12237 W HUSTON ST 91607

Certificate Information: 12237 W HUSTON ST 91607

Application / Permit
23010-20000-03928
Plan Check / Job No.
B23VN13343
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Recreation Room
Work Description
(N) 19' x 12'-8" DETACHED REC ROOM WITH ATTACHED FULL BATHROOM (ACCESS TOWARDS POOL ONLY) ALL WORK PER ENGINEERING
Permit Issued
Issued on 2/20/2024
Issuing Office
Valley
Current Status
CofO Issued on 2/4/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/29/2023 APPLICANT
Assigned to Plan Check Engineer 10/12/2023 SEWADA ZADOORIAN MILAGARDI
Corrections Issued 10/17/2023 SEWADA ZADOORIAN MILAGARDI
Quality Review Completed 10/19/2023 OMID HEDAYAT
Building Plans Picked Up 10/25/2023 APPLICANT
Applicant returned to address corrections 12/26/2023 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 2/15/2024 SEWADA ZADOORAN MILAGARDI
Issued 2/20/2024 APPLICANT
CofO in Progress 1/3/2025 OGANES TARAKHCHYAN
Permit Finaled 2/4/2025 RUBEN SALAS
CofO Issued 2/4/2025 RUBEN SALAS
Permit Finaled 2/4/2025 RUBEN SALAS

Permit Application Clearance Information

Sewer availability Cleared 10/26/2023 EDGAR ALCARAZ
Eng Process Fee Ord 176,300 Cleared 10/27/2023 EDGAR ALCARAZ
Miscellaneous Cleared 11/2/2023 JOANNA MARROQUIN
Specific Plan Cleared 11/2/2023 JOANNA MARROQUIN
ZI Cleared 11/2/2023 JOANNA MARROQUIN
Low Impact Development (LID) Cleared 12/8/2023 ROGELIO CORTES
Roof/Waste drainage to street Cleared 12/8/2023 EDGAR ALCARAZ
Hydrant and Access approval Cleared 12/18/2023 LAVEON RIDER
Construction near power lines Cleared 2/8/2024 RIDWAN HARDY
Construction within easement Cleared 2/8/2024 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 3/20/2024 Partial Approval ROBERTO PALACIOS-LOPEZ
Footing/Foundation/Slab 4/4/2024 Partial Inspection JOSE AVILA
Footing/Foundation/Slab 4/9/2024 Approved JOSE AVILA
BUILDING-Rough-Frame 4/19/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Green Building Rough 4/19/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Verify Sprinkler Sign Off 4/19/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Wood Frame 4/19/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 5/8/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 5/8/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Green Building Rough 5/8/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Structural Steel Frame 5/8/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Verify Sprinkler Sign Off 5/8/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Wood Frame 5/8/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 5/15/2024 Approved JOHN COLEMAN
BUILDING-Rough-Frame 5/17/2024 Partial Approval JOHN COLEMAN
Green Building Rough 5/17/2024 Not Ready for Inspection JOHN COLEMAN
Structural Steel Frame 5/17/2024 Corrections Issued JOHN COLEMAN
Verify Sprinkler Sign Off 5/17/2024 Not Ready for Inspection JOHN COLEMAN
Wood Frame 5/17/2024 Partial Approval JOHN COLEMAN
Shower Pan 6/4/2024 Approved SALVADOR MARTINEZ
Floor/Roof Diaphrgm/Shear Wall 6/13/2024 Approved OGANES TARAKHCHYAN
Verify Sprinkler Sign Off 6/13/2024 Approved OGANES TARAKHCHYAN
ELECTRICAL-Rough 6/26/2024 Approved OGANES TARAKHCHYAN
Wood Frame 7/5/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 7/10/2024 Partial Approval OGANES TARAKHCHYAN
Green Building Rough 7/10/2024 Approved OGANES TARAKHCHYAN
Interior/Exterior Lathing 7/11/2024 Approved SALVADOR MARTINEZ
Insulation 7/17/2024 Corrections Issued SALVADOR MARTINEZ
Insulation 7/19/2024 Approved SALVADOR MARTINEZ
Drywall Nailing 7/29/2024 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 12/23/2024 SGSOV Not Ready OGANES TARAKHCHYAN
BUILDING-Rough-Frame 12/27/2024 Approved OGANES TARAKHCHYAN
Final 12/27/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Green Building Final 12/27/2024 Approved OGANES TARAKHCHYAN
Service/Power Release 12/27/2024 Approved OGANES TARAKHCHYAN
Final 1/3/2025 OK to Issue CofO OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 1/3/2025 SGSOV Not Required OGANES TARAKHCHYAN
Smoke Detectors 1/3/2025 Approved OGANES TARAKHCHYAN