441-441 1/2 N CROFT AVE 90048

Certificate Information: 441-441 1/2 N CROFT AVE 90048

Application / Permit
23010-20000-03616
Plan Check / Job No.
B23VN12206
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 66'2" X 38' TWO STORY SFD WITH ATTACHED TWO CAR GARAGE AND ATTACHED ACCESSORY DWELLING UNIT AS PER LAMC 12.22.A.33(C) AND (E), NFPA-13D FIRE SPRINKLERS THROUGHOUT, ALL WORK PER ENGINEERING
Permit Issued
Issued on 10/31/2023
Issuing Office
Current Status
CofO Issued on 11/10/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/8/2023 APPLICANT
Assigned to Plan Check Engineer 9/14/2023 RARES BODEA
Corrections Issued 9/19/2023 RARES BODEA
Quality Review Completed 9/22/2023 STEVEN KIM
Building Plans Picked Up 9/22/2023 APPLICANT
Applicant returned to address corrections 10/26/2023 RARES BODEA
Plan Check Approved 10/31/2023 RARES BODEA
Issued 10/31/2023 APPLICANT
CofO in Progress 11/4/2025 JOSH MEISTER
Permit Finaled 11/10/2025 DEROLD HAUFF
CofO Issued 11/10/2025 DEROLD HAUFF
Permit Finaled 11/10/2025 DEROLD HAUFF

Permit Application Clearance Information

Permit Cleared 9/22/2023 JESSICA OPINION
Address approval Cleared 9/29/2023 JESSICA OPINION
Eng Process Fee Ord 176,300 Cleared 10/2/2023 JESSICA OPINION
Sewer availability Cleared 10/2/2023 JESSICA OPINION
Low Impact Development (LID) Cleared 10/3/2023 ERNEST TSE
Roof/Waste drainage to street Cleared 10/4/2023 JESSICA OPINION
Hydrant and Access approval Cleared 10/8/2023 JOHN CONNEALLY
Trees in Parkway Cleared 10/26/2023 ADALBERTO VERA

Contact Information

Contractor Owner-Builder       ,
Engineer Helou,, Dawn Renee; Lic. No.: C52361 22701 ERWIN ST      WOODLAND HILLS, CA 91367

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 3/15/2024 Partial Approval AMIR NAZARIAN
Footing/Foundation/Slab 3/26/2024 Partial Approval AMIR NAZARIAN
METHANE-Barrier 3/26/2024 Not Ready for Inspection AMIR NAZARIAN
METHANE-Subgrade 3/26/2024 Not Ready for Inspection AMIR NAZARIAN
Deputy Drilled-In Anchors 4/3/2024 Conditional Approval AMIR NAZARIAN
Deputy Methane Barrier 4/3/2024 Approved AMIR NAZARIAN
METHANE-Rough 4/3/2024 Conditional Approval AMIR NAZARIAN
Footing/Foundation/Slab 4/5/2024 Approved AMIR NAZARIAN
METHANE-Barrier 4/5/2024 Approved AMIR NAZARIAN
METHANE-Subgrade 4/5/2024 Approved AMIR NAZARIAN
Floor/Roof Diaphrgm/Shear Wall 4/11/2024 Corrections Issued AMIR NAZARIAN
Floor/Roof Diaphrgm/Shear Wall 4/17/2024 Corrections Issued AMIR NAZARIAN
METHANE-Rough 8/16/2024 Corrections Issued AMIR NAZARIAN
Rough-Elec/Plmb/HVAC 8/16/2024 Not Ready for Inspection AMIR NAZARIAN
Structural Steel Frame 8/16/2024 Approved AMIR NAZARIAN
HVAC-Rough 8/23/2024 Corrections Issued AMIR NAZARIAN
METHANE-Final 8/23/2024 Not Ready for Inspection AMIR NAZARIAN
METHANE-Rough 8/23/2024 Approved AMIR NAZARIAN
Rough-Elec/Plmb/HVAC 8/23/2024 Not Ready for Inspection AMIR NAZARIAN
ELECTRICAL-Rough 8/26/2024 Not Ready for Inspection ENRIQUE MIRELES
HVAC-Rough 8/26/2024 Corrections Issued ENRIQUE MIRELES
ELECTRICAL-Rough 8/29/2024 Approved BRENDAN MORELLI
HVAC-Rough 8/29/2024 Conditional Approval BRENDAN MORELLI
Interior/Exterior Lathing 9/12/2024 Approved JOSE MACIAS
Shower Pan 9/12/2024 Approved JOSE MACIAS
ELECTRICAL-Rough 9/23/2024 Approved JOSE MACIAS
Insulation 9/23/2024 Conditional Approval JOSE MACIAS
Interior/Exterior Lathing 9/23/2024 Approved JOSE MACIAS
Drywall Nailing 10/1/2024 Approved JOSE MACIAS
Green Building Rough 10/1/2024 Approved JOSE MACIAS
ELECTRICAL-Final 8/27/2025 Not Ready for Inspection JEFFREY MEAD
Green Building Final 8/27/2025 Not Ready for Inspection JEFFREY MEAD
METHANE-Final 8/27/2025 Not Ready for Inspection JEFFREY MEAD
PLUMBING-Final 8/27/2025 Not Ready for Inspection JEFFREY MEAD
ELECTRICAL-Final 9/12/2025 Not Ready for Inspection JOSE MACIAS
ELECTRICAL-Final 9/25/2025 Approved ENRIQUE MIRELES
HVAC-Final 9/25/2025 Approved ENRIQUE MIRELES
PLUMBING-Final 9/25/2025 Approved ENRIQUE MIRELES
Service/Power Release 10/6/2025 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 11/3/2025 Approved JOSH MEISTER
Final 11/3/2025 OK to Issue CofO JOSH MEISTER
Green Building Final 11/3/2025 Approved JOSH MEISTER
METHANE-Final 11/3/2025 Approved JOSH MEISTER
METHANE-Rough 11/3/2025 Approved JOSH MEISTER
SGSOV-Seismic Gas S/O Valve 11/3/2025 SGSOV Not Required JOSH MEISTER
Smoke Detectors 11/3/2025 Approved JOSH MEISTER
Verify Sprinkler Sign Off 11/3/2025 Approved JOSH MEISTER