3486 S WADE ST 90066

Certificate Information: 3486 S WADE ST 90066

Application / Permit
22047-30000-01625
Plan Check / Job No.
B22WL03019
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
(N) swimming pool with baja shelf and spa per Department standard plan #270 in the rear of the lot with engineer's calcs. *** 1 of 2 ***
Permit Issued
Issued on 12/2/2022
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/15/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/5/2022 APPLICANT
Assigned to Plan Check Engineer 8/18/2022 JAHANSHAH POURHASSAN
Corrections Issued 8/19/2022 JAHANSHAH POURHASSAN
Building Plans Picked Up 8/23/2022 APPLICANT
Applicant returned to address corrections 11/8/2022 JAHANSHAH POURHASSAN
Plan Check Approved 11/30/2022 JASON JANGADA
Issued 12/2/2022 APPLICANT
CofO in Progress 5/12/2023 JESUS RODRIGUEZ
Permit Finaled 5/15/2023 DANIEL ORRANTE
CofO Issued 5/15/2023 DANIEL ORRANTE
Permit Finaled 5/15/2023 DANIEL ORRANTE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 8/22/2022 JAHANSHAH POURHASSAN
Construction within easement Cleared 10/17/2022 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Cristescu,, Barbu Dan; Lic. No.: C72038 14401 SYLVAN STREET 209      VAN NUYS, CA 91401

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/9/2023 Approved HERBERT GIRON
Gas Piping or Gas Test 3/9/2023 Approved HERBERT GIRON
Pool Piping 3/9/2023 Approved HERBERT GIRON
Pre-Gunite 3/9/2023 Approved HERBERT GIRON
ELECTRICAL-Final 4/24/2023 Not Ready for Inspection JESUS RODRIGUEZ
Enclosure/Fence 4/24/2023 Corrections Issued JESUS RODRIGUEZ
Final 4/24/2023 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Final 4/24/2023 Not Ready for Inspection JESUS RODRIGUEZ
Pool/Spa Cover 4/24/2023 Not Ready for Inspection JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 4/24/2023 SGSOV Not Ready JESUS RODRIGUEZ
Equipment Noise Level 4/25/2023 Approved JAMES VORHIS
ELECTRICAL-Final 4/26/2023 Corrections Issued JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 4/26/2023 SGSOV Approved JESUS RODRIGUEZ
Grounding or Bonding 5/1/2023 Approved JESUS RODRIGUEZ
ELECTRICAL-Final 5/12/2023 Approved JESUS RODRIGUEZ
Enclosure/Fence 5/12/2023 Approved JESUS RODRIGUEZ
Final 5/12/2023 OK to Issue CofO JESUS RODRIGUEZ