533 N EDINBURGH AVE 90048
Certificate Information: 533 N EDINBURGH AVE 90048
- Application / Permit
- 22047-20000-02335
- Plan Check / Job No.
- B22VN17311
- Group
- Building
- Type
- Swimming-Pool/Spa
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (20) Pool/Spa - Private
- Work Description
- NEW 36'-2" x 10'-7" POOL WITH A RAISED BOND BEAM AND 8'-4" x 10'-7" SPA PER LA CITY STANDARD PLAN #268 AND ENGINEERING DETAILS.
- Permit Issued
- Issued on 1/30/2023
- Issuing Office
- Valley
- Current Status
- CofO Issued on 12/12/2023
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 11/22/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 11/23/2022 | LUIS RINCON |
| Corrections Issued | 11/26/2022 | LUIS RINCON |
| Building Plans Picked Up | 12/2/2022 | APPLICANT |
| Plan Check Approved | 1/30/2023 | MIROOSH KHACHATOORIAN |
| Issued | 1/30/2023 | APPLICANT |
| CofO in Progress | 12/8/2023 | LILIANA PORTILLO |
| CofO Issued | 12/12/2023 | DEROLD HAUFF |
| Permit Finaled | 12/12/2023 | DEROLD HAUFF |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | John Crystal Pools; Lic. No.: 1008762-C53 | 9560 TOPANGA CANYON BLVD UNIT 202 CHATSWORTH, CA 91311 |
| Engineer | Biedenbach,, Christopher James; Lic. No.: C74003 | 1201 N TUSTIN AVE ANAHEIM, CA 92807 |
Inspector Information
| JOSE MACIAS, (213) 202-3125 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 3/9/2023 | Corrections Issued | MICHAEL LEWIS |
| Pool Piping | 3/9/2023 | Approved | MICHAEL LEWIS |
| Pre-Gunite | 3/9/2023 | Approved | MICHAEL LEWIS |
| Deputy Shotcrete | 3/20/2023 | Conditional Approval | MICHAEL LEWIS |
| Grounding or Bonding | 5/15/2023 | Approved | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 8/31/2023 | SGSOV Not Ready | LILIANA PORTILLO |
| Enclosure/Fence | 11/6/2023 | Approved | LILIANA PORTILLO |
| Equipment Noise Level | 11/21/2023 | Approved | DA LIU |
| Excavation/Setback/Form/Re-Bar | 12/7/2023 | Approved | LILIANA PORTILLO |
| Final | 12/7/2023 | OK to Issue CofO | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 12/7/2023 | SGSOV Approved | LILIANA PORTILLO |