Piling/Pier/Caisson
|
12/20/2024
|
Partial Approval
|
NICK LAROCCA
|
|
Pre-Inspection
|
12/20/2024
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
12/27/2024
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
12/27/2024
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
12/30/2024
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/2/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/6/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/7/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/8/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/9/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/13/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/13/2025
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
1/14/2025
|
Approved
|
NICK LAROCCA
|
|
Light Gage Steel Frame
|
1/14/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
1/15/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/16/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
1/17/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
1/24/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
2/10/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
2/11/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
2/12/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
2/24/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
2/25/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
2/26/2025
|
Conditional Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
2/26/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
2/27/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
2/28/2025
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
2/28/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
2/28/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Grading
|
3/4/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/4/2025
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
3/4/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
3/4/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Grading
|
3/5/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/5/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/6/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/6/2025
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
3/6/2025
|
Not Ready for Inspection
|
ALAN NOVAK
|
|
Reinforced Concrete Frame
|
3/6/2025
|
Not Ready for Inspection
|
ALAN NOVAK
|
|
Deputy Grading
|
3/7/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/7/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/10/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/10/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/11/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/11/2025
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
3/11/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Reinforced Concrete Frame
|
3/11/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Grading
|
3/12/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/12/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
3/12/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Grading
|
3/13/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/13/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/14/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/14/2025
|
Approved
|
NICK LAROCCA
|
|
Pre-Inspection
|
3/14/2025
|
Approved
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
3/17/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Reinforced Concrete Frame
|
3/17/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
3/19/2025
|
Approved
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
3/20/2025
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
3/21/2025
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/24/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/24/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/24/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/25/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/25/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
3/25/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
3/25/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Grading
|
3/26/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/26/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/27/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/27/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
3/28/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/28/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/1/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/2/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
4/2/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Grading Pre-Inspection
|
4/2/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/4/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/7/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
4/24/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/24/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
4/24/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Grading
|
4/25/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/25/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/30/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/1/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/1/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
5/1/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/2/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/5/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
5/5/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/6/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/7/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/8/2025
|
Approved
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
5/8/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/9/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/13/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/14/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/15/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/20/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/20/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/21/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/21/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/21/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/22/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/22/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/22/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/23/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/23/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/23/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/27/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/27/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/27/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/28/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/28/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/28/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/29/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/29/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
5/30/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/30/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
6/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
6/4/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/4/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/4/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
6/5/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/5/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/5/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
6/5/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
6/5/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
6/6/2025
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Grading
|
6/6/2025
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
6/6/2025
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Drilled-In Anchors
|
6/9/2025
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Grading
|
6/9/2025
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Reinf. Concrete
|
6/9/2025
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Grading
|
6/10/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/10/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/11/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/11/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/12/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/12/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/13/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/13/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/17/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/17/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/18/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/18/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/20/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/20/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/23/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/24/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/24/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/25/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/25/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/26/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/26/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
6/27/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/27/2025
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
7/1/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
7/1/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/16/2025
|
Conditional Approval
|
RICARDO ROBLES
|
|
Reinforced Concrete Frame
|
7/16/2025
|
Partial Approval
|
RICARDO ROBLES
|
|
Deputy Grading
|
7/17/2025
|
Approved
|
NICK LAROCCA
|
|
Structural Steel Frame
|
8/13/2025
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
9/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
9/9/2025
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Drilled-In Anchors
|
9/30/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
9/30/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
9/30/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
10/1/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
10/1/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
10/1/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
10/2/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
10/2/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
10/2/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
10/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
10/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
10/3/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
10/6/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Grading
|
10/6/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
10/6/2025
|
Approved
|
NICK LAROCCA
|
|
Pre-Inspection
|
1/12/2026
|
Approved
|
NICK LAROCCA
|
|
Final
|
1/15/2026
|
Partial Approval
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
1/15/2026
|
Approved
|
NICK LAROCCA
|
|
SGSOV-Seismic Gas S/O Valve
|
1/15/2026
|
SGSOV Approved
|
NICK LAROCCA
|
|
Smoke Detectors
|
1/15/2026
|
Approved
|
NICK LAROCCA
|
|
Verify Sprinkler Sign Off
|
1/15/2026
|
Approved
|
NICK LAROCCA
|
|
Wood Frame
|
1/15/2026
|
Approved
|
NICK LAROCCA
|
|
Final
|
3/17/2026
|
Partial Inspection
|
DANIEL VARNUM
|