Pre-Inspection
|
1/24/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/28/2025
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/1/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
5/1/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
5/1/2025
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Barrier
|
5/1/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Subgrade
|
5/1/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
5/6/2025
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/6/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/7/2025
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/7/2025
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/7/2025
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
5/7/2025
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
5/7/2025
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/8/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
METHANE-Rough
|
5/8/2025
|
Approved
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
5/8/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Verify Sprinkler Sign Off
|
5/8/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
5/16/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
5/16/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
5/21/2025
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
5/21/2025
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Footing/Foundation/Slab
|
5/21/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
5/22/2025
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/22/2025
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/22/2025
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/27/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Green Building Rough
|
5/28/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
5/28/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Verify Sprinkler Sign Off
|
5/28/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
6/4/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Shotcrete
|
6/4/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/4/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
6/5/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Shotcrete
|
6/5/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Green Building Rough
|
6/5/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
6/5/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Verify Sprinkler Sign Off
|
6/5/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
6/9/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Shotcrete
|
6/9/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/9/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
6/24/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
6/24/2025
|
Corrections Issued
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
6/25/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
7/1/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
7/7/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/24/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/5/2025
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
8/5/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/7/2025
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
8/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/8/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
8/8/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Green Building Rough
|
8/8/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
8/8/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
8/8/2025
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/12/2025
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Shotcrete
|
8/12/2025
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
8/12/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
8/18/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/19/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
8/20/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Shotcrete
|
8/20/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/20/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
9/2/2025
|
Approved
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
9/5/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/11/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/18/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Shotcrete
|
9/18/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
9/18/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
9/22/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
9/22/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
9/22/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
9/24/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
10/1/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/6/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
10/21/2025
|
Partial Inspection
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
10/27/2025
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
10/27/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
10/30/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
10/30/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Reinforced Masonry Frame
|
10/30/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
10/31/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
10/31/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Pre-Inspection
|
10/31/2025
|
Approved
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
11/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
11/19/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Reinforced Masonry Frame
|
11/19/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
11/20/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Masonry Wall/Backfill
|
11/20/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
12/8/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
12/8/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
12/8/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
12/8/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Reinforced Masonry Frame
|
12/8/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
12/16/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
12/18/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/12/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
1/16/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Drilled-In Anchors
|
1/22/2026
|
Conditional Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
1/22/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
1/22/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
1/26/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
1/26/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
1/27/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
1/28/2026
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/3/2026
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Steel/Welding
|
2/3/2026
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Wood Construction
|
2/3/2026
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/3/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
2/5/2026
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
2/11/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/17/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
2/20/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
2/20/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/24/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
3/2/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
3/6/2026
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/6/2026
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/10/2026
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/12/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
3/20/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
3/20/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
3/30/2026
|
Partial Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/15/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/16/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/20/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/22/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
4/23/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
4/24/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
4/24/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/4/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Wood Frame
|
5/4/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/5/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
5/5/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/6/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
5/6/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
5/6/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
5/7/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
5/7/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Wood Frame
|
5/7/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Reinf. Concrete
|
5/8/2026
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
5/8/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
5/12/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
5/12/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
5/13/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
5/14/2026
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/18/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
5/19/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/20/2026
|
Conditional Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
5/20/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
5/22/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Wood Frame
|
5/26/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
5/28/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/29/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/1/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
6/2/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Wood Frame
|
6/2/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/3/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
6/5/2026
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/5/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
6/5/2026
|
No Access for Inspection
|
RAFAEL CORTES
|