848 N FULLER AVE 1-25 90046
Certificate Information: 848 N FULLER AVE 1-25 90046
- Application / Permit
- 23010-10000-03004
- Plan Check / Job No.
- B23LA13496
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- NEW 4 STORY 25 UNITS (3 VL + 2 LOW = 20%) AFFORDABLE HOUSING APARTMENT TO INCLUDE 4 STORY TYPE VA APARTMENT OVER 1 LEVEL SUBTERRANEAN PARKING, 12.22.A.25
- Permit Issued
- Issued on 9/4/2025
- Issuing Office
- Metro
- Current Status
- Issued on 9/4/2025
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 7/25/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 7/27/2023 | VU NGUYEN |
| Assigned to Zoning Architect | 7/27/2023 | CALEB WONG |
| Corrections Issued | 8/2/2023 | VU NGUYEN |
| Quality Review Completed | 8/4/2023 | EUGENE BARBEAU |
| Applicant returned to address corrections | 9/17/2024 | VU NGUYEN |
| Plan Check Approved | 8/27/2025 | VU NGUYEN |
| Issued | 9/4/2025 | APPLICANT |
Permit Application Clearance Information
| Miscellaneous | Cleared | 8/16/2024 | YINGSHI HUANG |
| Miscellaneous | Cleared | 8/16/2024 | YINGSHI HUANG |
| Miscellaneous | Cleared | 8/16/2024 | YINGSHI HUANG |
| Hydrant and Access approval | Cleared | 9/18/2024 | LAVEON RIDER |
| Highway dedication | Cleared | 9/20/2024 | ABEL CASILLAS |
| Address approval | Cleared | 10/15/2024 | ABEL CASILLAS |
| Green Code | Cleared | 10/23/2024 | VU NGUYEN |
| Permit | Cleared | 10/29/2024 | ABEL CASILLAS |
| DAS Clearance | Cleared | 11/19/2024 | VU NGUYEN |
| Trees in Parkway | Cleared | 12/6/2024 | MIGUEL ORNELAS |
| Building over 36-ft | Cleared | 12/11/2024 | CALOSHA APPROVED |
| Low Impact Development (LID) | Cleared | 1/14/2025 | MARCO SANCHEZ |
| Roof/Waste drainage to street | Cleared | 1/17/2025 | JUSTIN BICOL |
| Fire Marshal Fire Life Safety | Cleared | 2/3/2025 | FIRE DEPARTMENT |
| Construction near power lines | Cleared | 3/3/2025 | RIDWAN HARDY |
| "Q" conditions | Cleared | 7/29/2025 | CLAUDE GOODING |
| Frnt yard landscape/Water mgmt | Cleared | 7/29/2025 | CLAUDE GOODING |
| Miscellaneous | Cleared | 7/29/2025 | CLAUDE GOODING |
| Miscellaneous | Cleared | 7/29/2025 | CLAUDE GOODING |
| Miscellaneous | Cleared | 7/29/2025 | CLAUDE GOODING |
| Opn space landscape/Water mgmt | Cleared | 7/29/2025 | CLAUDE GOODING |
| Eng Process Fee Ord 176,300 | Cleared | 8/5/2025 | ABEL CASILLAS |
| Sewer availability | Cleared | 8/5/2025 | ABEL CASILLAS |
| Density Bonus | Cleared | 8/8/2025 | ASHLEY MEDINA |
| SB8 RUD | Cleared | 8/8/2025 | ASHLEY MEDINA |
| Zoning Plan Check | Cleared | 8/13/2025 | Rodolfo Arias |
Contact Information
| Architect | Tighe,, Patrick J; Lic. No.: C27987 | 5757 VENICE BLVD LOS ANGELES, CA 90019 |
| Contractor | Guild G C Inc; Lic. No.: 981224-B | PO BOX 6090 MALIBU, CA 90264 |
| Engineer | Dermendjian,, Raffi Hrag; Lic. No.: C88261 | 9325 SHOSHONE AVENUE NORTHRIDGE, CA 91325 |
| Engineer | Zahn,, Michael; Lic. No.: S5054 | 9119 HARGIS STREET LOS ANGELES, CA 90034 |
Inspector Information
| MARTIN TAVITIAN, (213) 482-7357 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 9/16/2025 | Not Ready for Inspection | EDWIN GREGORYONA |
| METHANE-Barrier | 9/16/2025 | Not Ready for Inspection | EDWIN GREGORYONA |
| METHANE-Subgrade | 9/16/2025 | Not Ready for Inspection | EDWIN GREGORYONA |
| Pre-Inspection | 9/16/2025 | Approved | EDWIN GREGORYONA |
| Pre-Inspection | 9/19/2025 | Approved | EDWIN GREGORYONA |
| Pre-Inspection | 11/12/2025 | Approved | EDWIN GREGORYONA |
| Footing/Foundation/Slab | 4/9/2026 | Partial Approval | MARTIN TAVITIAN |
| METHANE-Barrier | 4/9/2026 | Partial Approval | MARTIN TAVITIAN |
| METHANE-Subgrade | 4/9/2026 | Partial Approval | MARTIN TAVITIAN |
| Footing/Foundation/Slab | 4/15/2026 | Partial Approval | CHRISTOPHER BLACKWOOD |
| METHANE-Barrier | 4/15/2026 | Partial Approval | CHRISTOPHER BLACKWOOD |
| METHANE-Subgrade | 4/15/2026 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Footing/Foundation/Slab | 4/23/2026 | Partial Approval | MARTIN TAVITIAN |
| METHANE-Barrier | 4/23/2026 | Not Ready for Inspection | MARTIN TAVITIAN |
| METHANE-Subgrade | 4/23/2026 | Partial Approval | MARTIN TAVITIAN |
| Green Building Rough | 4/24/2026 | Not Ready for Inspection | CHRISTOPHER BLACKWOOD |
| METHANE-Rough | 4/24/2026 | Approved | CHRISTOPHER BLACKWOOD |
| Reinforced Concrete Frame | 4/24/2026 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Verify Sprinkler Sign Off | 4/24/2026 | Not Ready for Inspection | CHRISTOPHER BLACKWOOD |
| Excavation/Setback/Form/Re-Bar | 4/29/2026 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Deputy Reinf. Masonry | 5/5/2026 | Partial Approval | MARTIN TAVITIAN |
| Reinforced Masonry Frame | 5/7/2026 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Excavation/Setback/Form/Re-Bar | 6/10/2026 | Partial Approval | MARTIN TAVITIAN |
| Footing/Foundation/Slab | 6/10/2026 | Partial Approval | MARTIN TAVITIAN |
| Green Building Rough | 6/10/2026 | Not Ready for Inspection | MARTIN TAVITIAN |
| METHANE-Barrier | 6/10/2026 | Approved | MARTIN TAVITIAN |
| METHANE-Subgrade | 6/10/2026 | Approved | MARTIN TAVITIAN |
| Reinforced Concrete Frame | 6/10/2026 | Partial Approval | MARTIN TAVITIAN |
| Verify Sprinkler Sign Off | 6/10/2026 | Not Ready for Inspection | MARTIN TAVITIAN |