4603 N MARY ELLEN AVE 91423

Certificate Information: 4603 N MARY ELLEN AVE 91423

Application / Permit
22047-20000-00696
Plan Check / Job No.
B22VN05193
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW SWIMMING POOL WITH SPA. WORK PER STANDARD PLAN #268.
Permit Issued
Issued on 10/31/2022
Issuing Office
Valley
Current Status
CofO Issued on 12/31/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/6/2022 APPLICANT
Assigned to Plan Check Engineer 4/7/2022 ROSENDO MEDINA
Corrections Issued 4/7/2022 ROSENDO MEDINA
Applicant returned to address corrections 5/24/2022 ROSENDO MEDINA
Building Plans Picked Up 5/27/2022 APPLICANT
Plan Check Approved 10/25/2022 RICARDO RAMIREZ
Issued 10/31/2022 APPLICANT
CofO in Progress 11/3/2025 CHRISTOPHE COCHRAN
Permit Finaled 12/31/2025 RUBEN SALAS
CofO Issued 12/31/2025 RUBEN SALAS
Permit Finaled 12/31/2025 RUBEN SALAS

Permit Application Clearance Information

Construction near power lines Cleared 6/3/2022 RIDWAN HARDY

Contact Information

Contractor Aram G Construction Inc; Lic. No.: 961066-B 608 N BEL AIRE DR      BURBANK, CA 91501
Engineer Alrayes,, Nidham Aram; Lic. No.: C65487 10346 SAMOA AVE      TUJUNGA, CA 91042
Engineer Thompson,, Matthew Gregory; Lic. No.: C86051 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/3/2023 Corrections Issued JOHN COLEMAN
Excavation/Setback/Form/Re-Bar 5/1/2023 No Access for Inspection CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 6/2/2023 No Access for Inspection CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 6/12/2023 Corrections Issued CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 11/1/2023 Corrections Issued CHRISTOPHE COCHRAN
Pool Piping 4/18/2024 Corrections Issued CHRISTOPHE COCHRAN
Rough-Electrical 4/18/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Rough-Plumbing 4/18/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Grounding or Bonding 5/24/2024 Not Ready for Inspection JACK KARGODORIAN
Pre-Inspection 7/18/2024 Corrections Issued CHRISTOPHE COCHRAN
Grounding or Bonding 8/6/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Enclosure/Fence 5/7/2025 Corrections Issued CHRISTOPHE COCHRAN
Enclosure/Fence 5/19/2025 Approved CHRISTOPHE COCHRAN
Equipment Noise Level 7/25/2025 Approved FELIPE PENICHE
Excavation/Setback/Form/Re-Bar 7/25/2025 Approved KEVIN BERBERYAN
Final 7/25/2025 Corrections Issued KEVIN BERBERYAN
Pre-Gunite 7/25/2025 Approved KEVIN BERBERYAN
SGSOV-Seismic Gas S/O Valve 7/25/2025 SGSOV Approved KEVIN BERBERYAN
Final 11/3/2025 OK to Issue CofO CHRISTOPHE COCHRAN