10476 W WILKINS AVE 90024

Certificate Information: 10476 W WILKINS AVE 90024

Application / Permit
23010-20000-04258
Plan Check / Job No.
B23VN14579
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
New detached 28' x 18' irregular shaped ADU perCA Govt. Code 65852.2(e)(1)(B) and applicable part2 of LAMC 12.22 A.33 (c)-(d), (g). NFPA 13D sprinklers required thru out. All work done per engineer.
Permit Issued
Issued on 7/18/2024
Issuing Office
West Los Angeles
Current Status
CofO Issued on 1/13/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/23/2023 APPLICANT
Assigned to Plan Check Engineer 11/2/2023 NAREG ATARIAN
Corrections Issued 11/3/2023 NAREG ATARIAN
Quality Review Completed 11/8/2023 OMID HEDAYAT
Building Plans Picked Up 11/13/2023 APPLICANT
Applicant returned to address corrections 2/28/2024 NAREG ATARIAN
Plan Check Approved 4/22/2024 NAREG ATARIAN
Issued 7/18/2024 APPLICANT
CofO in Progress 1/6/2026 DANIEL VERA
Permit Finaled 1/13/2026 RICHARD STEINBACH
CofO Issued 1/13/2026 RICHARD STEINBACH
Permit Finaled 1/13/2026 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 12/7/2023 LIAM ODONOVAN
Eng Process Fee Ord 176,300 Cleared 12/7/2023 LIAM ODONOVAN
Sewer availability Cleared 12/7/2023 LIAM ODONOVAN
Specific Plan Cleared 12/18/2023 EDUARDO HERMOSO
Metro Rail approval Cleared 12/27/2023 JENNIFER SU
Low Impact Development (LID) Cleared 1/4/2024 PATRICK LOPEZ
Roof/Waste drainage to street Cleared 1/5/2024 LIAM ODONOVAN
Construction near power lines Cleared 3/27/2024 RIDWAN HARDY
Construction within easement Cleared 3/27/2024 RIDWAN HARDY

Contact Information

Architect Janev,, Valentine S; Lic. No.: C19379 20600 VENTURA BLVD UNIT 2319      WOODLAND HILLS, CA 91364
Contractor Owner-Builder       ,
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065
Engineer Yuzon,, Benigno Sari; Lic. No.: S3454 2511 PEACHWOOD PLACE      WESTLAKE VILLAGE, CA 91361

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 10/18/2024 Partial Approval ARAM AVEDISIAN
METHANE-Rough 10/30/2024 Not Ready for Inspection STEPHANIE SWANSON
METHANE-Subgrade 10/30/2024 Conditional Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 12/5/2024 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 12/5/2024 Not Ready for Inspection STEPHANIE SWANSON
METHANE-Barrier 12/5/2024 Approved STEPHANIE SWANSON
METHANE-Subgrade 12/5/2024 Not Ready for Inspection STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 12/10/2024 Approved STEPHANIE SWANSON
Footing/Foundation/Slab 12/10/2024 Approved STEPHANIE SWANSON
METHANE-Subgrade 12/10/2024 Approved STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 2/25/2025 Partial Approval STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 4/9/2025 Not Ready for Inspection DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 4/17/2025 Approved DANIEL VERA
PLUMBING-Rough 4/17/2025 Approved DANIEL VERA
Sewer 4/17/2025 Not Ready for Inspection DANIEL VERA
Sewer 4/22/2025 Approved DANIEL VERA
ELECTRICAL-Rough 4/29/2025 Corrections Issued KIRK SANDERS
HVAC-Rough 4/29/2025 Corrections Issued KIRK SANDERS
ELECTRICAL-Rough 5/5/2025 Approved DANIEL VERA
HVAC-Rough 5/5/2025 Approved DANIEL VERA
BUILDING-Rough-Frame 5/27/2025 Corrections Issued DANIEL VERA
Green Building Rough 5/27/2025 Approved DANIEL VERA
Interior/Exterior Lathing 5/27/2025 Partial Approval DANIEL VERA
METHANE-Rough 5/27/2025 Not Ready for Inspection DANIEL VERA
Shower Pan 5/27/2025 Approved DANIEL VERA
Verify Sprinkler Sign Off 5/27/2025 Approved DANIEL VERA
BUILDING-Rough-Frame 5/29/2025 Approved MEL KHACHATOURIAN
METHANE-Rough 5/29/2025 Approved MEL KHACHATOURIAN
Insulation 6/2/2025 Corrections Issued JAYLIN GRAVITTE
Insulation 6/5/2025 Approved SEAN HAUPT
Drywall Nailing 6/10/2025 Approved DANIEL VERA
Interior/Exterior Lathing 6/10/2025 Approved DANIEL VERA
ELECTRICAL-Final 12/17/2025 Corrections Issued EVAN COOPER
HVAC-Final 12/17/2025 Corrections Issued EVAN COOPER
ELECTRICAL-Final 12/23/2025 Approved EVAN COOPER
HVAC-Final 12/23/2025 Approved EVAN COOPER
Service/Power Release 12/30/2025 Approved DANIEL VERA
ELECTRICAL-Final 1/2/2026 Approved CARLOS MATAMOROS
Final 1/2/2026 Partial Approval CARLOS MATAMOROS
Green Building Final 1/2/2026 Approved CARLOS MATAMOROS
PLUMBING-Final 1/2/2026 Approved CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 1/2/2026 SGSOV Approved CARLOS MATAMOROS
Service/Power Release 1/2/2026 Approved CARLOS MATAMOROS
Smoke Detectors 1/2/2026 Approved CARLOS MATAMOROS
Final 1/5/2026 OK to Issue CofO DANIEL VERA