Pre-Inspection
|
1/3/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
1/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
1/9/2024
|
Partial Inspection
|
MELVIN GIRTON
|
|
Special/Order Compliance
|
4/11/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/9/2024
|
Corrections Issued
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/16/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/17/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/31/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/3/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/13/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/17/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/21/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/24/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/25/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/25/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/26/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/26/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/27/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/1/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/2/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/2/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/9/2024
|
Approved
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
7/9/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/10/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/12/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/15/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/18/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/18/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/19/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/24/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/24/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/24/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/25/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/25/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/26/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/26/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/26/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/29/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/29/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/30/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/30/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/31/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/31/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/5/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/6/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/6/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/7/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/8/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/9/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/12/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/13/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
8/14/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
8/15/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/15/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/16/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
8/16/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/16/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/9/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
9/10/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
9/10/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
9/10/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/13/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/16/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/17/2024
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
9/17/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/18/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
9/19/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
9/19/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
9/19/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/26/2024
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
9/26/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/27/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Masonry Wall/Backfill
|
10/1/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
10/9/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
10/10/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
10/10/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
10/11/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
11/7/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/18/2024
|
Partial Inspection
|
BRIAN KELLY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/19/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/25/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/2/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/9/2024
|
Approved
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
12/16/2024
|
Not Ready for Inspection
|
BRIAN KELLY
|
|
Wood Frame
|
12/18/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
12/19/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
12/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/27/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/9/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
1/15/2025
|
Approved
|
ROBERT DAVIS
|
|
Wood Frame
|
1/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
1/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
1/23/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
1/27/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/28/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
1/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
1/30/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
1/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
1/30/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
2/3/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
2/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
2/19/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
2/20/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
2/21/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
2/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
2/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
2/25/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Insulation
|
2/25/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
2/26/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
2/26/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
2/26/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
2/27/2025
|
Approved
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/27/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
2/28/2025
|
Approved
|
ROBERT DAVIS
|
|
Wood Frame
|
2/28/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/3/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/4/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/4/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/5/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Insulation
|
3/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/7/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
3/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
3/11/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
3/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/13/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
3/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
3/19/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/19/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
3/20/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/25/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
3/27/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
3/28/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
4/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
4/4/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
4/4/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
4/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
4/9/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
4/10/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
4/15/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
4/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
4/16/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
4/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
4/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
4/21/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
4/22/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
4/22/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
4/29/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/1/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
5/2/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
5/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
5/6/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Insulation
|
5/7/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
5/8/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
5/8/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
5/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
5/13/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
5/14/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
5/14/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
5/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Structural Steel Frame
|
5/20/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
5/21/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
5/22/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
5/22/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Insulation
|
5/22/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
5/23/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
5/28/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
5/29/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
5/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
6/3/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
6/4/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
6/4/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
6/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
6/10/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
6/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
6/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
6/12/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
6/13/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Final
|
6/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/18/2025
|
Approved
|
ROBERT DAVIS
|
|
Green Building Final
|
6/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/18/2025
|
Approved
|
ROBERT DAVIS
|
|
Insulation
|
6/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
6/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
6/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
SGSOV-Seismic Gas S/O Valve
|
6/18/2025
|
SGSOV Not Ready
|
ROBERT DAVIS
|
|
Smoke Detectors
|
6/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Structural Steel Frame
|
6/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
6/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
6/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
7/1/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
7/2/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
7/3/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
7/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
7/10/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
7/14/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
7/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
7/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/22/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
7/28/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
7/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
8/4/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
8/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
8/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/9/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
10/1/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
10/1/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
10/2/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
10/21/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Final
|
10/27/2025
|
No Access for Inspection
|
MARTIN TAVITIAN
|
|
Green Building Final
|
10/27/2025
|
No Access for Inspection
|
MARTIN TAVITIAN
|
|
Reinforced Concrete Frame
|
10/27/2025
|
No Access for Inspection
|
MARTIN TAVITIAN
|
|
Reinforced Masonry Frame
|
10/27/2025
|
No Access for Inspection
|
MARTIN TAVITIAN
|
|
SGSOV-Seismic Gas S/O Valve
|
10/27/2025
|
SGSOV Not Ready
|
MARTIN TAVITIAN
|
|
Smoke Detectors
|
10/27/2025
|
No Access for Inspection
|
MARTIN TAVITIAN
|
|
Verify Sprinkler Sign Off
|
10/27/2025
|
No Access for Inspection
|
MARTIN TAVITIAN
|
|
Wood Frame
|
10/28/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
11/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Final
|
12/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Final
|
12/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
12/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
12/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
SGSOV-Seismic Gas S/O Valve
|
12/1/2025
|
SGSOV No Gas
|
ROBERT DAVIS
|
|
Smoke Detectors
|
12/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
12/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
12/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
12/3/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
1/5/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
1/8/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
1/9/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/4/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
2/5/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
2/9/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
2/10/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/11/2026
|
No Access for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/12/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/13/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/17/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/18/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/20/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
3/12/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
3/13/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
3/24/2026
|
Approved
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
4/1/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
4/21/2026
|
Approved
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
4/27/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
4/28/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
5/6/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
5/8/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
5/18/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Smoke Detectors
|
5/26/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
5/27/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
5/28/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Final
|
5/29/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Final
|
5/29/2026
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
5/29/2026
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
5/29/2026
|
Approved
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
5/29/2026
|
Approved
|
ROBERT DAVIS
|
|
Wood Frame
|
6/1/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
6/2/2026
|
Approved
|
ROBERT DAVIS
|
|
Wood Frame
|
6/3/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|