564 N WILCOX AVE 90004
Certificate Information: 564 N WILCOX AVE 90004
- Application / Permit
- 22047-20000-00278
- Plan Check / Job No.
- B22VN02187
- Group
- Building
- Type
- Swimming-Pool/Spa
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (20) Pool/Spa - Private
- Work Description
- REMODEL THE (E) POOL. REPLASTER AND RAISE POOL DEPTH FROM 6' TO 5'. ADD L-SHAPED BENCHES, NEW AUTOMATIC POOL COVER, INSTALL NEW POOL HEATER AND FILTER AT EXISTING POOL EQ. LOCATION. WORK PER STANDARD PLAN #268 AND ENGINEER DETAILS.
- Permit Issued
- Issued on 3/10/2022
- Issuing Office
- Current Status
- CofO Issued on 12/27/2022
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 2/12/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 2/14/2022 | ROSENDO MEDINA |
| Corrections Issued | 2/14/2022 | ROSENDO MEDINA |
| Plan Check Approved | 3/10/2022 | ROSENDO MEDINA |
| Issued | 3/10/2022 | APPLICANT |
| Building Plans Picked Up | 3/11/2022 | APPLICANT |
| CofO in Progress | 7/19/2022 | RYAN SALAZAR |
| Permit Finaled | 12/27/2022 | DEROLD HAUFF |
| Permit Finaled | 12/27/2022 | DEROLD HAUFF |
| CofO Issued | 12/27/2022 | DEROLD HAUFF |
Permit Application Clearance Information
| HPOZ | Cleared | 2/28/2022 | STEVEN WECHSLER |
Contact Information
| Contractor | Josefzon Group The; Lic. No.: 1064933-B | 22287 MULHOLLAND HWY #614 CALABASAS, CA 91302 |
| Engineer | Biedenbach,, Christopher James; Lic. No.: C74003 | 1201 N TUSTIN AVE ANAHEIM, CA 92807 |
Inspector Information
| JEFFREY MEAD, (213) 202-3240 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 4/8/2022 | No Access for Inspection | CRAIG DAVIS |
| Rough-Plumbing | 4/8/2022 | No Access for Inspection | CRAIG DAVIS |
| Rough-Plumbing | 4/14/2022 | Corrections Issued | RUBEN SALAS |
| Excavation/Setback/Form/Re-Bar | 4/22/2022 | Not Ready for Inspection | ALIZAH MAYAGOITIA |
| Gas Piping or Gas Test | 4/22/2022 | Approved | ALIZAH MAYAGOITIA |
| Excavation/Setback/Form/Re-Bar | 4/28/2022 | Approved | ARTHUR SARGSYAN |
| Grounding or Bonding | 5/24/2022 | Approved | RYAN SALAZAR |
| Enclosure/Fence | 6/9/2022 | Approved | RYAN SALAZAR |
| Pool Equipment Noise Test | 7/1/2022 | Approved | ROBERT CHAVEZ |
| Final | 7/5/2022 | Partial Inspection | RYAN SALAZAR |
| SGSOV-Seismic Gas S/O Valve | 7/5/2022 | SGSOV Approved | RYAN SALAZAR |
| Final | 7/18/2022 | OK to Issue CofO | RYAN SALAZAR |