1156 W FLORENCE AVE 1-15 90044

Certificate Information: 1156 W FLORENCE AVE 1-15 90044

Application / Permit
23010-10000-02699
Plan Check / Job No.
B23LA11822
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
ePLAN. NEW 3 STORY TYPE VA 14 UNITS +1 ADU (100% AFFORDABLE HOUSING; 1 VLI, 10 LI AND 2 MI), PER 12.22.A.25 INCENTIVES
Permit Issued
Issued on 6/14/2024
Issuing Office
Current Status
Issued on 6/14/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/29/2023 APPLICANT
Assigned to Zoning Architect 6/29/2023 FRANCIS AHN
Assigned to Plan Check Engineer 7/6/2023 KEVIN MORALES
Corrections Issued 8/1/2023 KEVIN MORALES
Quality Review Completed 8/4/2023 EUGENE BARBEAU
Applicant returned to address corrections 8/22/2023 KEVIN MORALES
Applicant returned to address corrections 10/6/2023 KEVIN MORALES
Plan Check Approved 2/27/2024 KEVIN MORALES
Issued 6/14/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 8/10/2023 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 8/21/2023 WALLIE JONG
Highway dedication Cleared 8/21/2023 WALLIE JONG
Building over 36-ft Cleared 10/19/2023 CALOSHA APPROVED
Hydrant and Access approval Cleared 12/19/2023 LAVEON RIDER
Historic Resource Verification Cleared 1/16/2024 RAFAEL FONTES
Fire Marshal Fire Life Safety Cleared 1/24/2024 MENOA AGHAJANI
Green Code Cleared 1/24/2024 KEVIN MORALES
DAS Clearance Cleared 1/30/2024 KEVIN MORALES
Construction near power lines Cleared 2/1/2024 RIDWAN HARDY
Low Impact Development (LID) Cleared 2/1/2024 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 2/3/2024 STEVEN JIN
Miscellaneous Cleared 2/8/2024 ELIZABETH GALLARDO
Redevelopment Project Area Cleared 2/8/2024 ELIZABETH GALLARDO
Sewer availability Cleared 2/9/2024 WALLIE JONG
Miscellaneous Cleared 2/16/2024 JAZMIN ROQUE
Miscellaneous Cleared 2/16/2024 JAZMIN ROQUE
Community Plan Implem. Overlay Cleared 2/21/2024 MANERI ROMAN
Density Bonus Cleared 2/21/2024 RICHARD TRUONG
Miscellaneous Cleared 2/21/2024 MANERI ROMAN
Miscellaneous Cleared 2/21/2024 MANERI ROMAN
Miscellaneous Cleared 2/21/2024 MANERI ROMAN
Miscellaneous Cleared 2/21/2024 MANERI ROMAN
Miscellaneous Cleared 2/21/2024 MANERI ROMAN
Miscellaneous Cleared 2/21/2024 MANERI ROMAN
Miscellaneous Cleared 2/21/2024 MANERI ROMAN
SB8 RUD Cleared 2/21/2024 RICHARD TRUONG
Zoning Plan Check Cleared 2/22/2024 Rodolfo Arias
Frnt yard landscape/Water mgmt Cleared 2/23/2024 JAZMIN ROQUE
Opn space landscape/Water mgmt Cleared 2/23/2024 JAZMIN ROQUE
Miscellaneous Cleared 2/26/2024 JAZMIN ROQUE

Contact Information

Architect Crane,, Andrew G; Lic. No.: C34124       ,
Contractor Avocado Design & Build Inc; Lic. No.: 1114735-B 2699 1/2 N BEACHWOOD DR   STE 532    LOS ANGELES, CA 90068
Engineer Krief,, Dan D; Lic. No.: C76041 6420 WILSHIRE BLVD STE 1000      LOS ANGELES, CA 90048
Engineer Rybak,, Richard; Lic. No.: GE2131 20312 TAU PLACE      CHATSWORTH, CA 91311
Engineer Xia,, Ji; Lic. No.: S7144 260 S LOS ROBLES AVE, STE 100      PASADENA, CA 91101

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/25/2024 Approved RAFAEL ESPINOZA
Special/Order Compliance 10/9/2024 Partial Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/24/2024 Not Ready for Inspection RAFAEL CORTES
Footing/Foundation/Slab 10/24/2024 Not Ready for Inspection RAFAEL CORTES
Footing/Foundation/Slab 10/25/2024 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/2/2024 No Access for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/3/2024 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/18/2024 Corrections Issued RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/26/2024 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/14/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 1/31/2025 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 1/31/2025 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 2/25/2025 Approved RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 3/3/2025 Partial Approval RAFAEL CORTES
Wall Anchors 3/3/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 3/7/2025 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 4/15/2025 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/29/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/29/2025 Partial Inspection EDWIN GREGORYONA
Green Building Rough 5/5/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 5/5/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 5/5/2025 Not Ready for Inspection LARRY ARNICK
Green Building Rough 5/8/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 5/8/2025 Not Ready for Inspection RAFAEL CORTES
Verify Sprinkler Sign Off 5/8/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 5/8/2025 Not Ready for Inspection RAFAEL CORTES
Green Building Rough 5/21/2025 Not Ready for Inspection RAFAEL CORTES
Verify Sprinkler Sign Off 5/21/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 5/21/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 6/17/2025 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/17/2025 Partial Inspection RAFAEL ESPINOZA
Wood Frame 6/17/2025 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/23/2025 Partial Approval RAFAEL ESPINOZA
Green Building Rough 6/23/2025 Approved RAFAEL ESPINOZA
Insulation 6/23/2025 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/23/2025 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/2/2025 Partial Approval LARRY ARNICK
Insulation 7/2/2025 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 7/2/2025 Not Ready for Inspection LARRY ARNICK
Insulation 7/7/2025 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 7/15/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 7/15/2025 Partial Approval RAFAEL CORTES
Insulation 7/18/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 7/21/2025 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 7/29/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 8/6/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 8/12/2025 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 9/11/2025 Not Ready for Inspection RAFAEL CORTES
Light Gage Steel Frame 9/23/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 10/7/2025 Approved JOEY BUCHANAN