared 4/14/2023 RIDWAN HARDY
Permit Cleared 4/19/2023 STEVE MELGAR
DAS Clearance Cleared 5/26/2023 CHIHARU SUZUKI
Highway dedication Cleared 5/26/2023 STEVE MELGAR
GPI Written Notices Cleared 6/1/2023 REZA HAGHIGHAT
Grading Pre-Inspection Cleared 6/1/2023 REZA HAGHIGHAT

Contact Information

Architect Walters,, Jonathan A; Lic. No.: C33220 4634 LAURELGROVE AVENUE      STUDIO CITY, CA 91604
Contractor Residential Alchemists; Lic. No.: 1098394-B 2088 S ATLANTIC BLVD #276      MONTEREY PARK, CA 91754
Engineer Le,, Thang Huu; Lic. No.: C63174 507 MAGELLAN RD      ARCADIA, CA 91007
Engineer Le,, Thang Huu; Lic. No.: S4978 507 MAGELLAN RD      ARCADIA, CA 91007
Geologist , ; Lic. No.: GEO2921 123 N VALENCIA ST      ALHAMBRA, CA 91801
Geologist Kruger,, Mark Otto; Lic. No.: EG2345 10120 NATIONAL BLVD      LOS ANGELES, CA 90034

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/11/2024 Partial Inspection FREDDIE RIVERA
Footing/Foundation/Slab 4/11/2024 Partial Inspection FREDDIE RIVERA
METHANE-Barrier 4/11/2024 Partial Inspection FREDDIE RIVERA
METHANE-Subgrade 4/11/2024 Partial Inspection FREDDIE RIVERA
PLUMBING-Rough 4/11/2024 Partial Approval FREDDIE RIVERA
Pre-Inspection 4/11/2024 Corrections Issued FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 4/12/2024 Corrections Issued FREDDIE RIVERA
Underground Mechanical 4/12/2024 Partial Inspection FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 4/17/2024 Approved FREDDIE RIVERA
PLUMBING-Rough 4/17/2024 Partial Approval FREDDIE RIVERA
Deputy Methane Barrier 4/24/2024 Partial Approval ARTHUR NEGRETE
Excavation/Setback/Form/Re-Bar 5/9/2024 Approved FREDDIE RIVERA
Footing/Foundation/Slab 5/9/2024 Approved FREDDIE RIVERA
METHANE-Barrier 5/9/2024 Approved FREDDIE RIVERA
METHANE-Subgrade 5/9/2024 Approved FREDDIE RIVERA
Deputy Steel/Welding 5/22/2024 Conditional Approval FREDDIE RIVERA
Deputy Steel/Welding 6/4/2024 Conditional Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 6/4/2024 Partial Approval FREDDIE RIVERA
Deputy Wood Construction 6/5/2024 Conditional Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 6/13/2024 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 8/5/2024 Partial Approval FREDDIE RIVERA
Special/Order Compliance 8/5/2024 Corrections Issued FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 8/13/2024 Partial Approval FREDDIE RIVERA
HVAC-Rough 8/15/2024 Partial Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 8/16/2024 Corrections Issued FREDDIE RIVERA
ELECTRICAL-Rough 8/16/2024 Partial Inspection FREDDIE RIVERA
Green Building Rough 8/16/2024 Partial Inspection FREDDIE RIVERA
HVAC-Rough 8/16/2024 Corrections Issued FREDDIE RIVERA
PLUMBING-Rough 8/16/2024 Corrections Issued FREDDIE RIVERA
Verify Sprinkler Sign Off 8/16/2024 Corrections Issued FREDDIE RIVERA
Wood Frame 8/16/2024 Partial Inspection FREDDIE RIVERA
HVAC-Rough 8/28/2024 Approved FREDDIE RIVERA
PLUMBING-Rough 8/28/2024 Conditional Approval FREDDIE RIVERA
Special/Order Compliance 8/28/2024 Partial Approval NICHOLAS LOPEZ
Wood Frame 8/28/2024 Partial Inspection FREDDIE RIVERA
Verify Sprinkler Sign Off 9/13/2024 Approved FREDDIE RIVERA
ELECTRICAL-Rough 9/16/2024 Corrections Issued FREDDIE RIVERA
Wood Frame 9/16/2024 Partial Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 9/17/2024 Corrections Issued FREDDIE RIVERA
ELECTRICAL-Rough 9/17/2024 Approved FREDDIE RIVERA
Green Building Rough 9/17/2024 Approved FREDDIE RIVERA
Interior/Exterior Lathing 9/17/2024 Approved FREDDIE RIVERA
METHANE-Rough 9/17/2024 Approved FREDDIE RIVERA
Insulation 9/24/2024 Not Ready for Inspection NICHOLAS LOPEZ
Insulation 9/25/2024 Approved FREDDIE RIVERA
Drywall Nailing 10/2/2024 Partial Approval FREDDIE RIVERA
Drywall Nailing 10/11/2024 Approved OSVALDO PARAMO
Shower Pan 10/31/2024 Partial Approval NICHOLAS LOPEZ
Interior/Exterior Lathing 11/12/2024 Approved FREDDIE RIVERA
Shower Pan 11/12/2024 Approved FREDDIE RIVERA
Sewer 12/31/2024 Corrections Issued JOSH MEISTER
Sewer 1/3/2025 Approved BRENDAN MORELLI
BUILDING-Rough-Frame 2/21/2025 Approved FREDDIE RIVERA
Underground Mechanical 2/21/2025 Partial Approval FREDDIE RIVERA
ELECTRICAL-Final 4/30/2025 Partial Inspection FREDDIE RIVERA
HVAC-Final 4/30/2025 Approved FREDDIE RIVERA
PLUMBING-Final 4/30/2025 Corrections Issued FREDDIE RIVERA
ELECTRICAL-Final 5/19/2025 Corrections Issued FREDDIE RIVERA
Green Building Final 5/19/2025 Partial Inspection FREDDIE RIVERA
PLUMBING-Final 5/19/2025 Approved FREDDIE RIVERA
Service/Power Release 5/19/2025 Partial Inspection FREDDIE RIVERA
Smoke Detectors 5/19/2025 Approved FREDDIE RIVERA
ELECTRICAL-Final 5/20/2025 Approved FREDDIE RIVERA
PLUMBING-Final 5/20/2025 Approved FREDDIE RIVERA
Service/Power Release 5/20/2025 Approved FREDDIE RIVERA
Service/Power Release 5/29/2025 Approved FREDDIE RIVERA
Service/Power Release 9/3/2025 Approved FREDDIE RIVERA
Special/Order Compliance 9/16/2025 Corrections Issued FREDDIE RIVERA
Final 9/17/2025 Corrections Issued FREDDIE RIVERA
Green Building Final 9/17/2025 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 9/17/2025 SGSOV Approved FREDDIE RIVERA
Structural Steel Frame 9/17/2025 Approved FREDDIE RIVERA
Final 10/10/2025 Partial Inspection FREDDIE RIVERA
Final 10/20/2025 Conditional Approval FREDDIE RIVERA
Final 10/23/2025 OK to Issue CofO FREDDIE RIVERA