6723 W COLGATE AVE 90048
Certificate Information: 6723 W COLGATE AVE 90048
- Application / Permit
- 22047-20000-00580
- Plan Check / Job No.
- B22VN04351
- Group
- Building
- Type
- Swimming-Pool/Spa
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (20) Pool/Spa - Private
- Work Description
- NEW 29-8" x 15'-0" POOL AND 8'-0" x 8'-0" SPA PER CITY STD. PLAN #268
- Permit Issued
- Issued on 5/25/2022
- Issuing Office
- Current Status
- CofO Issued on 8/29/2023
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 3/22/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 3/23/2022 | ALFRED RAMIREZ |
| Corrections Issued | 3/23/2022 | ALFRED RAMIREZ |
| Plan Check Approved | 5/13/2022 | ALFRED RAMIREZ |
| Building Plans Picked Up | 5/18/2022 | APPLICANT |
| Issued | 5/25/2022 | APPLICANT |
| CofO in Progress | 8/23/2023 | DAVID FEILER |
| Permit Finaled | 8/29/2023 | DANIEL ORRANTE |
| CofO Issued | 8/29/2023 | DANIEL ORRANTE |
| Permit Finaled | 8/29/2023 | DANIEL ORRANTE |
Permit Application Clearance Information
| Construction within easement | Cleared | 5/10/2022 | RIDWAN HARDY |
Contact Information
| Contractor | Intex Design And Construction Inc; Lic. No.: 981718-C53 | 15021 VENTURA BLVD STE 520 SHERMAN OAKS, CA 91403 |
| Engineer | Biedenbach,, Christopher James; Lic. No.: C74003 | 1201 N TUSTIN AVE ANAHEIM, CA 92807 |
Inspector Information
| WILBER ROSALES, (310) 914-3892 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 7/15/2022 | Corrections Issued | EVAN COOPER |
| Excavation/Setback/Form/Re-Bar | 7/28/2022 | Corrections Issued | EVAN COOPER |
| Pre-Gunite | 8/5/2022 | Approved | EVAN COOPER |
| Deputy Shotcrete | 8/16/2022 | Conditional Approval | MICHAEL PELHAM |
| Grounding or Bonding | 9/20/2022 | Partial Approval | EVAN COOPER |
| Pool/Spa Cover | 9/20/2022 | Partial Approval | EVAN COOPER |
| Enclosure/Fence | 9/26/2022 | Not Ready for Inspection | EVAN COOPER |
| Pre-Inspection | 9/26/2022 | Not Ready for Inspection | EVAN COOPER |
| Pre-Inspection | 10/20/2022 | Corrections Issued | EVAN COOPER |
| Enclosure/Fence | 4/14/2023 | Approved | JEREMY TODD |
| Equipment Noise Level | 5/16/2023 | Approved | ZEYDI STEWART |
| Equipment Noise Level | 5/23/2023 | Approved | ZEYDI STEWART |
| Excavation/Setback/Form/Re-Bar | 6/28/2023 | Approved | DAVID FEILER |
| Final | 6/28/2023 | Corrections Issued | DAVID FEILER |
| SGSOV-Seismic Gas S/O Valve | 6/28/2023 | SGSOV Not Ready | DAVID FEILER |
| Final | 8/2/2023 | Corrections Issued | ARAM AVEDISIAN |
| SGSOV-Seismic Gas S/O Valve | 8/2/2023 | SGSOV Not Ready | ARAM AVEDISIAN |
| Final | 8/15/2023 | No Access for Inspection | MEL KHACHATOURIAN |
| SGSOV-Seismic Gas S/O Valve | 8/15/2023 | SGSOV Not Ready | MEL KHACHATOURIAN |
| Final | 8/17/2023 | OK to Issue CofO | MEL KHACHATOURIAN |
| SGSOV-Seismic Gas S/O Valve | 8/17/2023 | SGSOV Approved | MEL KHACHATOURIAN |