14065 W HERRON ST 91342

Certificate Information: 14065 W HERRON ST 91342

Application / Permit
23010-20000-02291
Plan Check / Job No.
B23VN07170
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 35'-5" X 21'-2" DETACHED ACCESSORY DWELLING UNIT WITH ATTACHED 4' X 7'5" PORCH PER LAMC 12.22 A.33(c) and (d). WORK DONE PER ENGINEER DESIGN.
Permit Issued
Issued on 10/11/2023
Issuing Office
Valley
Current Status
Issued on 10/11/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/1/2023 APPLICANT
Assigned to Plan Check Engineer 6/8/2023 ARTIN ZARUKIAN
Corrections Issued 6/8/2023 ARTIN ZARUKIAN
Building Plans Picked Up 8/9/2023 APPLICANT
Plan Check Approved 10/6/2023 MADISON ODELL
Issued 10/11/2023 APPLICANT

Permit Application Clearance Information

Hydrant and Access approval Cleared 8/30/2023 KURT CORRAL
Address approval Cleared 9/1/2023 DAGOVERTO GUERRERO
Low Impact Development (LID) Cleared 9/28/2023 MITESH PATEL
Roof/Waste drainage to street Cleared 10/3/2023 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 10/4/2023 LEE GUILBEAUX
Sewer availability Cleared 10/4/2023 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 10/4/2023 LEE GUILBEAUX

Contact Information

Contractor Owner-Builder       ,
Engineer Luisoni,, Antonio Stefano; Lic. No.: S1781 12757 DEON PLACE      GRANADA HILLS, CA 91344

Inspector Information

KEVIN BERBERYAN, (818) 374-9931 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Sewer 6/8/2026   

Inspection Request History

Underground Mechanical 11/8/2023 Corrections Issued KEVIN BERBERYAN
Excavation/Setback/Form/Re-Bar 11/13/2023 Approved KEVIN BERBERYAN
Deputy Wood Construction 11/28/2023 Conditional Approval ROBERT GOLD
Floor/Roof Diaphrgm/Shear Wall 11/29/2023 Approved KEVIN BERBERYAN
BUILDING-Rough-Frame 1/4/2024 Approved KEVIN BERBERYAN
Green Building Rough 1/4/2024 Approved KEVIN BERBERYAN
Rough-Elec/Plmb/HVAC 1/4/2024 Conditional Approval KEVIN BERBERYAN
Verify Sprinkler Sign Off 1/4/2024 Approved KEVIN BERBERYAN
Interior/Exterior Lathing 1/9/2024 Approved KEVIN BERBERYAN
Shower Pan 1/9/2024 Approved KEVIN BERBERYAN
Insulation 1/12/2024 Approved KEVIN BERBERYAN
Drywall Nailing 1/18/2024 Approved JAVIER RAMOS JR
Underground Mechanical 1/31/2024 Approved CHRISTOPHER ROJAS
Final 5/8/2024 Corrections Issued KEVIN BERBERYAN
Footing/Foundation/Slab 5/8/2024 Approved KEVIN BERBERYAN
Green Building Final 5/8/2024 Not Ready for Inspection KEVIN BERBERYAN
SGSOV-Seismic Gas S/O Valve 5/8/2024 SGSOV Not Ready KEVIN BERBERYAN
Service/Power Release 5/8/2024 Not Required KEVIN BERBERYAN
Smoke Detectors 5/8/2024 Approved KEVIN BERBERYAN
Final 5/22/2024 Conditional Approval KEVIN BERBERYAN
Green Building Final 5/22/2024 Approved KEVIN BERBERYAN
SGSOV-Seismic Gas S/O Valve 5/22/2024 SGSOV Approved KEVIN BERBERYAN
Final 4/14/2026 Corrections Issued KEVIN BERBERYAN