848 N FULLER AVE 1-25 90046

Certificate Information: 848 N FULLER AVE 1-25 90046

Application / Permit
23010-10000-03004
Plan Check / Job No.
B23LA13496
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 4 STORY 25 UNITS (3 VL + 2 LOW = 20%) AFFORDABLE HOUSING APARTMENT TO INCLUDE 4 STORY TYPE VA APARTMENT OVER 1 LEVEL SUBTERRANEAN PARKING, 12.22.A.25
Permit Issued
Issued on 9/4/2025
Issuing Office
Metro
Current Status
Issued on 9/4/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/25/2023 APPLICANT
Assigned to Plan Check Engineer 7/27/2023 VU NGUYEN
Assigned to Zoning Architect 7/27/2023 CALEB WONG
Corrections Issued 8/2/2023 VU NGUYEN
Quality Review Completed 8/4/2023 EUGENE BARBEAU
Applicant returned to address corrections 9/17/2024 VU NGUYEN
Plan Check Approved 8/27/2025 VU NGUYEN
Issued 9/4/2025 APPLICANT

Permit Application Clearance Information

Miscellaneous Cleared 8/16/2024 YINGSHI HUANG
Miscellaneous Cleared 8/16/2024 YINGSHI HUANG
Miscellaneous Cleared 8/16/2024 YINGSHI HUANG
Hydrant and Access approval Cleared 9/18/2024 LAVEON RIDER
Highway dedication Cleared 9/20/2024 ABEL CASILLAS
Address approval Cleared 10/15/2024 ABEL CASILLAS
Green Code Cleared 10/23/2024 VU NGUYEN
Permit Cleared 10/29/2024 ABEL CASILLAS
DAS Clearance Cleared 11/19/2024 VU NGUYEN
Trees in Parkway Cleared 12/6/2024 MIGUEL ORNELAS
Building over 36-ft Cleared 12/11/2024 CALOSHA APPROVED
Low Impact Development (LID) Cleared 1/14/2025 MARCO SANCHEZ
Roof/Waste drainage to street Cleared 1/17/2025 JUSTIN BICOL
Fire Marshal Fire Life Safety Cleared 2/3/2025 FIRE DEPARTMENT
Construction near power lines Cleared 3/3/2025 RIDWAN HARDY
"Q" conditions Cleared 7/29/2025 CLAUDE GOODING
Frnt yard landscape/Water mgmt Cleared 7/29/2025 CLAUDE GOODING
Miscellaneous Cleared 7/29/2025 CLAUDE GOODING
Miscellaneous Cleared 7/29/2025 CLAUDE GOODING
Miscellaneous Cleared 7/29/2025 CLAUDE GOODING
Opn space landscape/Water mgmt Cleared 7/29/2025 CLAUDE GOODING
Eng Process Fee Ord 176,300 Cleared 8/5/2025 ABEL CASILLAS
Sewer availability Cleared 8/5/2025 ABEL CASILLAS
Density Bonus Cleared 8/8/2025 ASHLEY MEDINA
SB8 RUD Cleared 8/8/2025 ASHLEY MEDINA
Zoning Plan Check Cleared 8/13/2025 Rodolfo Arias

Contact Information

Architect Tighe,, Patrick J; Lic. No.: C27987 5757 VENICE BLVD      LOS ANGELES, CA 90019
Contractor Guild G C Inc; Lic. No.: 981224-B PO BOX 6090      MALIBU, CA 90264
Engineer Dermendjian,, Raffi Hrag; Lic. No.: C88261 9325 SHOSHONE AVENUE      NORTHRIDGE, CA 91325
Engineer Zahn,, Michael; Lic. No.: S5054 9119 HARGIS STREET      LOS ANGELES, CA 90034

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 9/16/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 9/16/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 9/16/2025 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 9/16/2025 Approved EDWIN GREGORYONA
Pre-Inspection 9/19/2025 Approved EDWIN GREGORYONA
Pre-Inspection 11/12/2025 Approved EDWIN GREGORYONA
Footing/Foundation/Slab 4/9/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 4/9/2026 Partial Approval MARTIN TAVITIAN
METHANE-Subgrade 4/9/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 4/15/2026 Partial Approval CHRISTOPHER BLACKWOOD
METHANE-Barrier 4/15/2026 Partial Approval CHRISTOPHER BLACKWOOD
METHANE-Subgrade 4/15/2026 Partial Approval CHRISTOPHER BLACKWOOD
Footing/Foundation/Slab 4/23/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 4/23/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Subgrade 4/23/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 4/24/2026 Not Ready for Inspection CHRISTOPHER BLACKWOOD
METHANE-Rough 4/24/2026 Approved CHRISTOPHER BLACKWOOD
Reinforced Concrete Frame 4/24/2026 Partial Approval CHRISTOPHER BLACKWOOD
Verify Sprinkler Sign Off 4/24/2026 Not Ready for Inspection CHRISTOPHER BLACKWOOD
Excavation/Setback/Form/Re-Bar 4/29/2026 Partial Approval CHRISTOPHER BLACKWOOD
Deputy Reinf. Masonry 5/5/2026 Partial Approval MARTIN TAVITIAN
Reinforced Masonry Frame 5/7/2026 Partial Approval CHRISTOPHER BLACKWOOD
Excavation/Setback/Form/Re-Bar 6/10/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 6/10/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 6/10/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Barrier 6/10/2026 Approved MARTIN TAVITIAN
METHANE-Subgrade 6/10/2026 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 6/10/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 6/10/2026 Not Ready for Inspection MARTIN TAVITIAN