Deputy Reinf. Concrete
|
7/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
7/31/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/1/2024
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Masonry
|
8/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
8/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
8/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
8/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/14/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/16/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
8/16/2024
|
No Access for Inspection
|
NICK DANERI
|
|
METHANE-Rough
|
8/16/2024
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
8/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/16/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
8/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/28/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/28/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/28/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
8/28/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/28/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/28/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
8/29/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
8/29/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/9/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
9/9/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/9/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
9/13/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
9/13/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
9/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
10/10/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
10/10/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
10/10/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
10/10/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/16/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/16/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
10/18/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
10/18/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
10/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/18/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
10/23/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
10/23/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
10/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/23/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
10/31/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
10/31/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
10/31/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/31/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
11/6/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
11/6/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/6/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
11/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
11/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
11/8/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
11/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
11/8/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/8/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
11/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
11/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
11/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
11/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
11/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/18/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
11/18/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
11/18/2024
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Rough
|
11/18/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
11/18/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/18/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
11/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
11/22/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/22/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
12/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
12/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
12/5/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
12/5/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/5/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
12/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
12/7/2024
|
Off-Hour Fees Due
|
|
|
METHANE-Rough
|
12/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Rough
|
12/7/2024
|
Off-Hour Fees Due
|
|
|
Reinforced Masonry Frame
|
12/7/2024
|
Off-Hour Fees Due
|
|
|
Reinforced Masonry Frame
|
12/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/7/2024
|
Off-Hour Fees Due
|
|
|
Green Building Rough
|
12/10/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
12/10/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/10/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/12/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
12/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
12/13/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
12/16/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/16/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/16/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
12/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
12/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
12/30/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
12/30/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/30/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
1/7/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
1/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
1/7/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
1/14/2025
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/14/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/14/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/22/2025
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/22/2025
|
Approved
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/22/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/3/2025
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
2/10/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/13/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/13/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/4/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/12/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/14/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/19/2025
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
3/20/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/20/2025
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/20/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
4/4/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/22/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/23/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
4/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/2/2025
|
Partial Approval
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
5/22/2025
|
Approved
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/29/2025
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
6/25/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
7/17/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
8/1/2025
|
Approved
|
JAMES POWERS
|
|
Final
|
8/1/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/1/2025
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Final
|
8/1/2025
|
Approved
|
JAMES POWERS
|
|
METHANE-Barrier
|
8/1/2025
|
Approved
|
JAMES POWERS
|
|
METHANE-Final
|
8/1/2025
|
Approved
|
JAMES POWERS
|
|
METHANE-Rough
|
8/1/2025
|
Approved
|
JAMES POWERS
|
|
METHANE-Subgrade
|
8/1/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/1/2025
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
8/1/2025
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
8/1/2025
|
Approved
|
JAMES POWERS
|
|
Structural Steel Frame
|
8/1/2025
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/1/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
8/5/2025
|
OK for TCO
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/5/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/5/2025
|
Approved
|
JAMES POWERS
|
|
Structural Steel Frame
|
8/5/2025
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/5/2025
|
Approved
|
JAMES POWERS
|
|
Special/Order Compliance
|
1/6/2026
|
Partial Approval
|
JAMES POWERS
|