416 N ROCKINGHAM AVE 90049

Certificate Information: 416 N ROCKINGHAM AVE 90049

Application / Permit
23010-10000-01332
Plan Check / Job No.
B23LA05716
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED SINGLE FAMILY DWELLING WITH ATTACHE GARAGE
Permit Issued
Issued on 3/25/2025
Issuing Office
Metro
Current Status
Issued on 3/25/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/29/2023 APPLICANT
Assigned to Plan Check Engineer 4/13/2023 SINA KHOSRAVI
Corrections Issued 4/27/2023 SINA KHOSRAVI
Quality Review Completed 5/11/2023 TEODORO DIAZ RODRIGUEZ
Building Plans Picked Up 5/16/2023 APPLICANT
Applicant returned to address corrections 4/15/2024 SINA KHOSRAVI
Applicant returned to address corrections 1/14/2025 SINA KHOSRAVI
Applicant returned to address corrections 2/25/2025 SINA KHOSRAVI
Plan Check Approved 3/11/2025 SINA KHOSRAVI
Issued 3/25/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 4/23/2023 AHMED AMARRAGY
Eng Process Fee Ord 176,300 Cleared 4/27/2023 DINAH GARIN
Permit Cleared 4/27/2023 DINAH GARIN
Sewer availability Cleared 4/27/2023 DINAH GARIN
Hydrant and Access approval Cleared 5/12/2023 KURT CORRAL
Miscellaneous Cleared 5/30/2023 SINA KHOSRAVI
Construction within easement Cleared 6/16/2023 RIDWAN HARDY
Low Impact Development (LID) Cleared 12/4/2024 LUIS LUVANO
Roof/Waste drainage to street Cleared 12/4/2024 DIANA RENTERIA

Contact Information

Architect Mehran, Shahverdi; Lic. No.: C39691       ,
Contractor Gaia Construction Inc; Lic. No.: 912485-B 2800 GLENDON AVENUE      LOS ANGELES, CA 90064
Engineer Siamak, Vahdati; Lic. No.: C65255       ,

Inspector Information

No Data Available.

Pending Inspections

Deputy Reinf. Concrete 6/12/2026   
Reinforced Concrete Frame 6/15/2026   
Excavation/Setback/Form/Re-Bar 6/16/2026   

Inspection Request History

Pre-Inspection 9/2/2025 Approved MEL KHACHATOURIAN
Piling/Pier/Caisson 1/15/2026 Partial Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 1/23/2026 Conditional Approval KEVIN SARGSYAN
Pre-Inspection 2/12/2026 Partial Inspection KEVIN SARGSYAN
PLUMBING-Rough 3/27/2026 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 4/15/2026 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 4/30/2026 Partial Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 5/19/2026 Conditional Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 5/19/2026 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 5/19/2026 Corrections Issued KEVIN SARGSYAN
Reinforced Masonry Frame 5/19/2026 Not Ready for Inspection KEVIN SARGSYAN
Deputy Reinf. Concrete 5/20/2026 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 6/5/2026 Not Ready for Inspection KEVIN SARGSYAN
Deputy Reinf. Concrete 6/8/2026 Conditional Approval KEVIN SARGSYAN
Deputy Shotcrete 6/8/2026 Conditional Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 6/9/2026 Conditional Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 6/10/2026 Conditional Approval ANDREW NAVE
Deputy Reinf. Concrete 6/11/2026 Conditional Approval ANDREW NAVE