2100 E PACIFIC COAST HWY 90744
Certificate Information: 2100 E PACIFIC COAST HWY 90744
- Application / Permit
- 23010-10000-00503
- Plan Check / Job No.
- B22LA26570
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Commercial
- Primary Use
- (23) Miscellaneous Bldg/Structure
- Work Description
- ePLAN. NEW BUILDING FOR MECHANICAL EQUIPMENT (SWITCHGEAR BUILDING)
- Permit Issued
- Issued on 8/8/2023
- Issuing Office
- Current Status
- Issued on 8/8/2023
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 1/12/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 2/2/2023 | JOE VO |
| Corrections Issued | 2/13/2023 | ALBERT SERVIN |
| Quality Review Completed | 2/15/2023 | PETER KIM |
| Plan Check Approved | 7/27/2023 | KEVIN MORALES |
| Issued | 8/8/2023 | APPLICANT |
Permit Application Clearance Information
| DAS Clearance | Cleared | 2/26/2023 | ALBERT SERVIN |
| Port of LA Approval | Cleared | 3/2/2023 | CHRISTINA SAR |
| "Q" conditions | Cleared | 3/6/2023 | KENTON TRINH |
| ZI | Cleared | 3/6/2023 | KENTON TRINH |
| ZI | Cleared | 3/6/2023 | KENTON TRINH |
| Stormwater Pollution Mitigatn | Cleared | 3/14/2023 | MARTIN FRAGOSO |
| Abandoned oil well | Cleared | 4/18/2023 | KURT CORRAL |
| Green Code | Cleared | 6/30/2023 | ALBERT SERVIN |
Contact Information
| Contractor | Schultz Industrial Services Inc; Lic. No.: 685876-C10 | 17988 EDISON AVENUE CHESTERFIELD, MO 63005 |
| Engineer | Delrie,, Jason Brent; Lic. No.: C81502 | 1003 CALAIS CIRCLE ALEXANDRIA, LA 71035 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Reinf. Concrete | 10/2/2023 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 10/2/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/3/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/4/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/5/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/6/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/10/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/11/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/12/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/13/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/16/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/17/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/18/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/19/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/20/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/23/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/24/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/25/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/26/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/27/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 10/31/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/1/2023 | Approved | JOEY BUCHANAN |
| Excavation/Setback/Form/Re-Bar | 11/1/2023 | Partial Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/2/2023 | Conditional Approval | AMANUEL BERHE |
| Deputy Reinf. Concrete | 11/3/2023 | Conditional Approval | AMANUEL BERHE |
| Deputy Reinf. Concrete | 11/6/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/7/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/8/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/9/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/13/2023 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/14/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/15/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/16/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/17/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/20/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/21/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/22/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/28/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/29/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/30/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/1/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/4/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/5/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/6/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/7/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/8/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/11/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/12/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/13/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/14/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/15/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/18/2023 | Approved | AMANUEL BERHE |
| Deputy Reinf. Concrete | 12/19/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/20/2023 | Approved | JOEY BUCHANAN |
| Excavation/Setback/Form/Re-Bar | 12/20/2023 | Partial Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/21/2023 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 12/22/2023 | Conditional Approval | AMANUEL BERHE |
| Deputy Reinf. Concrete | 1/8/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/9/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/10/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/11/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/12/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/16/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/17/2024 | Approved | JOEY BUCHANAN |
| Excavation/Setback/Form/Re-Bar | 1/17/2024 | Partial Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/18/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/19/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/22/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/23/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/24/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/25/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/26/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/29/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/30/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 1/31/2024 | Conditional Approval | AMANUEL BERHE |
| Deputy Reinf. Concrete | 2/1/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 2/2/2024 | Conditional Approval | DAVID TSAU |
| Deputy Reinf. Concrete | 2/7/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 2/8/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 2/9/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/5/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/6/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/7/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/8/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/11/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/12/2024 | No Access for Inspection | AMANUEL BERHE |
| Deputy Steel/Welding | 3/13/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/19/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/20/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/21/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/22/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/26/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/27/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 3/28/2024 | Approved | AMANUEL BERHE |
| Deputy Steel/Welding | 4/2/2024 | Conditional Approval | RICARDO ROBLES |
| Deputy Steel/Welding | 4/3/2024 | Approved | AMANUEL BERHE |
| Deputy Steel/Welding | 4/4/2024 | Approved | AMANUEL BERHE |
| Deputy Steel/Welding | 4/5/2024 | Approved | AMANUEL BERHE |
| Deputy Steel/Welding | 4/8/2024 | Approved | AMANUEL BERHE |
| Deputy Steel/Welding | 4/9/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/10/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/11/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/12/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/16/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/16/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/17/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/17/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/18/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/18/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/19/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/19/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/22/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/22/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/23/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/23/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/24/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/24/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/25/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Steel/Welding | 4/25/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 4/26/2024 | Approved | JOEY BUCHANAN |
| Deputy Drilled-In Anchors | 5/6/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/7/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/8/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/9/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/13/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/14/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/15/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/16/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/20/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 5/21/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/21/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 5/22/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 5/23/2024 | Approved | AMANUEL BERHE |
| Deputy Reinf. Concrete | 5/24/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 5/29/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/29/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 5/30/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 5/30/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 5/31/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/3/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/4/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 6/4/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/5/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 6/5/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/6/2024 | Approved | AMANUEL BERHE |
| Deputy Steel/Welding | 6/6/2024 | Approved | AMANUEL BERHE |
| Deputy Reinf. Concrete | 6/7/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/10/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 6/10/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/11/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Steel/Welding | 6/11/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/12/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 6/12/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/13/2024 | Approved | JOEY BUCHANAN |
| Deputy Steel/Welding | 6/13/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/14/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/20/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/21/2024 | Approved | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/24/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/25/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/26/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 6/27/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 9/16/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Steel/Welding | 9/16/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 9/17/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 9/18/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 9/19/2024 | Conditional Approval | JOEY BUCHANAN |
| Excavation/Setback/Form/Re-Bar | 9/19/2024 | Partial Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 9/20/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/4/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/5/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/6/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/7/2024 | Conditional Approval | JOEY BUCHANAN |
| Deputy Reinf. Concrete | 11/8/2024 | Conditional Approval | JOEY BUCHANAN |
| Excavation/Setback/Form/Re-Bar | 3/24/2025 | Approved | JOEY BUCHANAN |
| Excavation/Setback/Form/Re-Bar | 1/13/2026 | Approved | RICARDO ROBLES |
| Final | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| Footing/Foundation/Slab | 1/13/2026 | Partial Approval | RICARDO ROBLES |
| Green Building Final | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| Green Building Rough | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| METHANE-Barrier | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| METHANE-Final | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| METHANE-Rough | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| METHANE-Subgrade | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| Reinforced Masonry Frame | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| SGSOV-Seismic Gas S/O Valve | 1/13/2026 | SGSOV Not Ready | RICARDO ROBLES |
| Smoke Detectors | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |
| Verify Sprinkler Sign Off | 1/13/2026 | Not Ready for Inspection | RICARDO ROBLES |