2625 S CULLEN ST 1-70 90034
Certificate Information: 2625 S CULLEN ST 1-70 90034
- Application / Permit
- 23010-10000-04745
- Plan Check / Job No.
- B23LA22280
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- NEW 6 STORY 70 UNITS (4 VL, 51 LI, 14 MI, AND ONE MANAGERS UNIT) AFFORDABLE HOUSING APARTMENT TO INCLUDE 5 STORY TYPE IIIA APARTMENT OVER 1 STORY TYPE IA PARKING, PER 12.22.A.25 / AB 2345 INCENTIVES CalOSHA permit must be obtained before construction is commenced
- Permit Issued
- Issued on 12/31/2025
- Issuing Office
- Current Status
- Issued on 12/31/2025
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 11/27/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 11/30/2023 | MANUEL MONTUFAR |
| Assigned to Zoning Architect | 11/30/2023 | NEVRIK NAVASARTIAN |
| Corrections Issued | 12/8/2023 | MANUEL MONTUFAR |
| Quality Review Completed | 12/8/2023 | EUGENE BARBEAU |
| Applicant returned to address corrections | 8/20/2024 | MANUEL MONTUFAR |
| Applicant returned to address corrections | 6/6/2025 | MANUEL MONTUFAR |
| Plan Check Approved | 8/21/2025 | MANUEL MONTUFAR |
| Issued | 12/31/2025 | APPLICANT |
Permit Application Clearance Information
| Construction near power lines | Cleared | 1/17/2024 | RIDWAN HARDY |
| Address approval | Cleared | 5/21/2024 | TREVOR QUAN |
| Eng Process Fee Ord 176,300 | Cleared | 5/22/2024 | TREVOR QUAN |
| Permit | Cleared | 5/29/2024 | TREVOR QUAN |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| Miscellaneous | Cleared | 6/11/2024 | DANIEL CORONADO |
| ZI | Cleared | 6/11/2024 | DANIEL CORONADO |
| ZI | Cleared | 6/11/2024 | DANIEL CORONADO |
| Trees in Parkway | Cleared | 6/17/2024 | ADALBERTO VERA |
| DAS Clearance | Cleared | 7/15/2024 | MANUEL MONTUFAR |
| Hydrant and Access approval | Cleared | 7/15/2024 | LAVEON RIDER |
| Fire Marshal Fire Life Safety | Cleared | 7/30/2024 | FIRE DEPARTMENT |
| Low Impact Development (LID) | Cleared | 10/4/2024 | AMMAR ELTAWIL |
| Green Code | Cleared | 10/8/2024 | MICHAEL AYERS |
| Roof/Waste drainage to street | Cleared | 10/16/2024 | STEVE MELGAR |
| Sewer availability | Cleared | 1/18/2025 | STEVE MELGAR |
| Density Bonus 12.22.A.31 | Cleared | 5/22/2025 | SAMANTHA RIVERA |
| SB8 RUD | Cleared | 5/22/2025 | SAMANTHA RIVERA |
| Frnt yard landscape/Water mgmt | Cleared | 7/15/2025 | DANIEL CORONADO |
| Miscellaneous | Cleared | 7/15/2025 | DANIEL CORONADO |
| Opn space landscape/Water mgmt | Cleared | 7/15/2025 | DANIEL CORONADO |
| Work Adjacent to Public Way | Cleared | 7/17/2025 | LARRY LEE |
| Zoning Plan Check | Cleared | 8/11/2025 | NEVRIK NAVASARTIAN |
Contact Information
| Architect | Techentin,, Warren A; Lic. No.: C28100 | 1405 AFTON ST PASADENA, CA 91103 |
| Contractor | Lumar Corporation; Lic. No.: 1027838-B | 11420 SANTA MONICA BLVD #252233 LOS ANGELES, CA 90025 |
| Engineer | De, Leon, Cynthia Aguilar; Lic. No.: C31604 | 347 ROBERTSON BLVD BEVERLY HILLS, CA 90211 |
| Engineer | Dejban,, Masoud; Lic. No.: S2521 | 17200 VENTURA BLVD STE 213A ENCINO, CA 91316 |
| Engineer | Irvine,, Jon Alan; Lic. No.: GE2891 | 145 N SIERRA MADRE BLVD STE 1 PASADENA, CA 91107 |
| Landscape Architect | Straabe,, Nickolas Andrew; Lic. No.: LA6578 | 2344 E LAKESIDE AVE ORANGE, CA 92867 |
Inspector Information
| PAUL DAVIDSON, (310) 914-3914 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| Deputy Wood Construction | 8/7/2026 |
| Floor/Roof Diaphrgm/Shear Wall | 8/7/2026 |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 4/15/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 4/21/2026 | Conditional Approval | PAUL DAVIDSON |
| Excavation/Setback/Form/Re-Bar | 4/23/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 4/28/2026 | Conditional Approval | PAUL DAVIDSON |
| Excavation/Setback/Form/Re-Bar | 4/29/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 4/30/2026 | Conditional Approval | PAUL DAVIDSON |
| Deputy Shotcrete | 5/1/2026 | Conditional Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 5/6/2026 | Conditional Approval | PAUL DAVIDSON |
| Excavation/Setback/Form/Re-Bar | 5/6/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 5/8/2026 | Conditional Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 5/12/2026 | Conditional Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 5/13/2026 | Conditional Approval | PAUL DAVIDSON |
| Excavation/Setback/Form/Re-Bar | 5/13/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Shotcrete | 5/14/2026 | Conditional Approval | PAUL DAVIDSON |
| Special/Order Compliance | 5/14/2026 | Partial Inspection | FARHAD DADBIN |
| Deputy Shotcrete | 5/15/2026 | Conditional Approval | DANIEL VARNUM |
| Excavation/Setback/Form/Re-Bar | 5/26/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 5/28/2026 | Conditional Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 6/2/2026 | Conditional Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 6/15/2026 | Conditional Approval | DANIEL VARNUM |
| Excavation/Setback/Form/Re-Bar | 6/15/2026 | Not Ready for Inspection | DANIEL VARNUM |
| Deputy Reinf. Concrete | 6/24/2026 | Conditional Approval | PAUL DAVIDSON |
| Excavation/Setback/Form/Re-Bar | 6/25/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 6/29/2026 | Conditional Approval | PAUL DAVIDSON |
| Floor/Roof Diaphrgm/Shear Wall | 7/14/2026 | Partial Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 7/17/2026 | Conditional Approval | PAUL DAVIDSON |
| Floor/Roof Diaphrgm/Shear Wall | 7/17/2026 | Partial Approval | PAUL DAVIDSON |
| Drywall Nailing | 7/21/2026 | Corrections Issued | PAUL DAVIDSON |
| Deputy Wood Construction | 7/24/2026 | Conditional Approval | PAUL DAVIDSON |
| Floor/Roof Diaphrgm/Shear Wall | 7/24/2026 | Partial Approval | PAUL DAVIDSON |
| Floor/Roof Diaphrgm/Shear Wall | 7/28/2026 | Partial Approval | DANIEL VARNUM |
| Drywall Nailing | 7/30/2026 | Partial Approval | DANIEL VARNUM |