15526 W PLUMMER ST SCHOOL-BLDG 91343

Certificate Information: 15526 W PLUMMER ST SCHOOL-BLDG 91343

Application / Permit
23010-20000-03012
Plan Check / Job No.
B23VN09806
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(18) School Building
Work Description
THE PROPOSED NEW SCOPE OF WORK CONSISTS OF THE RENNOVATION OF THE EXISTING HOUSE AND A NEW TWO-STORY, WOOD FRAMED, TYPE VB NON-RATED BUILDING. THIS PUBLIC ELEMENTARY SCHOOL WILL INCLUDE THE FOLLOWING: - 28 CLASSROOMS (INCLUDING 4 SPECIALTY CLASSROOMS) - ADMINISTRATION OFFICE SPACE - MULTIPURPOSE ROOM (MPR) WITH A SERVERY - OUTDOOR PLAY SPACE (FOR GRADES TK-K AND 1-4) - ONSITE PARKING FOR 49 PARKING SPACES (PICK-UP AND DROP-OFF WITHIN THE SITE) - BICYCLE RACKS (SHORT TERM AND LONG TERM)
Permit Issued
Issued on 6/21/2024
Issuing Office
Metro
Current Status
Issued on 6/21/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/27/2023 APPLICANT
Assigned to Plan Check Engineer 8/3/2023 JOE VO
Corrections Issued 8/13/2023 JOE VO
Quality Review Completed 8/15/2023 GARO TELMI
Applicant returned to address corrections 10/3/2023 JOE VO
Applicant returned to address corrections 3/18/2024 JOE VO
Plan Check Approved 6/20/2024 JOE VO
Issued 6/21/2024 APPLICANT
TCO Issued (Expire Date: 06-22-2026) 12/24/2025 JEFFREY DURAN

Permit Application Clearance Information

Address approval Cleared 10/2/2023 MARKOS PEREZ-BRAN
Highway dedication Cleared 10/2/2023 MARKOS PEREZ-BRAN
Permit Cleared 10/2/2023 MARKOS PEREZ-BRAN
Eng Process Fee Ord 176,300 Cleared 10/10/2023 MARKOS PEREZ-BRAN
Sewer availability Cleared 11/30/2023 MARKOS PEREZ-BRAN
DAS Clearance Cleared 2/5/2024 NORLITO MEDRANO
Driveway location Cleared 2/5/2024 SHEILA AHORAIAN
Historic monument Cleared 2/20/2024 LAMBERT GIESSINGER
Green Code Cleared 3/18/2024 MICHAEL MARTINEZ
Fire Marshal Fire Life Safety Cleared 4/29/2024 FIRE DEPARTMENT
"Q" conditions Cleared 5/9/2024 CLAUDE GOODING
"T" removal Cleared 5/9/2024 CLAUDE GOODING
CPC Cleared 5/9/2024 CLAUDE GOODING
Miscellaneous Cleared 5/9/2024 CLAUDE GOODING
Prkng lot landscape/Water mgmt Cleared 5/9/2024 CLAUDE GOODING
Tract Map conditions Cleared 5/9/2024 CLAUDE GOODING
ZA Case Cleared 5/9/2024 CLAUDE GOODING
Low Impact Development (LID) Cleared 5/12/2024 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 5/14/2024 LEE GUILBEAUX
Hydrant and Access approval Cleared 6/6/2024 KURT CORRAL

Contact Information

Architect Berliner,, Richard Paul; Lic. No.: C12823 5976 WASHINGTON BLVD      CULVER CITY, CA 90232
Contractor Oltmans Construction Co; Lic. No.: 86393-B 10005 MISSION MILL RD      WHITTIER, CA 90601
Engineer Chamberlain,, Craig Morgan; Lic. No.: S4588 555 S. FLOWER STREET   SUITE 750    LOS ANGELES, CA 90071
Engineer Lin,, Chi Hsin; Lic. No.: GE2921 123 N VALENCIA ST      ALHAMBRA, CA 91801

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 6/27/2024 Corrections Issued GREGORY POMISH
Deputy Reinf. Concrete 9/26/2024 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 10/2/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/3/2024 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 10/16/2024 Partial Approval DEANDRE HOFFMAN
Reinforced Concrete Frame 10/16/2024 Partial Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 10/22/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/23/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/23/2024 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 10/23/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/28/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/29/2024 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 10/29/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/30/2024 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 11/6/2024 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/7/2024 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 11/8/2024 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 11/12/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/13/2024 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 11/13/2024 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/14/2024 Approved ROBERT DAVIS
Reinforced Concrete Frame 11/14/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/15/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/21/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/21/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/21/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/22/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/22/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/22/2024 Conditional Approval GREGORY POMISH
Structural Steel Frame 11/22/2024 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 12/9/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/9/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/10/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/10/2024 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 12/10/2024 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/19/2024 Conditional Approval GREGORY POMISH
Deputy Wood Construction 12/19/2024 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/19/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/20/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/31/2024 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/31/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 1/2/2025 Conditional Approval GREGORY POMISH
Deputy Wood Construction 1/10/2025 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 1/13/2025 Partial Approval GREGORY POMISH
Green Building Rough 1/13/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 1/13/2025 Not Ready for Inspection GREGORY POMISH
Wood Frame 1/13/2025 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 1/27/2025 Partial Approval GREGORY POMISH
Deputy Wood Construction 2/3/2025 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 2/3/2025 Partial Approval GREGORY POMISH
Green Building Rough 2/3/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 2/3/2025 Not Ready for Inspection GREGORY POMISH
Wood Frame 2/3/2025 Partial Approval GREGORY POMISH
Drywall Nailing 2/19/2025 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 2/19/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/27/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/3/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/10/2025 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/25/2025 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/28/2025 Partial Inspection BRIAN KELLY
Floor/Roof Diaphrgm/Shear Wall 4/2/2025 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 4/15/2025 Partial Approval GREGORY POMISH
Green Building Rough 4/17/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/17/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/17/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/23/2025 Partial Approval GREGORY POMISH
Insulation 4/23/2025 Partial Approval GREGORY POMISH
Drywall Nailing 4/30/2025 Partial Approval GREGORY POMISH
Green Building Rough 5/6/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 5/6/2025 Partial Inspection GREGORY POMISH
Wood Frame 5/6/2025 Partial Approval GREGORY POMISH
Insulation 5/8/2025 Partial Approval GREGORY POMISH
Green Building Rough 5/12/2025 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 5/12/2025 Partial Inspection DANNY RODRIGUEZ
Wood Frame 5/12/2025 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 5/14/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/14/2025 Partial Approval GREGORY POMISH
Insulation 5/19/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/19/2025 Partial Inspection GREGORY POMISH
Drywall Nailing 5/23/2025 Partial Approval GREGORY POMISH
Drywall Nailing 6/10/2025 Not Ready for Inspection DANIEL VARNUM
Interior/Exterior Lathing 6/10/2025 Partial Approval DANIEL VARNUM
Insulation 6/18/2025 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 6/23/2025 Partial Approval GREGORY POMISH
Drywall Nailing 7/2/2025 Approved GREGORY POMISH
Deputy Reinf. Concrete 8/5/2025 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 8/27/2025 Partial Approval GREGORY POMISH
T-Bar Ceiling 9/17/2025 Approved GREGORY POMISH
Final 12/10/2025 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 12/10/2025 Approved GREGORY POMISH
Green Building Final 12/10/2025 Approved GREGORY POMISH
Green Building Rough 12/10/2025 Approved GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 12/10/2025 SGSOV Approved GREGORY POMISH
Smoke Detectors 12/10/2025 Approved GREGORY POMISH
Verify Sprinkler Sign Off 12/10/2025 Approved GREGORY POMISH
Wood Frame 12/10/2025 Approved GREGORY POMISH
Special/Order Compliance 5/27/2026 Approved EDWIN GREGORYONA