9625 S HOBART BLVD 90047

Certificate Information: 9625 S HOBART BLVD 90047

Application / Permit
23010-10000-02969
Plan Check / Job No.
B23LA13353
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Eplam: New Deatached 1-Story ADU per LAMC 12.22 A.33(c) AND (d)
Permit Issued
Issued on 8/16/2024
Issuing Office
Current Status
CofO Issued on 3/27/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/27/2023 APPLICANT
Assigned to Plan Check Engineer 8/4/2023 DAVID CASTILLO
Corrections Issued 8/5/2023 DAVID CASTILLO
Applicant returned to address corrections 4/17/2024 DAVID CASTILLO
Plan Check Approved 4/24/2024 DAVID CASTILLO
Issued 8/16/2024 APPLICANT
CofO in Progress 3/25/2026 SALVADOR MARTINEZ
Permit Finaled 3/27/2026 DEROLD HAUFF
CofO Issued 3/27/2026 DEROLD HAUFF
Permit Finaled 3/27/2026 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 8/14/2023 NEIL TUANO
Eng Process Fee Ord 176,300 Cleared 8/14/2023 NEIL TUANO
Sewer availability Cleared 8/14/2023 NEIL TUANO
Low Impact Development (LID) Cleared 12/6/2023 SAMUEL LINN
Roof/Waste drainage to street Cleared 12/19/2023 ADRIAN SANCHEZ

Contact Information

Contractor Residential Remodeling & Development Co; Lic. No.: 926862-B       ,
Engineer Salto,, Alvaro; Lic. No.: C83859 2543 E NORMAN AVE      WEST COVINA, CA 91791

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 9/4/2024 Corrections Issued AMIR NAZARIAN
METHANE-Barrier 9/4/2024 Approved AMIR NAZARIAN
METHANE-Subgrade 9/4/2024 Approved AMIR NAZARIAN
PLUMBING-Rough 9/4/2024 Not Ready for Inspection AMIR NAZARIAN
Footing/Foundation/Slab 9/11/2024 Approved AMIR NAZARIAN
BUILDING-Rough-Frame 9/24/2024 Not Ready for Inspection AMIR NAZARIAN
METHANE-Rough 9/24/2024 Approved AMIR NAZARIAN
PLUMBING-Rough 9/24/2024 Corrections Issued AMIR NAZARIAN
Verify Sprinkler Sign Off 9/24/2024 Not Ready for Inspection AMIR NAZARIAN
Floor/Roof Diaphrgm/Shear Wall 9/27/2024 Partial Approval AMIR NAZARIAN
Insulation 9/27/2024 Partial Approval AMIR NAZARIAN
PLUMBING-Rough 9/27/2024 Partial Approval AMIR NAZARIAN
Floor/Roof Diaphrgm/Shear Wall 10/18/2024 Approved JOSE MACIAS
Floor/Roof Diaphrgm/Shear Wall 10/23/2024 Approved AMIR NAZARIAN
PLUMBING-Rough 10/23/2024 Approved AMIR NAZARIAN
Wood Frame 11/4/2024 Corrections Issued AMIR NAZARIAN
ELECTRICAL-Rough 11/25/2024 Corrections Issued AMIR NAZARIAN
HVAC-Rough 11/25/2024 Conditional Approval AMIR NAZARIAN
PLUMBING-Rough 11/25/2024 Approved AMIR NAZARIAN
ELECTRICAL-Rough 12/2/2024 Approved AMIR NAZARIAN
Wood Frame 12/4/2024 Corrections Issued AMIR NAZARIAN
Insulation 12/10/2024 Not Ready for Inspection SABAS ALONSO
Interior/Exterior Lathing 12/10/2024 Partial Approval SABAS ALONSO
BUILDING-Rough-Frame 1/13/2025 Approved SABAS ALONSO
Green Building Rough 1/13/2025 Approved SABAS ALONSO
Insulation 1/13/2025 Approved SABAS ALONSO
Insulation 1/15/2025 Approved BARRY HACHE
ELECTRICAL-Final 8/5/2025 Not Ready for Inspection WAYNE REGESTER
PLUMBING-Final 8/5/2025 Not Ready for Inspection WAYNE REGESTER
ELECTRICAL-Final 8/29/2025 Not Ready for Inspection SALVADOR MARTINEZ
PLUMBING-Final 8/29/2025 Corrections Issued SALVADOR MARTINEZ
ELECTRICAL-Final 10/7/2025 Corrections Issued SALVADOR MARTINEZ
PLUMBING-Final 10/7/2025 Corrections Issued SALVADOR MARTINEZ
ELECTRICAL-Final 10/20/2025 Approved MICHAEL LEWIS
HVAC-Final 10/20/2025 Approved MICHAEL LEWIS
PLUMBING-Final 10/20/2025 Approved MICHAEL LEWIS
Drywall Nailing 3/24/2026 Approved SALVADOR MARTINEZ
Final 3/24/2026 OK to Issue CofO SALVADOR MARTINEZ
SGSOV-Seismic Gas S/O Valve 3/24/2026 SGSOV No Gas SALVADOR MARTINEZ
Service/Power Release 3/24/2026 Approved SALVADOR MARTINEZ
Smoke Detectors 3/24/2026 Approved SALVADOR MARTINEZ