2625 S CULLEN ST 1-70 90034

Certificate Information: 2625 S CULLEN ST 1-70 90034

Application / Permit
23010-10000-04745
Plan Check / Job No.
B23LA22280
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 6 STORY 70 UNITS (4 VL, 51 LI, 14 MI, AND ONE MANAGERS UNIT) AFFORDABLE HOUSING APARTMENT TO INCLUDE 5 STORY TYPE IIIA APARTMENT OVER 1 STORY TYPE IA PARKING, PER 12.22.A.25 / AB 2345 INCENTIVES CalOSHA permit must be obtained before construction is commenced
Permit Issued
Issued on 12/31/2025
Issuing Office
Current Status
Issued on 12/31/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 11/27/2023 APPLICANT
Assigned to Plan Check Engineer 11/30/2023 MANUEL MONTUFAR
Assigned to Zoning Architect 11/30/2023 NEVRIK NAVASARTIAN
Corrections Issued 12/8/2023 MANUEL MONTUFAR
Quality Review Completed 12/8/2023 EUGENE BARBEAU
Applicant returned to address corrections 8/20/2024 MANUEL MONTUFAR
Applicant returned to address corrections 6/6/2025 MANUEL MONTUFAR
Plan Check Approved 8/21/2025 MANUEL MONTUFAR
Issued 12/31/2025 APPLICANT

Permit Application Clearance Information

Construction near power lines Cleared 1/17/2024 RIDWAN HARDY
Address approval Cleared 5/21/2024 TREVOR QUAN
Eng Process Fee Ord 176,300 Cleared 5/22/2024 TREVOR QUAN
Permit Cleared 5/29/2024 TREVOR QUAN
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
Miscellaneous Cleared 6/11/2024 DANIEL CORONADO
ZI Cleared 6/11/2024 DANIEL CORONADO
ZI Cleared 6/11/2024 DANIEL CORONADO
Trees in Parkway Cleared 6/17/2024 ADALBERTO VERA
DAS Clearance Cleared 7/15/2024 MANUEL MONTUFAR
Hydrant and Access approval Cleared 7/15/2024 LAVEON RIDER
Fire Marshal Fire Life Safety Cleared 7/30/2024 FIRE DEPARTMENT
Low Impact Development (LID) Cleared 10/4/2024 AMMAR ELTAWIL
Green Code Cleared 10/8/2024 MICHAEL AYERS
Roof/Waste drainage to street Cleared 10/16/2024 STEVE MELGAR
Sewer availability Cleared 1/18/2025 STEVE MELGAR
Density Bonus 12.22.A.31 Cleared 5/22/2025 SAMANTHA RIVERA
SB8 RUD Cleared 5/22/2025 SAMANTHA RIVERA
Frnt yard landscape/Water mgmt Cleared 7/15/2025 DANIEL CORONADO
Miscellaneous Cleared 7/15/2025 DANIEL CORONADO
Opn space landscape/Water mgmt Cleared 7/15/2025 DANIEL CORONADO
Work Adjacent to Public Way Cleared 7/17/2025 LARRY LEE
Zoning Plan Check Cleared 8/11/2025 NEVRIK NAVASARTIAN

Contact Information

Architect Techentin,, Warren A; Lic. No.: C28100 1405 AFTON ST      PASADENA, CA 91103
Contractor Lumar Corporation; Lic. No.: 1027838-B 11420 SANTA MONICA BLVD   #252233    LOS ANGELES, CA 90025
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 347 ROBERTSON BLVD      BEVERLY HILLS, CA 90211
Engineer Dejban,, Masoud; Lic. No.: S2521 17200 VENTURA BLVD STE 213A      ENCINO, CA 91316
Engineer Irvine,, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD STE 1      PASADENA, CA 91107
Landscape Architect Straabe,, Nickolas Andrew; Lic. No.: LA6578 2344 E LAKESIDE AVE      ORANGE, CA 92867

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Deputy Wood Construction 8/7/2026   
Floor/Roof Diaphrgm/Shear Wall 8/7/2026   

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/15/2026 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 4/21/2026 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 4/23/2026 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 4/28/2026 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 4/29/2026 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 4/30/2026 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 5/1/2026 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/6/2026 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 5/6/2026 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/8/2026 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/12/2026 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/13/2026 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 5/13/2026 Partial Approval PAUL DAVIDSON
Deputy Shotcrete 5/14/2026 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 5/14/2026 Partial Inspection FARHAD DADBIN
Deputy Shotcrete 5/15/2026 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 5/26/2026 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/28/2026 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 6/2/2026 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 6/15/2026 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 6/15/2026 Not Ready for Inspection DANIEL VARNUM
Deputy Reinf. Concrete 6/24/2026 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 6/25/2026 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 6/29/2026 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/14/2026 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 7/17/2026 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/17/2026 Partial Approval PAUL DAVIDSON
Drywall Nailing 7/21/2026 Corrections Issued PAUL DAVIDSON
Deputy Wood Construction 7/24/2026 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/24/2026 Partial Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/28/2026 Partial Approval DANIEL VARNUM
Drywall Nailing 7/30/2026 Partial Approval DANIEL VARNUM