2620 S MONMOUTH AVE 1-10 90007

Certificate Information: 2620 S MONMOUTH AVE 1-10 90007

Application / Permit
23010-20000-01193
Plan Check / Job No.
B23VN03603
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 10 UNIT APARTMENT (3-STORY) WITH PARKING GARAGE, STORAGE, RECROOM AND GYMNASIUM ABOVE A SINGLE LEVEL BASEMENT
Permit Issued
Issued on 9/11/2024
Issuing Office
Metro
Current Status
Issued on 9/11/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/23/2023 APPLICANT
Assigned to Plan Check Engineer 4/6/2023 CARLOS MONTES
Corrections Issued 4/13/2023 CARLOS MONTES
Quality Review Completed 4/13/2023 GARO TELMI
Applicant returned to address corrections 5/4/2023 CARLOS MONTES
Applicant returned to address corrections 12/14/2023 CARLOS MONTES
Plan Check Approved 5/2/2024 CARLOS MONTES
Issued 9/11/2024 APPLICANT

Permit Application Clearance Information

Green Code Cleared 8/27/2023 Pinank Patel
DAS Clearance Cleared 8/31/2023 Pinank Patel
Hydrant and Access approval Cleared 8/31/2023 KURT CORRAL
Address approval Cleared 9/7/2023 JEANIE LAM
Fire Marshal Fire Life Safety Cleared 9/19/2023 FIRE DEPARTMENT
Eng Process Fee Ord 176,300 Cleared 11/8/2023 JEANIE LAM
Building over 36-ft Cleared 11/9/2023 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/9/2023 CALOSHA APPROVED
Low Impact Development (LID) Cleared 12/21/2023 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 12/30/2023 TERRY PHAN
Sewer availability Cleared 1/23/2024 JEANIE LAM
Specific Plan Cleared 2/15/2024 DANIEL MATA
ZA Case Cleared 3/6/2024 DANIEL CORONADO
ZA Case Cleared 3/6/2024 DANIEL CORONADO
ZA Case Cleared 3/6/2024 DANIEL CORONADO
Frnt yard landscape/Water mgmt Cleared 3/22/2024 DANIEL CORONADO
Opn space landscape/Water mgmt Cleared 3/22/2024 DANIEL CORONADO
ZA Case Cleared 3/22/2024 DANIEL CORONADO
Highway dedication Cleared 4/2/2024 CHRISTINA BRACO
Work Adjacent to Public Way Cleared 4/26/2024 LARRY LEE

Contact Information

Architect Tomalevski,, Bogdan Vladimirov; Lic. No.: C34688 4310 JASMINE AVENUE      CULVER CITY, CA 90232
Contractor Vanguard Construction Group Utd Inc; Lic. No.: 1063173-B       ,
Engineer Barr,, Joseph Daniel; Lic. No.: C70708 1185 HERITAGE FARM RD      HICKORY, NC 28601
Engineer Pirbadian,, Amir; Lic. No.: NA72413       ,
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065
Geologist Miller,, Jonathan Steven; Lic. No.: EG2391 24736 CALVERT STREET      WOODLAND HILLS, CA 91367

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Insulation 7/24/2026    Time Frame: 10-12
Deputy Reinf. Concrete 7/24/2026   
Drywall Nailing 7/27/2026   
Insulation 7/27/2026   

Inspection Request History

Pre-Inspection 10/25/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/31/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/31/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/1/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 11/15/2024 Conditional Approval LARRY ARNICK
METHANE-Barrier 11/15/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 11/15/2024 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 11/22/2024 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 11/25/2024 Partial Approval JAMES POWERS
METHANE-Subgrade 11/25/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 11/25/2024 Partial Approval JAMES POWERS
Deputy Other (see comments) 11/27/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/27/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 11/27/2024 Partial Approval JAMES POWERS
Deputy Methane Barrier 1/2/2025 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 1/7/2025 Partial Approval LARRY ARNICK
METHANE-Barrier 1/17/2025 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 1/17/2025 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 1/29/2025 Partial Approval JAMES POWERS
METHANE-Barrier 1/29/2025 Partial Approval JAMES POWERS
Deputy Methane Barrier 2/4/2025 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 2/7/2025 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 3/13/2025 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/14/2025 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/1/2025 Partial Approval JAMES POWERS
Deputy Shotcrete 4/1/2025 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/2/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/3/2025 Partial Approval JAMES POWERS
Reinforced Masonry Frame 5/2/2025 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 5/5/2025 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/14/2025 Partial Inspection JEFFREY FULTON
METHANE-Barrier 5/14/2025 Not Ready for Inspection JEFFREY FULTON
METHANE-Subgrade 5/14/2025 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 6/16/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/17/2025 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/29/2025 Partial Approval ALFREDO LOPEZ
Floor/Roof Diaphrgm/Shear Wall 8/29/2025 Partial Approval JAMES POWERS
Pre-Inspection 10/10/2025 Partial Inspection JEROME BLACKWOOD
Insulation 10/31/2025 Not Ready for Inspection JAMES POWERS
Green Building Rough 11/25/2025 Approved JAMES POWERS
METHANE-Rough 11/25/2025 Approved JAMES POWERS
Verify Sprinkler Sign Off 11/25/2025 Not Ready for Inspection JAMES POWERS
Wood Frame 11/25/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/1/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/3/2025 Not Ready for Inspection JAMES POWERS
Wood Frame 12/3/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/18/2025 Partial Approval JAMES POWERS
Deputy Wood Construction 12/23/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/21/2026 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/10/2026 Not Ready for Inspection ALFREDO LOPEZ
Wood Frame 2/10/2026 Partial Approval ALFREDO LOPEZ
Wood Frame 2/12/2026 Partial Approval JAMES POWERS
Insulation 3/6/2026 Partial Approval JAMES POWERS
Interior/Exterior Lathing 3/13/2026 Partial Approval JAMES POWERS
Drywall Nailing 3/16/2026 Partial Approval JAMES POWERS
Drywall Nailing 3/17/2026 Partial Approval JAMES POWERS
Drywall Nailing 3/19/2026 Partial Approval JAMES POWERS
Insulation 3/20/2026 Not Ready for Inspection JAMES POWERS
Drywall Nailing 3/24/2026 Partial Approval JAMES POWERS
Drywall Nailing 3/27/2026 Partial Approval JAMES POWERS
Drywall Nailing 4/3/2026 Partial Approval JAMES POWERS
Interior/Exterior Lathing 4/7/2026 Approved JAMES POWERS
Structural Steel Frame 4/13/2026 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 7/6/2026 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/9/2026 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 7/10/2026 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 7/10/2026 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 7/10/2026 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 7/10/2026 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 7/14/2026 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/16/2026 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/21/2026 Partial Approval JAMES POWERS
Drywall Nailing 7/23/2026 Partial Approval JAMES POWERS