20401 W VENTURA BLVD 91364

Certificate Information: 20401 W VENTURA BLVD 91364

Application / Permit
23010-10000-04176
Plan Check / Job No.
B23LA19593
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(22) Storage Building
Work Description
PROPOSED 3 STORY TYPE II-B STORAGE / RETAIL BUILDING WITH 2 LEVELS OF BASEMENT. 1 OF 5
Permit Issued
Issued on 4/16/2025
Issuing Office
Metro
Current Status
Issued on 4/16/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/19/2023 APPLICANT
Assigned to Zoning Architect 10/26/2023 JASON BRAVO
Assigned to Plan Check Engineer 11/2/2023 JOE VO
Corrections Issued 11/14/2023 MICHAEL LOPEZ
Quality Review Completed 11/30/2023 KEN GILL
Building Plans Picked Up 12/5/2023 APPLICANT
Applicant returned to address corrections 1/26/2024 MICHAEL LOPEZ
Applicant returned to address corrections 2/9/2024 MICHAEL LOPEZ
Applicant returned to address corrections 2/27/2024 MICHAEL LOPEZ
Applicant returned to address corrections 9/18/2024 MICHAEL LOPEZ
Plan Check Approved 4/10/2025 JOE VO
Issued 4/16/2025 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/2/2024 CARLOS AGUILERA
Highway dedication Cleared 6/8/2024 CARLOS AGUILERA
Sewer availability Cleared 6/12/2024 CARLOS RAMIREZ
Green Code Cleared 7/23/2024 MICHAEL LOPEZ
Driveway location Cleared 7/29/2024 SHEILA AHORAIAN
Specific Plan Cleared 7/29/2024 SHEILA AHORAIAN
Disturb/Remove Protected Trees Cleared 8/15/2024 MIGUEL ORNELAS
Trees in Parkway Cleared 8/15/2024 MIGUEL ORNELAS
Miscellaneous Cleared 9/13/2024 DANIEL CORONADO
Miscellaneous Cleared 9/13/2024 DANIEL CORONADO
Miscellaneous Cleared 9/13/2024 DANIEL CORONADO
Miscellaneous Cleared 9/13/2024 DANIEL CORONADO
Miscellaneous Cleared 9/13/2024 DANIEL CORONADO
Miscellaneous Cleared 9/13/2024 DANIEL CORONADO
GPI Written Notices Cleared 9/18/2024 MICHAEL LOPEZ
Grading Pre-Inspection Cleared 9/18/2024 ROBERT PINA
Work Adjacent to Public Way Cleared 10/4/2024 LEE GUILBEAUX
Low Impact Development (LID) Cleared 10/23/2024 LUIS LUVANO
Roof/Waste drainage to street Cleared 10/25/2024 RYAN CASTRO
Building over 36-ft Cleared 11/13/2024 CALOSHA APPROVED
DAS Clearance Cleared 12/5/2024 ELIZABETH TOMS
Hydrant and Access approval Cleared 1/31/2025 JOHN CONNEALLY
Permit Cleared 2/28/2025 RYAN CASTRO
"D" conditions Cleared 3/10/2025 DANIEL CORONADO
Frnt yard landscape/Water mgmt Cleared 3/10/2025 DANIEL CORONADO
Prkng lot landscape/Water mgmt Cleared 3/10/2025 DANIEL CORONADO
Specific Plan Cleared 3/10/2025 DANIEL CORONADO
Miscellaneous Cleared 3/11/2025 DANIEL CORONADO
Zoning Plan Check Cleared 3/27/2025 MICHAEL LOPEZ

Contact Information

Architect Michalek,, Christopher; Lic. No.: C38780 444 N MICHIGAN AVE #1850      CHICAGO, IL 60611
Contractor Hbi Commercial Construction Inc; Lic. No.: 1104671-B 4921 BIRCH STREET SUITE 1      NEWPORT BEACH, CA 92660
Engineer Johnson,, Steven; Lic. No.: C83319 760 MILL ST      SILVERTON, OR 97831
Engineer Wang,, Hongyu; Lic. No.: C72679 8887 W FALMINGO RD STE 101      LAS VEGAS, NV 89147
Engineer Zadoorian,, Christopher John; Lic. No.: GE2493 1431 MONTGOMEERY ST      TUSTIN, CA 92782
Geologist Wilkins,, Shaun Hunter; Lic. No.: EG2665 1716 N GLENVIEW AVE      ANAHEIM HILLS, CA 92807

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Excavation/Setback/Form/Re-Bar 7/23/2026    Time Frame: 10-12
Deputy Drilled-In Anchors 7/23/2026   

Inspection Request History

Special/Order Compliance 5/20/2025 Partial Inspection ROBERT DAVIS
Deputy Steel/Welding 7/18/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/11/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/17/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/18/2025 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 11/19/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/24/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/4/2025 Partial Approval ROBERT DAVIS
Deputy Shotcrete 12/12/2025 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 12/18/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 1/9/2026 Approved ROBERT DAVIS
Footing/Foundation/Slab 1/9/2026 Partial Approval ROBERT DAVIS
Deputy Shotcrete 1/14/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/15/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/16/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/20/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/26/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/27/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/28/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/29/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/30/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/30/2026 Partial Inspection ROBERT DAVIS
Deputy Shotcrete 2/2/2026 Approved ROBERT DAVIS
Deputy Shotcrete 2/3/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/3/2026 Partial Approval ROBERT DAVIS
Deputy Shotcrete 2/5/2026 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/5/2026 Partial Inspection ROBERT DAVIS
Deputy Shotcrete 2/6/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/9/2026 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 2/10/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/10/2026 Partial Approval ROBERT DAVIS
Deputy Shotcrete 2/11/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/12/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/12/2026 Partial Approval ROBERT DAVIS
Deputy Shotcrete 2/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/25/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/27/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/3/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/3/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/4/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/4/2026 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 3/4/2026 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/5/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 3/5/2026 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 3/6/2026 Conditional Approval BRIAN KELLY
Deputy Reinf. Masonry 3/6/2026 Conditional Approval BRIAN KELLY
Deputy Reinf. Masonry 3/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/11/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/17/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 3/17/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/20/2026 Approved ROBERT DAVIS
Footing/Foundation/Slab 3/20/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/31/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 4/1/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/9/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 4/9/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/16/2026 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 4/16/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 4/17/2026 Conditional Approval JOHN KITCKO
Structural Steel Frame 4/21/2026 Partial Approval ROBERT DAVIS
Wall Anchors 4/21/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/23/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/23/2026 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 4/24/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/29/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/29/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/1/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/1/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/4/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/5/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/6/2026 Partial Approval ROBERT DAVIS
Structural Steel Frame 5/6/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/8/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 5/8/2026 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 5/20/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/20/2026 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 5/26/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/27/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/3/2026 Partial Approval ROBERT DAVIS
Structural Steel Frame 6/3/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/4/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/5/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 6/5/2026 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 6/15/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/16/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 6/23/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 6/23/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/24/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/24/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/25/2026 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 6/25/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/1/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/1/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/2/2026 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/6/2026 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 7/6/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/9/2026 Partial Approval ROBERT DAVIS
Structural Steel Frame 7/9/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 7/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/13/2026 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/13/2026 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/16/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/16/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/21/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 7/21/2026 Partial Approval BRIAN KELLY