4633-4635 N BURNET AVE 91343

Certificate Information: 4633-4635 N BURNET AVE 91343

Application / Permit
23010-20000-01297
Plan Check / Job No.
B23VN03847
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSE TWO STORY SFD WITH ATTACHED 2 CAR GAR AND ATTACHED ACCESSORY DWELLING UNIT (LAMC 12.22 A.33(e)(3))_ BUILDING SHALL BE FULLY SPRINKLER THROUGH OUT WITH NFPA 13D [SEE COMMENTS].
Permit Issued
Issued on 10/5/2023
Issuing Office
Current Status
CofO Corrected on 7/17/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/28/2023 APPLICANT
Assigned to Plan Check Engineer 3/30/2023 DAWN MC NULTY
Corrections Issued 4/7/2023 DAWN MC NULTY
Quality Review Completed 4/13/2023 STEVEN KIM
Building Plans Picked Up 4/18/2023 APPLICANT
Applicant returned to address corrections 9/27/2023 DAWN MC NULTY
Plan Check Approved 10/5/2023 DAWN MC NULTY
Issued 10/5/2023 APPLICANT
CofO in Progress 5/13/2024 THOMAS FINNILA
CofO Issued-Status Void 5/29/2024 RUBEN SALAS
Permit Finaled-Status Void 5/29/2024 RUBEN SALAS
Re-Activate Permit 7/11/2024 RUBEN SALAS
Permit Finaled 7/17/2024 RUBEN SALAS
CofO Corrected 7/17/2024 RUBEN SALAS
Permit Finaled 7/17/2024 RUBEN SALAS

Permit Application Clearance Information

Hydrant and Access approval Cleared 5/20/2023 KURT CORRAL
Trees in Parkway Cleared 7/3/2023 ADALBERTO VERA
Disturb/Remove Protected Trees Cleared 7/6/2023 ADALBERTO VERA
Address approval Cleared 8/14/2023 ROMAN GUTIERREZ
Permit Cleared 8/14/2023 ROMAN GUTIERREZ
Eng Process Fee Ord 176,300 Cleared 8/15/2023 ROMAN GUTIERREZ
Sewer availability Cleared 8/15/2023 ROMAN GUTIERREZ
Low Impact Development (LID) Cleared 8/21/2023 SAMUEL LINN
Roof/Waste drainage to street Cleared 8/23/2023 ROMAN GUTIERREZ
SB8 RUD Cleared 9/12/2023 JULIE LIEU

Contact Information

Contractor Owner-Builder       ,
Engineer Yuzon,, Benigno Sari; Lic. No.: S3454 2511 PEACHWOOD PLACE      WESTLAKE VILLAGE, CA 91361

Inspector Information

RAUL OLAGI, (818) 374-1166 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 10/19/2023 Corrections Issued THOMAS FINNILA
Deputy Reinf. Concrete 10/23/2023 Conditional Approval THOMAS FINNILA
Underground Mechanical 10/24/2023 Partial Approval MISAEL ESPARZA
Excavation/Setback/Form/Re-Bar 10/26/2023 Not Ready for Inspection THOMAS FINNILA
Excavation/Setback/Form/Re-Bar 10/27/2023 Partial Approval THOMAS FINNILA
Footing/Foundation/Slab 10/27/2023 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 11/1/2023 Conditional Approval DAVID MATSON
Footing/Foundation/Slab 11/1/2023 Approved THOMAS FINNILA
Pre-Inspection 11/1/2023 Not Ready for Inspection THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 11/15/2023 Partial Approval THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 11/16/2023 Corrections Issued THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 11/30/2023 Not Ready for Inspection THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 12/5/2023 Conditional Approval THOMAS FINNILA
HVAC-Rough 12/11/2023 Approved THOMAS FINNILA
PLUMBING-Rough 12/11/2023 Conditional Approval THOMAS FINNILA
Deputy Wood Construction 12/14/2023 Conditional Approval DAVID MATSON
ELECTRICAL-Rough 12/14/2023 Not Ready for Inspection MATTHEW NELSON
Floor/Roof Diaphrgm/Shear Wall 12/14/2023 Partial Approval MATTHEW NELSON
ELECTRICAL-Rough 12/15/2023 Conditional Approval THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 12/15/2023 Not Ready for Inspection THOMAS FINNILA
BUILDING-Rough-Frame 1/9/2024 Approved JOHN COLEMAN
Green Building Rough 1/9/2024 Approved JOHN COLEMAN
Interior/Exterior Lathing 1/9/2024 Partial Approval JOHN COLEMAN
Shower Pan 1/9/2024 Approved JOHN COLEMAN
Verify Sprinkler Sign Off 1/9/2024 Approved JOHN COLEMAN
Insulation 1/16/2024 Approved THOMAS FINNILA
Interior/Exterior Lathing 1/17/2024 Partial Inspection CRAIG DAVIS
Drywall Nailing 1/22/2024 Approved RYAN SALAZAR
Insulation 1/22/2024 Conditional Approval RYAN SALAZAR
ELECTRICAL-Final 5/6/2024 Corrections Issued THOMAS FINNILA
Final 5/6/2024 Corrections Issued THOMAS FINNILA
Green Building Final 5/6/2024 Approved THOMAS FINNILA
HVAC-Final 5/6/2024 Corrections Issued THOMAS FINNILA
PLUMBING-Final 5/6/2024 Approved THOMAS FINNILA
ELECTRICAL-Final 5/8/2024 Approved THOMAS FINNILA
HVAC-Final 5/8/2024 Conditional Approval THOMAS FINNILA
PLUMBING-Final 5/8/2024 Approved THOMAS FINNILA
Final 5/10/2024 OK to Issue CofO THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 5/10/2024 SGSOV Approved THOMAS FINNILA
Service/Power Release 5/10/2024 Approved THOMAS FINNILA
Smoke Detectors 5/10/2024 Approved THOMAS FINNILA