622 N ALDAMA TER 90042

Certificate Information: 622 N ALDAMA TER 90042

Application / Permit
23010-10000-04934
Plan Check / Job No.
B23LA23246
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Recreation Room
Work Description
CONVERT EXISTING 13'-0" X 17'-0" DETACHED GARAGE INTO RECREAITON ROOM - PER ENGINEER
Permit Issued
Issued on 8/3/2024
Issuing Office
Current Status
CofO Issued on 3/2/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/11/2023 APPLICANT
Assigned to Plan Check Engineer 12/15/2023 DANIEL ABRAMYAN
Corrections Issued 12/18/2023 DANIEL ABRAMYAN
Applicant returned to address corrections 6/7/2024 DANIEL ABRAMYAN
Plan Check Approved 7/25/2024 DANIEL ABRAMYAN
Issued 8/3/2024 APPLICANT
CofO in Progress 2/26/2025 LILIANA PORTILLO
Permit Finaled 3/2/2025 DEROLD HAUFF
CofO Issued 3/2/2025 DEROLD HAUFF
Permit Finaled 3/2/2025 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 1/2/2024 AMBER CAMPBELL
Eng Process Fee Ord 176,300 Cleared 1/8/2024 AMBER CAMPBELL
Grading Pre-Inspection Cleared 1/8/2024 SERGIO VALENZUELA
HPOZ Cleared 4/16/2024 MELISSA JONES
Hist. Property Cntrct Mgr Appr Cleared 4/16/2024 MELISSA JONES

Contact Information

Contractor Dhs Ventures Inc; Lic. No.: 1047699-B       ,
Contractor La Ccs; Lic. No.: 1047699-B       ,
Engineer Vartanian,, Albert; Lic. No.: C39989 1250 W GLENOAKS BLVD E355      GLENDALE, CA 91201

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/6/2024 Partial Inspection THOMAS LOGRASSO
Pre-Inspection 8/14/2024 Partial Inspection THOMAS LOGRASSO
Pre-Inspection 9/24/2024 Partial Inspection THOMAS LOGRASSO
Sewer 10/9/2024 Partial Approval THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 11/12/2024 Not Ready for Inspection THOMAS LOGRASSO
Footing/Foundation/Slab 11/15/2024 Partial Approval THOMAS LOGRASSO
Sewer 11/15/2024 Approved THOMAS LOGRASSO
Footing/Foundation/Slab 11/25/2024 Approved THOMAS LOGRASSO
BUILDING-Rough-Frame 12/6/2024 Not Ready for Inspection THOMAS LOGRASSO
Rough-Elec/Plmb/HVAC 12/6/2024 Corrections Issued THOMAS LOGRASSO
BUILDING-Rough-Frame 12/20/2024 Approved THOMAS LOGRASSO
PLUMBING-Rough 12/20/2024 Approved THOMAS LOGRASSO
Floor/Roof Diaphrgm/Shear Wall 1/7/2025 Corrections Issued THOMAS LOGRASSO
Insulation 1/7/2025 Conditional Approval THOMAS LOGRASSO
Drywall Nailing 1/22/2025 Approved THOMAS LOGRASSO
Final 2/21/2025 Corrections Issued THOMAS LOGRASSO
Green Building Final 2/21/2025 Approved THOMAS LOGRASSO
SGSOV-Seismic Gas S/O Valve 2/21/2025 SGSOV Not Required THOMAS LOGRASSO
Smoke Detectors 2/21/2025 Approved THOMAS LOGRASSO
ELECTRICAL-Final 2/25/2025 Approved LILIANA PORTILLO
Final 2/25/2025 OK to Issue CofO LILIANA PORTILLO
HVAC-Final 2/25/2025 Approved LILIANA PORTILLO
PLUMBING-Final 2/25/2025 Approved LILIANA PORTILLO